WIND SPEED AT 45M ABOVE GROUND LEVEL (in m/s)<br />

8.1 8.2 8.3<br />

8.6 8.5 8.5<br />

8.6 8.6 8.6<br />

WIND SPEED AT 25M ABOVE GROUND LEVEL (in m/s)<br />

7.5 7.6 7.6<br />

8.1 7.9 7.8<br />

8.1 8 8.0<br />

WIND SPEED AT 10M ABOVE GROUND LEVEL (in m/s)<br />

6.7 6.8 6.8<br />

7.5 7.1 7<br />

7.4 7.3 7.4<br />

Table 8: RenewableUK Windspeed Data for NS4258<br />

3.15 Electrical Grid Connection Assessment<br />

The main technical consideration for the site is where the likely electrical connection to the grid might<br />

occur. There are also consideration surrounding costs associated with diversion, access and point of<br />

connection. Connection to the grid would be the subject to a separate Section 37 Electricity Act 1989<br />

application by Scottish Power as they are the local operator of the gird within this area.<br />

The closest electrical grid connection is currently being investigated with Scottish Power and will be<br />

developed further allowing an assessment on site risk capital cost of connection. From reviewing Scottish<br />

Power drawings the nearest primary hub substation is 3.5km from the site. In addition there is a 11kV<br />

overhead line network in the area. We therefore, see no constraints to development in relation to grid<br />

connection at this stage.<br />

3.16 Health and Safety<br />

The wind turbine specified for the proposed development will be designed and manufactured to<br />

international engineering design and manufacturing standards, including British Standard BS EN 61400-<br />

1:2005 and European Standard EN 50308:2004. The proposed development will be required to comply<br />

with all UK legislation, regulations and codes of practices and guidance, including the Health and Safety<br />

at Work Regulations and RenewableUK’s “Guidelines for Onshore and Offshore Wind Farms: Health &<br />

Safety in Wind Energy Sector”<br />

A common concern for the public is the potential for blade shear, ice throw and ice shear. Blade shear is<br />

where a part of a blade shred from the main body of the turbine. There is no known case or incidents of<br />

an injury caused to member of the public by such an incident.<br />

Waterman Group, Renewable Energy, 2/4 Canning Street Lane, Edinburgh, EH3 8ER T:0131 221 7020<br />

27<br />

K:\Projects\CIV12920_ILI Windfarms_Batch 7\CIV12920_XXX_Hartfield<br />