03.08.2013 Views

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SPECICATION NO. ETI/PSI/144 (12/91) SPECIFICATION FOR ... - rdso

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7. 220/132/110/66kV transmission line circuit-1 P.T. fuse fail<br />

(wherever required).<br />

8. 220/132/110/66kV transmission line circuit-2 P.T. fuse fail<br />

(wherever required).<br />

* There is no separate telesignal for PT fuse fail indication. The<br />

annunciation for PT fuse fail indication shall be done in case of any inconsistency<br />

between the status of feeder circuit breaker/paralleling interruptor and the catenary<br />

indications. (Feeder circuit breaker/paralleling interruptor when under power block is to<br />

be treated as ‗open‘ for this purpose.)<br />

(b) For each Scott-connected/single phase Traction Power Transformer, Auto<br />

transformer and associated switchgear<br />

(i) From transformer-1<br />

*9. TR-1 Alarm.<br />

**10. TR-1 Fault<br />

***11. TR-1 Trip circuit 110V dc fail<br />

<strong>12</strong>. TR-1 220/132/110/60 LV circuit breaker ―Locked –out‖ due<br />

to low gas/air pressure.<br />

13 TR-1 25kv CD-1 ―Locked out‖ due to low gas/air pressure<br />

14-19 TR-1 tap 1 to 6 position<br />

20 TR-1 Blower fans working<br />

21 TR-1 25kV CB-2 ―Locked-out‖ due to low gas/air pressure<br />

(In case of Scott-connected transformer only).<br />

* TR-1 Alarm: This has to come whenever any alarm viz. Buchholz Alarm,<br />

pressure relief device alarm, oil/winding temperature my high alarm and low oil level<br />

alarm occurs.<br />

** TR-1 fault: This has to come whenever the inter-trip relay (which trips both<br />

HV and LV breakers of the transformer) operates.<br />

*** TR-1 trip-circuit fail: Whenever the 110V dc supply to the control circuits<br />

fails or any of the trip circuits of 220/132/110/66kV or 25kV transformer circuit breakers<br />

fails.<br />

Necessary auxiliary contacts of various relays/indicators suitably wired up<br />

and terminated on the control and relay board at traction sub-station shall be provided by<br />

the Railways. Suitable relays or circuits required in the RTU at TSS for the telesignal<br />

shall be provided by the successful tenderer.<br />

(ii) From Transformer-2<br />

22 to 34-as for TR-1<br />

(iii) From Transformer-2(as required)<br />

35 to 47-as for TR-1<br />

(iv) From Auto Transformer-1<br />

*48. AT-1 Alarm<br />

**49. AT-1 Fault<br />

* AT-1 alarm: This has to come whenever any alarm viz. Suchholz<br />

alarm, pressure relief device alarm, oil/winding temperature high alarm and low<br />

oil level alarm occurs.<br />

** AT-1 fault: This has to come whenever any fault in the transformer is<br />

- 8 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!