Chapter<br />

3<br />

10<br />

Invitation to tender<br />

3.2.5 Window fittings (hardware) ➔<br />

The window fittings have to meet the requirements of DIN EN 13126. They<br />

have to be manufactured and protected against corrosion according to the<br />

expected strains. The informations of the manufacturer of the fittings have<br />

to be taken into consideration.<br />

Accessory parts as e.g. limiters are to be cited in individual position descriptions.<br />

The operating height of the handle has to be determined and<br />

the handles are to be fixed (if appropriate) in each room at the same<br />

height. The window handles have to be in the same colour, surface etc. as<br />

indicated.<br />

3.2.6 Glazing bars ➔<br />

Beside glazing bars dividing the glazed profiles with or without a distance<br />

piece in the space between the panes (sbp/SZR) as well as systems inserted<br />

into this space can be used. In case of glazing bars in the sbp/SZR it is possible<br />

that they can contact the glass surface as a result of the opening and<br />

closing of the window or of other mechanical influences. This may cause a<br />

rattling noise.<br />

3.3 3.3 General technical requirements<br />

3.3.1 Dimensions of the windows ➔<br />

Before the fabrication starts, the consignee is responsible for making the necessary<br />

final measurements (the reference marker has to be made by the carcass<br />

manufacturer). If the carcass tolerances are over the guidelines of DIN 18202<br />

the client has to be informed verbally and in writing without delay.<br />

We emphasise particularly that, as a basic principle, according to § 4 No.<br />

3 VOB/B, the consignee has to complete obligation for checking and indication.<br />

3.3.2 Working at height ➔<br />

When working at height is needed, scaffolding may be required and the director<br />

of works needs to be contacted in good time. Working practises should<br />

comply with the employer’s insurance requirements and, if necessary, any site<br />

regulations.<br />

All scaffolding necessary for inside and all movable platforms up to 2 m are<br />

to be made available by the consignee. The resulting costs are to be included<br />

in the calculation of the flat prices.<br />

If the consignee has to make scaffolding available, the regulation on<br />

which the corresponding offer is made is DIN 18451. For that reason this<br />

specification contains a service item.<br />

3.3.3 Waste disposal ➔<br />

<strong>Windows</strong> and other building components which have to be removed in conjunction<br />

with the specifications in the invitation to tender, as well as other<br />

waste, are to be disposed of according to the Environmental Protection<br />

regulations. Note any special local regulations!<br />

If the waste contains harmful substances the client has to be informed<br />

verbally and in writing without delay.<br />

Operating height (from FFL):<br />

From to mm<br />

Design of window handles:<br />

No glazing bars<br />

Glass dividing<br />

Affixed with distance piece<br />

Affixed without distance piece<br />

Glazing bars in the space<br />

between panes<br />

Sightline:<br />

Measurements<br />

Complete<br />

Incomplete<br />

RAL-GÜTEGEMEINSCHAFT KUNSTSTOFF-FENSTERSYSTEME<br />

mm<br />

Scaffold provided by the customer<br />

Scaffold to be provided<br />

Components which have to be removed<br />

Number of windows<br />

Number of doors<br />

Other