• Measure thermal characteristics of the drive train after stabilization at rated power.<br />
• Run a gearbox endurance test equivalent to 20 years turbine operation.<br />
• Verify sufficient lubrication in idling situations without grid (oil supply pump not running)<br />
with different oil temperatures.<br />
The unit was tested from November 2002 until February 2003 for a total of 1,600 hours of test<br />
time. The target test torque load was approximately 130% of the design load to accelerate test<br />
time to equal gear tooth fatigue of 20 years. A teardown inspection of the gearbox was performed<br />
following the testing. The conclusions of the inspection were that after a test of fatigue<br />
damage equal to the design life of 20 years, the transmission was in serviceable condition. There<br />
were no components with breakage or extraordinary wear.<br />
Figure 18. Drivetrain Layout of NGT Proof of Concept 1.5 MW <strong>Turbine</strong><br />
3.1.3 Controls System Design<br />
The coupling of pitch and torque control was identified as a promising concept in the concept<br />
studies phase of the project and is incorporated in the POC turbine. The POC main control cabinet<br />
is illustrated in Figure 22.<br />