04.08.2013 Views

Contract for Hiring Services of different types of call basis ... - GAIL

Contract for Hiring Services of different types of call basis ... - GAIL

Contract for Hiring Services of different types of call basis ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.1 The successful bidder shall deposit with <strong>GAIL</strong>, an amount <strong>of</strong><br />

Rs.15,000/- per vehicle as security deposit in the <strong>for</strong>m <strong>of</strong><br />

demand draft from a Nationalized Bank or a Bank Guarantee in<br />

favour <strong>of</strong> <strong>GAIL</strong> as per Per<strong>for</strong>ma enclosed in GCC. The validity period<br />

shall be up to 3 months after contractual completion date.<br />

8.2 The security deposit shall be refunded within three months after<br />

successful completion <strong>of</strong> contract period after adjustment <strong>of</strong> any<br />

dues <strong>of</strong> <strong>GAIL</strong><br />

8.3 No interest shall be paid by <strong>GAIL</strong> on EMD/SD <strong>of</strong> tenderer/contractor.<br />

The EMD <strong>of</strong> unsuccessful tenderer shall be refunded without any<br />

interest thereon within one month after final decision on the<br />

tenders has been taken.<br />

8.4 In case the tenderer backs out from his <strong>of</strong>fer or fails to supply the<br />

vehicle(s) after the <strong>of</strong>fer <strong>of</strong> the tenderer having been accepted by<br />

<strong>GAIL</strong>, the EMD deposited by the tenderer shall be <strong>for</strong>feited.<br />

9 Liquidated Damages/Compensation : (see Special Conditions).<br />

9.1 Hired vehicle must report <strong>for</strong> duty with sufficient fuel <strong>for</strong> 350 km.<br />

run. If sufficient fuel is not available, then km. run and time<br />

consumed in refueling will be on contractor’s account.<br />

9.2 If the vehicles are not provided, <strong>GAIL</strong> reserves the right to<br />

hire the vehicles from the market. Any additional amount incurred<br />

shall be to contractor’s account and the same shall be recovered<br />

from the bills or any other dues <strong>of</strong> the contractor.<br />

10 Damages to the <strong>GAIL</strong>.<br />

The cost/ liquidated damages are also recoverable from the<br />

contractor if such hired vehicles on the service <strong>of</strong> <strong>GAIL</strong> cause<br />

damage to any equipment material or property belonging to <strong>GAIL</strong>.<br />

The valuation <strong>of</strong> damages to be decided by <strong>GAIL</strong> shall be binding<br />

on the <strong>Contract</strong>or.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!