The material excavated from the turbine foundation area will be retained on site.<br />

Approximate Vehicle Trips<br />

Numbers shown are for in and out:<br />

Stone: 248 trips<br />

Concrete: 10 trips<br />

Reinforcement: 2 trips<br />

Cables: 4 trips<br />

General Waste: 2 trips<br />

Miscellaneous: 2 trips<br />

Plant: Low loader – 20t excavator x 2<br />

Low loader – 8t excavator x 2<br />

Dump truck x 2<br />

Abnormal Loads: Crane x 2<br />

Total: 284<br />

Low Loader x 2 – crane equipment<br />

Turbine x 6 – the turbine arrives in 3 parts, column blades and nacelle<br />

Should suitable material be found on site, including concrete batching, the numbers indicated could be<br />

reduced.<br />

3.10.4 Right of Way<br />

The OS mapping of the site and the information held by the Local Authority do not denote any paths<br />

crossing the site. The small number of tracks that are denoted are expected to be farm tracks and their<br />

status as public rights of way is very unlikely. A site visit confirmed that there are no tracks adjacent to<br />

the proposed wind turbine location.<br />

3.11 Aviation/NATS/MOD & Telecommunication<br />

3.11.1 Aviation/NATS/MOD<br />

Wind turbine interaction with aviation operations, civil and military aerodromes and other air navigation<br />

service providers, present two main obstructions.<br />

1) Physical obstruction<br />

2) Impact on radar services<br />

It is understood that the Ministry of Defence (MOD), the Civil Aviation Authority (CAA) and National Air<br />

Traffic Control Services Ltd (NATS) will need to be consulted over the propose wind turbine site. The<br />

“Wind Farm Developers Application Proforma” was sent on the 12 nd October 2011 to the MOD and CAA<br />

in relation to the erection of the proposed wind turbine and we are awaiting a response.<br />

Waterman Group, Renewable Energy, 2/4 Canning Street Lane, Edinburgh, EH3 8ER T:0131 221 7020<br />

21<br />

K:\Projects\CIV12920_ILI Windfarms_Batch 7\CIV12920_XXX_Hartfield<br />

Farm\Documents\Reports\CIV12920_1202xx_Hartfield_<strong>Supporting</strong> Turbine Assessment_225kW.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!