Project Deliverable D50 Report on Best Practices ... - ESONET NoE
Project Deliverable D50 Report on Best Practices ... - ESONET NoE
Project Deliverable D50 Report on Best Practices ... - ESONET NoE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4.3.1.3 Debriefing<br />
- A document was issued as a c<strong>on</strong>tributi<strong>on</strong> of <strong>ESONET</strong> to the KM3Net. See Annex D.<br />
- The technological tests to be performed by the “Test Call” merged proposal of<br />
<strong>ESONET</strong> were presented as a handout. This document was used for the meeting in<br />
Barcel<strong>on</strong>a held by the coordinator to define a merged proposal. This work is reported<br />
in the <str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> D58.<br />
- The case study <strong>on</strong> Snohvit would need more input from Statoil to provide<br />
recommendati<strong>on</strong>s from <strong>ESONET</strong>.<br />
4.3.2 Design comparis<strong>on</strong> – Stand al<strong>on</strong>e observatories<br />
4.3.2.1 Introductory text<br />
This panel benefits from the experience of previous and/ or running projects (Animate<br />
EuroSites/PAP, Var cany<strong>on</strong>, Pirata buoys,…) and Dem<strong>on</strong>strati<strong>on</strong> Missi<strong>on</strong>s of <strong>ESONET</strong>. It is<br />
assumed that <strong>on</strong> some sites, the stand al<strong>on</strong>e observatories will be deployed to c<strong>on</strong>stitute a<br />
deep sea observatory infrastructure prior to cabled observatories.<br />
Am<strong>on</strong>g the topics of the panel:<br />
o General design issues (e.g. Rating of comp<strong>on</strong>ents, knock-down preventi<strong>on</strong>,<br />
materiel in use, software, corrosi<strong>on</strong>),<br />
o Protecti<strong>on</strong> of surface elements: Bio-Invasi<strong>on</strong>s (e.g. birds, mussels), Vandalism,<br />
Safety,<br />
o Data telemetry issues: underwater & surface ocean<br />
o Energy management,<br />
o Extensi<strong>on</strong> of deployment durati<strong>on</strong>,<br />
o Deployment and maintenance procedures,<br />
o Implementati<strong>on</strong> and exploitati<strong>on</strong> costs,<br />
o On shore organizati<strong>on</strong>: remote sensor c<strong>on</strong>trol, emergency interventi<strong>on</strong>s,<br />
o Synergy with other observatory comp<strong>on</strong>ents (e.g. AUV use for battery exchange,<br />
data retrieval).<br />
Two cost analysis have been performed inside <strong>ESONET</strong> WP5, <strong>on</strong>e for stand al<strong>on</strong>e winch<br />
observatories, established by AWI for the ARCTIC c<strong>on</strong>diti<strong>on</strong>s, and another <strong>on</strong>e for the stand<br />
al<strong>on</strong>e acoustic observatories.<br />
Objectives:<br />
One objective is to identify the technical and cost related topics to be followed up specifically<br />
in the Dem<strong>on</strong>strati<strong>on</strong> Missi<strong>on</strong>s using stand-al<strong>on</strong>e observatories and corresp<strong>on</strong>ding to<br />
communicati<strong>on</strong>. This panel will prepare a paper <strong>on</strong> comm<strong>on</strong> practices and give<br />
recommendati<strong>on</strong>s <strong>on</strong> technical implementati<strong>on</strong>s.<br />
4.3.2.2 Panel sessi<strong>on</strong>s<br />
Panel P2.2 – “Design comparis<strong>on</strong>-Stand al<strong>on</strong>e observatories” led by Johannes Karstensen<br />
(KDM-IFM-GEOMAR) and Jérôme Blandin (IFREMER).<br />
Infrastructure visit: Prototype facilities, marine materials labs and tour of IFREMER.<br />
Participants list:<br />
<str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> #50 - update October 2010 13