3.2.1 Power Performance Testing of the POC <strong>Turbine</strong><br />

Power performance testing was conducted on the POC turbine between February 9, 2001 and<br />

March 21, 2001. A total of 265 hours of data with wind out of the acceptable wind directions<br />

(295° to 335°) and with the turbine available was collected during that time. Figure 33 compares<br />

the measured and theoretical power curves.<br />

Power (kW)<br />

1800<br />

1600<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Theoret ical E GEWE nron 2/ Measured 6-21/ 01<br />

P <strong>NREL</strong> reliminar Measured y <strong>NREL</strong><br />

0 5 10<br />

<strong>Wind</strong> Speed<br />

15 20<br />

Figure 33. Comparison of Theoretical and Measured POC Power Curves<br />

3.2.2 Power Quality Testing of the POC <strong>Turbine</strong><br />

Power Quality testing of the POC turbine was conducted between May 31, 2001 and June 25,<br />

2001. A total of 973 hours of data were collected while the turbine was available, but only 315<br />

hours of data was recorded during 10-minute intervals during which the turbulence intensity was<br />

between 8% and 16%, as required by the IEC 61400-21 Power Quality Standard. The testing<br />

consisted of a long-term phase and a short-term phase, conducted between 31 May and 9 June.<br />

The tests conducted as part of the power quality testing were:<br />

• Maximum measured power (60-second and 0- and 2-second), reactive power demand<br />

• <strong>Turbine</strong> start and stop tests<br />

• Voltage fluctuations (flicker)<br />

• Current imbalance measurements<br />

• Voltage and current harmonics.<br />

The results of the testing indicated no power quality problems for the POC turbine.<br />

3.2.3 Mechanical Loads Testing of the POC <strong>Turbine</strong><br />

Mechanical loads testing was conducted on a production GE1.5/70 turbine installed in a wind<br />

farm at Desert Sky, Texas. Loads were determined to be acceptable.<br />

58