24.08.2013 Views

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 2: Sec<strong>on</strong>dary juncti<strong>on</strong> box offering various extensi<strong>on</strong> and c<strong>on</strong>necti<strong>on</strong><br />

capabilities. (IFREMER)<br />

C<strong>on</strong>nector Manifold plate<br />

This could be like the ROV tool plate with wet mateable c<strong>on</strong>nectors. Recommendati<strong>on</strong> for the<br />

distance between c<strong>on</strong>nectors, grabbing pressure, etc will be issued for the design and used for<br />

the operati<strong>on</strong> guide.<br />

The c<strong>on</strong>nectors and associated hardware can be spaced at a given distance apart and a given<br />

height above the sea floor. It will require a grab bar for ROV operati<strong>on</strong>s with the grab arm.<br />

<str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> #50 - update October 2010 81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!