5. Summary<br />

This site has been considered using various criteria including wind speeds, site area, proximity to grid<br />

connections, flexible consideration of altitude and location site gradients, site access, protection<br />

designations and minimum separation from habitation. The findings from this review of the key criteria<br />

are listed below and contained in-depth, within the main body of this document.<br />

• Environmental Designation Review: The positioning of the wind turbine has taken account<br />

of the local designations and avoided areas of special scientific interest and high wildlife<br />

value. The turbine is not predicted to pose a risk to the natural environment. The turbine’s<br />

location is not in an area of high environmental sensitivity.<br />

• Local Policy: The local policy has been reviewed and taken into consideration when<br />

developing this proposal. The turbine is positioned near a field boundary to minimise the<br />

amount of productive farmland lost, and is as far away from houses as possible.<br />

• Hydrology: No impact on watercourses or ground water is predicted from the development.<br />

The proposed turbine location is outside the indicative flood plain of local watercourses.<br />

• Archaeology: Entries on the National Monuments Record of Scotland were considered<br />

during the site selection and positioning of the turbine and further investigation is not<br />

deemed necessary.<br />

• Visual Impact: The size of the proposed turbine at a tip height of 45.9m has reduced visual<br />

impact and suited to development within lowlands. The site and proposed turbine size is<br />

unlikely to raise concerns regarding visual impact. The location and choice of the proposed<br />

turbine was carefully selected to provide the necessary performance without introducing<br />

unacceptable visual intrusion. The turbine is of a size that is compatible with the<br />

surrounding landscape.<br />

• Noise: The closest noise receptors other than the applicant where identified at being 420m<br />

away, and noise is expected to be below ETSU guidance limits. Noise is not predicted to<br />

be a problem.<br />

• Shadow flicker: The impacts from shadow flicker were described and identified and are not<br />

predicted to be a problem.<br />

• Transport and Access: Access and transport routes can be made via the B775. Structures<br />

that are anticipated to require weight capacity assessments along the transport route will<br />

be assessed in consultation with the local and national road authorities prior to<br />

construction. Access will be gained from a newly constructed access road.<br />

• Wind: The expected average wind speed is approximately 8.06m/s, and is of a suitable<br />

threshold for renewable power generation by the turbine.<br />

Consultation and a site visit by engineering and development personnel have highlighted that this site is<br />

suitable for development of a single wind turbine.<br />

Waterman Group, Renewable Energy, 2/4 Canning Street Lane, Edinburgh, EH3 8ER T:0131 221 7020<br />

30<br />

K:\Projects\CIV12920_ILI Windfarms_Batch 7\CIV12920_XXX_Hartfield<br />

Farm\Documents\Reports\CIV12920_1202xx_Hartfield_<strong>Supporting</strong> Turbine Assessment_225kW.docx