Planning of the installation<br />

5. Planning of the installation<br />

The planning of the installation can start after the final<br />

measurements. Therefore the following points are to be<br />

considered:<br />

● To simplify the operation, the areas of responsibilities are<br />

to be precisely defined and clearly named. (e.g. is the in-<br />

stallation company responsible for all sealings? Is clean-<br />

ing necessary? etc.)<br />

● In general, the extra work and specific performances de-<br />

scribed in the offer shall be controlled during the final<br />

measurements.<br />

● The condition of the window recess under the window,<br />

which is to be removed, is important for the choice of the<br />

right fixing agent, especially in case of reconstruction of<br />

old buildings.<br />

● It is also to be clarified if the removal of the old windows<br />

and their disposal is to be calculated as extra work or spe-<br />

cific performance.<br />

5.1 Organisational planning<br />

■ Points of intersection / area of responsibility<br />

- steel trowel finish of the window respond in the case of<br />

new buildings<br />

- sealing of the windows<br />

- plastering of the inner recess<br />

■ Control of the procedure documentation<br />

- finale measurements and position plans<br />

- technical drawings or isothermal representations<br />

- work instructions<br />

- list of material<br />

■ Removal of the old window in case of renovation<br />

- schedule<br />

- announcement of the works<br />

- disposal or recycling of the old windows<br />

■ Installation of the new windows<br />

- time planning<br />

- cleaning, remove protective foil<br />

- make the hand-over or at least arrange it<br />

■ General details<br />

- training of the personnel<br />

- in case of window walls use only the permitted assem-<br />

bling auxiliaries<br />

- avoid soiling, especially in case of coloured profiles<br />

5.2 Installation planning<br />

If not emphatically required, all elements are to be installed<br />

vertically, horizontally and flushly. If the exact position of the<br />

windows and doors in the building is not exactly defined, it has<br />

to be stipulated in writing with the customer or with the planner.<br />

5.2.1 Fastening in the building<br />

The fastening of the windows and doors in the building is the<br />

basis of the installation. All forces affecting the window ac-<br />

cording to plan have to be transferred into the building. This<br />

must be done before the fastening with the necessary security<br />

and with regard to the movements occuring in the interface.<br />

5.2.2 General principles<br />

According to the German Building Regulations of the Land the<br />

windows have to be anchored in such a way that neither life and<br />

health of people are in danger nor public safety compromised.<br />