indicated by operation of Buchholz relay, pressure, relief device, winding<br />

temperature indicator and oil temperature indicator.<br />

Necessary auxiliary contacts of various relays/indicators suitably wired<br />

up and terminated on the control and relay board/terminal board shall be provided<br />

by the Railways. Suitable relays or circuits required in the RTU for the telesignal<br />

shall be provided by the successful tenderer.<br />

5 From AT-4<br />

(v) From AT-2<br />

(vi) From AT-3<br />

50-51-as for AT-1<br />

52-53-as for AT-1<br />

54-55-as for AT-1<br />

(c) Common telesignals for TR-1 to TR-3 and AT1 to AT4<br />

56. 110V dc supply for alarm circuits fail.<br />

(d) For each feeder circuit breaker<br />

(i) For feeder-1<br />

(ii) For feeder CB-2<br />

57. Feeder CB-1 DPR operated.<br />

58. Feeder CB-1 instantaneous OCR operated.<br />

59. Feeder CB-1 Delta-I relay operated.<br />

60. Feeder CB-1 ―Locked out‖ due to low gas/air pressure<br />

61. Auto-recloser for CB-1 ―Locked-out‖.<br />

62 to 66-as for feeder CB-1<br />

(iii) For feeder CB-3<br />

67 to 71-as for feeder CB-1<br />

(iv) For feeder CB-4<br />

72 to 76-as for feeder CB-1<br />

(c) For shunt capacitor bank control (as required)<br />

(i) Bank-1<br />

(ii) Bank-2<br />

77. CB ―Lockedout‖ due to low gas/air pressure.<br />

78. PT fuse fail<br />

79. Shunt capacitor bank fail<br />

80 to 82-as for bank-1<br />

* The shunt capacitor bank may be provided with a potential free 11/0 contact<br />

- 9 -