29.03.2013 Views

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />

PREFACE<br />

This Cyanide Management Plan has been prepared to meet the requirements of Consent Conditions<br />

5.3(b) and 8.2(b) of the Cowal <strong>Gold</strong> Project Development Consent. Where there is any conflict<br />

between the provisions of this Cyanide Management Plan and the applicable statutory requirements<br />

(i.e. licences, permits, consents and relevant laws) the statutory requirements are to take precedence.<br />

In accordance with Consent Condition 3.2 this Cyanide Management Plan is to be revised/updated at<br />

least every five years, or as otherwise directed by the Director-General for Planning, in consultation<br />

with the relevant government authorities. In accordance with Consent Condition 8, the cyanide<br />

monitoring programme is to be revised/updated annually, unless otherwise directed by the Director-<br />

General through the Annual Environmental Management Report process.<br />

It is the responsibility of <strong>Barrick</strong> to refer to the latest versions of statutory instruments or guidelines that<br />

are referenced in this Cyanide Management Plan, but have not been appended.<br />

HAL-02-07/1/25/CMP-01-Q.DOC BARRICK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!