January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />
PREFACE<br />
This Cyanide Management Plan has been prepared to meet the requirements of Consent Conditions<br />
5.3(b) and 8.2(b) of the Cowal <strong>Gold</strong> Project Development Consent. Where there is any conflict<br />
between the provisions of this Cyanide Management Plan and the applicable statutory requirements<br />
(i.e. licences, permits, consents and relevant laws) the statutory requirements are to take precedence.<br />
In accordance with Consent Condition 3.2 this Cyanide Management Plan is to be revised/updated at<br />
least every five years, or as otherwise directed by the Director-General for Planning, in consultation<br />
with the relevant government authorities. In accordance with Consent Condition 8, the cyanide<br />
monitoring programme is to be revised/updated annually, unless otherwise directed by the Director-<br />
General through the Annual Environmental Management Report process.<br />
It is the responsibility of <strong>Barrick</strong> to refer to the latest versions of statutory instruments or guidelines that<br />
are referenced in this Cyanide Management Plan, but have not been appended.<br />
HAL-02-07/1/25/CMP-01-Q.DOC BARRICK