24.08.2013 Views

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

Project Deliverable D50 Report on Best Practices ... - ESONET NoE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

o Existing or newly developed quality c<strong>on</strong>trol and assurance procedures.<br />

o Interacti<strong>on</strong> with manufacturer to derive recommendati<strong>on</strong>s for the user.<br />

Giving reference to a use case selected from demo missi<strong>on</strong> activities like the detecti<strong>on</strong> and<br />

classificati<strong>on</strong> of marine mammals by recording acoustic signals the applicati<strong>on</strong> of discussed methods<br />

will be highlighted.<br />

Working Group G2 – Infrastructure<br />

Panel 2-1 : Cabled observatories: design comparis<strong>on</strong> and tests<br />

Chairs: Jaume Piera (UPC) and Jean Marvaldi (Ifremer)<br />

Several subsea cabled observatories are operated or under final c<strong>on</strong>structi<strong>on</strong>. Some elements were<br />

presented during the First <strong>Best</strong> Practice Workshop in Bremen. This panel will update this informati<strong>on</strong>.<br />

The cost evaluati<strong>on</strong> performed by <strong>ESONET</strong> WP5 group will be reviewed and compared with<br />

standal<strong>on</strong>e soluti<strong>on</strong>s. The panel will look more carefully at <strong>on</strong>e case, taking into account the scientific<br />

objectives presented earlier in the week at the All Regi<strong>on</strong>s Workshop 2 in Paris. System engineering<br />

issues for the various comp<strong>on</strong>ents of the infrastructure will be addressed.<br />

For the remaining integrati<strong>on</strong> budget in <strong>ESONET</strong>, the Steering Committee decided to open a call for<br />

the partners. The main objective of the call is to promote test of equipment and instruments <strong>on</strong> cabled<br />

subsea observatory sites. The results of the two Dem<strong>on</strong>strati<strong>on</strong> Missi<strong>on</strong>s of Es<strong>on</strong>et showed a lack in<br />

the field of cabled observatories experiment.<br />

A unified proposal for test <strong>on</strong> cabled sites is under final acceptance process. It will be presented to the<br />

panel for discussi<strong>on</strong> and suggesti<strong>on</strong> according to the practices of the attendants.<br />

Objectives:<br />

One objective is to identify the technical and cost related topics to be addressed either through<br />

internati<strong>on</strong>al cooperati<strong>on</strong>, through the direct input of Antares, Nemo (European project operating<br />

cabled observatories) or through additi<strong>on</strong>al activities proposed as a reply to the “test call” issued in<br />

spring 2009 by Es<strong>on</strong>et.<br />

This panel will determine the needing studies necessary to establish what are the comm<strong>on</strong> practices<br />

and corresp<strong>on</strong>ding recommendati<strong>on</strong>s and write a short report <strong>on</strong> this matter (report to EMSO<br />

Preparatory Phase).<br />

Panel 2-2 : Stand al<strong>on</strong>e observatories: design comparis<strong>on</strong><br />

Chairs: Johannes Karstensen (IFM-GEOMAR) Jérôme Blandin (Ifremer)<br />

This panel benefits from the experience of a large community (Animate, Var cany<strong>on</strong>, Pirata buoys,…)<br />

and Dem<strong>on</strong>strati<strong>on</strong> Missi<strong>on</strong>s of <strong>ESONET</strong>. It is assumed that <strong>on</strong> some sites, the stand al<strong>on</strong>e<br />

observatories will be deployed to c<strong>on</strong>stitute a deep sea observatory infrastructure prior to cabled<br />

observatories.<br />

Am<strong>on</strong>g the topics of the panel:<br />

o General design issues (e.g. Rating of comp<strong>on</strong>ents, knock-down preventi<strong>on</strong>, materiel in use,<br />

software, corrosi<strong>on</strong>),<br />

o Protecti<strong>on</strong> of surface elements: Bio-Invasi<strong>on</strong>s (e.g. birds, mussels), Vandalism, Safety,<br />

o Data telemetry issues: underwater & surface ocean<br />

o Energy management,<br />

o Extensi<strong>on</strong> of deployment durati<strong>on</strong>,<br />

o Deployment and maintenance procedures,<br />

o Implementati<strong>on</strong> and exploitati<strong>on</strong> costs,<br />

o On shore organizati<strong>on</strong>: remote sensor c<strong>on</strong>trol, emergency interventi<strong>on</strong>s,<br />

<str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> #50 - update October 2010 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!