SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso
SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso
SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
- 43 -<br />
c) Detailed step by step procedure for operation, maintenances and<br />
repairs of the system and individual equipments, indicating procedure for troubleshooting,<br />
measurement of various signals at different points and diagnostic check to be<br />
adopted for repairs at site.<br />
d) Details of various RCC modules indicating rating and modification<br />
number and layout of equipment.<br />
10 Details of SCADA software, including operating instructions.<br />
14.5 Only after all the designer and drawings have been approved and<br />
clearance given by RDSO to this xxxx the manufacturer shall take up manufacturer of the<br />
prototype unit for RDSO inspection. It is so clearly understood that any change required<br />
to be done in the prototype unit as required RDSO shall be done expeditiously.<br />
14.5 The successful tenderer shall be required to supply 3 prints of the final<br />
approved drawings and 3 dates of reproducible tracings.<br />
14.6 The successful tenderer shall supply 10 copies of technical booklets giving<br />
detailed description of the equipment, constructional features, ratings and characteristics<br />
and instruction for operation and maintenance of the system as well as of individual<br />
equipment.<br />
15. Training of Railway staff<br />
The offer shall include the training of two Engineers and six Supervisors<br />
of the Indian Railways free of cost at the manufacturers in India and abroad. The total<br />
duration of training shall be <strong>12</strong> weeks, of which approximately six weeks will be at<br />
manufacturers works and six weeks on a railway system or 0ther pubic utility. The cost of<br />
travel to the country of manufacture and back will be borne by the Indian Railways.<br />
Other details shall be settled at the time of finalising the contract or purchase order.<br />
The training shall cover the following aspects:<br />
a) Study of system engineering and trouble shooting of all modules<br />
and system faults.<br />
b) Training in operation of SCADA equipment and Man-Machine<br />
interaction.<br />
c) Erection, testing, commissioning and adjustments required in<br />
service of the equipment.<br />
16. Warranty<br />
16.1 The SCADA equipment supplied against a purchase order/contract in which<br />
this specification is quoted, irrespective of origin of individual equipment<br />
(imported/indigenous), shall be guaranteed for trouble-free and satisfactory performance<br />
for a period of 18 months from the date of supply or <strong>12</strong> months from the date of