Table 6: Consented Projects<br />
NAME &<br />
REGION<br />
KELBUR,<br />
NORTH<br />
AYRSHIRE<br />
DATE<br />
APPROVED<br />
Table 7: Projects in Planning<br />
NOS. OF<br />
TURBINES<br />
PROJECT<br />
CAPACITY<br />
(MW)<br />
GRID REF DEVELOPER<br />
MARCH 2009 14 28 NS 245 555 RES<br />
NAME & REGION DATE LISTED NOS. OF<br />
TURBINES<br />
WATERHEAD MOOR<br />
RE-SUBMISSION,<br />
NORTH AYRSHIRE<br />
HARELAW<br />
RENEWABLE ENERGY<br />
PARK, EAST<br />
AYRSHIRE, EAST<br />
RENFREWHIRE<br />
COWANS LAW, EAST<br />
AYRSHIRE<br />
3.12.2 Local<br />
GRID REF<br />
SEPTEMBER 2010 29 NS 255 625<br />
JUNE 2009 40 NS 476 519<br />
SEPTEMBER 2008 25 NS 525 418<br />
No planning applications have been submitted on behalf of Intelligent Land Investments within a 7km<br />
radius of the proposed turbine site.<br />
3.13 Turbine Location<br />
Having considered site constraints and completed consultations, the turbine has been located as<br />
indicated below. There may be a need to adjust the turbine or access track location during construction<br />
due to conditions on site that are currently unknown. These will only be identified through detailed design.<br />
We therefore request a micrositing allowance of 25m.<br />
Waterman Group, Renewable Energy, 2/4 Canning Street Lane, Edinburgh, EH3 8ER T:0131 221 7020<br />
25<br />
K:\Projects\CIV12920_ILI Windfarms_Batch 7\CIV12920_XXX_Hartfield<br />
Farm\Documents\Reports\CIV12920_1202xx_Hartfield_<strong>Supporting</strong> Turbine Assessment_225kW.docx