14.08.2013 Views

Supporting Documentation - Renfrewshire Council

Supporting Documentation - Renfrewshire Council

Supporting Documentation - Renfrewshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 6: Turbine Location<br />

OS Map Data<br />

3.14 Wind Resource Assessment<br />

The wind speed at the proposed turbine location has been taken from the RenewableUK database and<br />

forms the basis of the energy yield assessment carried out during the review process.<br />

The turbine will be a 225kW turbine. The wind speed database for the turbine location has a yearly<br />

average wind speed of 8.5m/s at a height of 45m. However extrapolating the likely average wind velocity<br />

at a hub height of 32.4m, the expected wind speed on average is expected to be approximately 8.06m/s.<br />

As this speed is within the manufacture’s guideline range for operational wind speed, it is predicted to<br />

operate effectively for the majority of its lifetime.<br />

Waterman Group, Renewable Energy, 2/4 Canning Street Lane, Edinburgh, EH3 8ER T:0131 221 7020<br />

26<br />

K:\Projects\CIV12920_ILI Windfarms_Batch 7\CIV12920_XXX_Hartfield<br />

Farm\Documents\Reports\CIV12920_1202xx_Hartfield_<strong>Supporting</strong> Turbine Assessment_225kW.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!