02.06.2013 Views

ANNUAL REPORT - Dc Msme

ANNUAL REPORT - Dc Msme

ANNUAL REPORT - Dc Msme

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annual Report<br />

2010-11<br />

Chapter IV - DC (MSME)<br />

development, export promotion,<br />

skill development, technology<br />

upgradation, exposure visits,<br />

etc. and setting up of common<br />

facilities.<br />

4.11.2 The Ministry simultaneously<br />

continued to implement a<br />

separate Integrated Infrastructural<br />

Development Scheme (IID)<br />

[started in 1994] for setting up of<br />

industrial estates and to develop<br />

infrastructure facilities like power<br />

distribution network, water,<br />

telecommunication, drainage,<br />

roads, storage and marketing<br />

outlets, common service facilities,<br />

etc. The IID Scheme also provided<br />

for upgradation/ strengthening of<br />

the infrastructural facilities in the<br />

existing industrial estates.<br />

4.11.3 In accordance with the<br />

decision of the Cabinet Committee<br />

on Economic Affairs (CCEA),<br />

while approving the Package for<br />

Promotion of Micro and Small<br />

Enterprises, the Scheme was<br />

renamed as Micro and Small<br />

Enterprises – Cluster Development<br />

84<br />

Programme (MSE-CDP) and<br />

the Integrated Infrastructural<br />

Development (IID) Scheme of the<br />

Ministry was subsumed under<br />

MSE-CDP with its existing funding<br />

pattern, in October 2007.<br />

4.11.4 Based on the<br />

recommendations emerging out<br />

of the evaluation of schemes<br />

and after consultation with the<br />

senior functionaries of the State<br />

Governments, it was felt necessary<br />

to modify the guidelines which<br />

envisage streamlining of procedures,<br />

providing a more holistic approach<br />

to the development of clusters<br />

and enhanced level of financial<br />

assistance, which are as under:<br />

(i) Enhancement of the maximum<br />

project cost for Common<br />

Facility Centre (CFC) from<br />

Rs.10 crore to Rs.15 crore, with<br />

GoI contribution of 70% (90%<br />

for Special Category States<br />

and for clusters with more<br />

than 50% women/micro/<br />

village/SC/ST units);<br />

(ii) Enhancement of the maximum<br />

MSME

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!