Euroview 70 Technical Manual - West Coast Vinyl Windows
Euroview 70 Technical Manual - West Coast Vinyl Windows
Euroview 70 Technical Manual - West Coast Vinyl Windows
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter<br />
6<br />
34<br />
The installation<br />
Fastening in<br />
old buildings<br />
For the fastening of the main frame in the bottom part,<br />
choose fasteners which do not inevitably open the armouring<br />
chamber from the recess depth.<br />
If this is not possible, seal the armouring chamber resist-<br />
antly.<br />
RAL-GÜTEGEMEINSCHAFT KUNSTSTOFF-FENSTERSYSTEME<br />
seal<br />
Claw/tie bolt Angle Tubular frame dowel<br />
Caution: Ensure<br />
that load do not<br />
cause damage<br />
Consider the dimensioning<br />
of the load transferring<br />
building components<br />
Fixing bracket<br />
seal seal<br />
Tubular frame dowel Tapping screw<br />
Fig. 14: Fasteners for the lower<br />
element fastening<br />
The choice of the fasteners is made according to the type of<br />
masonry.<br />
Angle<br />
In case of vertically perforated brick masonry, the masonry<br />
has to be filled in the area of the dowels (e.g. utilisation of<br />
injection mortar Fischer FIS VS 150 C). According to fig. 14<br />
different connections are possible.<br />
Caution: Ensure<br />
that load do not<br />
cause damage