least 20 years of equivalent loading, the design life of the blade, without significant loss of global<br />

properties. In summary, NWTC concluded from the fatigue tests that the blade sustained the full<br />

load spectrum without significant loss of properties, including stiffness and ability to carry load.<br />

3.1.5 POC Hub Analysis<br />

Table 5. Test Equivalent Damage<br />

Spanwise Test Life (Years) Notes<br />

Station<br />

z [m]<br />

Flap Edge<br />

6.4 16.4 2.0<br />

9.2 25.9 5.6<br />

12.8 37.3 21.7 Critical Flap Station<br />

16.9 20.2 37.6 Critical Edge Station<br />

20.9 0.1 5.0<br />

Figure 30 shows the POC hub on the floor of GE's manufacturing plant. During the NGT program,<br />

concern arose that much better fatigue properties for the GGG40.3 ductile cast iron used in<br />

the hub were required. A subcontract was issued to conduct an exhaustive materials characterization<br />

effort for this material. Analyses of the hub static stresses and fatigue concluded that, with a<br />

redesign of one small part, the hub does not appear to have any fatigue-driven problems. Therefore,<br />

it was concluded that the hub is acceptable in fatigue for greater than 20 years.<br />

3.2 Installation and Testing of the Proof of Concepts <strong>Turbine</strong><br />

The POC turbine was erected at the GE facility in Tehachapi, California. Installation was completed<br />

in April 2000. The turbine was installed on a free-standing 63-m tubular steel tower on a<br />

5-m concrete pedestal foundation. The rotor installation is illustrated in Figure 31, and the completed<br />

POC turbine is shown in Figure 32.<br />

Certification testing of the POC turbine for noise, loads, power performance, and power quality<br />

has been completed under the supervision of personnel of the National Renewable Energy Laboratory.<br />