03.08.2013 Views

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- 43 -<br />

c) Detailed step by step procedure for operation, maintenances and<br />

repairs of the system and individual equipments, indicating procedure for troubleshooting,<br />

measurement of various signals at different points and diagnostic check to be<br />

adopted for repairs at site.<br />

d) Details of various RCC modules indicating rating and modification<br />

number and layout of equipment.<br />

10 Details of SCADA software, including operating instructions.<br />

14.5 Only after all the designer and drawings have been approved and<br />

clearance given by RDSO to this xxxx the manufacturer shall take up manufacturer of the<br />

prototype unit for RDSO inspection. It is so clearly understood that any change required<br />

to be done in the prototype unit as required RDSO shall be done expeditiously.<br />

14.5 The successful tenderer shall be required to supply 3 prints of the final<br />

approved drawings and 3 dates of reproducible tracings.<br />

14.6 The successful tenderer shall supply 10 copies of technical booklets giving<br />

detailed description of the equipment, constructional features, ratings and characteristics<br />

and instruction for operation and maintenance of the system as well as of individual<br />

equipment.<br />

15. Training of Railway staff<br />

The offer shall include the training of two Engineers and six Supervisors<br />

of the Indian Railways free of cost at the manufacturers in India and abroad. The total<br />

duration of training shall be <strong>12</strong> weeks, of which approximately six weeks will be at<br />

manufacturers works and six weeks on a railway system or 0ther pubic utility. The cost of<br />

travel to the country of manufacture and back will be borne by the Indian Railways.<br />

Other details shall be settled at the time of finalising the contract or purchase order.<br />

The training shall cover the following aspects:<br />

a) Study of system engineering and trouble shooting of all modules<br />

and system faults.<br />

b) Training in operation of SCADA equipment and Man-Machine<br />

interaction.<br />

c) Erection, testing, commissioning and adjustments required in<br />

service of the equipment.<br />

16. Warranty<br />

16.1 The SCADA equipment supplied against a purchase order/contract in which<br />

this specification is quoted, irrespective of origin of individual equipment<br />

(imported/indigenous), shall be guaranteed for trouble-free and satisfactory performance<br />

for a period of 18 months from the date of supply or <strong>12</strong> months from the date of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!