o Synergy with other observatory comp<strong>on</strong>ents (e.g. AUV use for battery exchange, data<br />
retrieval).<br />
Two cost analysis have been performed inside <strong>ESONET</strong> WP5, <strong>on</strong>e for stand al<strong>on</strong>e winch<br />
observatories, established by AWI for the ARCTIC c<strong>on</strong>diti<strong>on</strong>s, and another <strong>on</strong>e for the stand al<strong>on</strong>e<br />
acoustic observatories.<br />
Objectives:<br />
One objective is to identify the technical and cost related topics to be followed up specifically in the<br />
Dem<strong>on</strong>strati<strong>on</strong> Missi<strong>on</strong>s using stand al<strong>on</strong>e observatories and corresp<strong>on</strong>ding to communicati<strong>on</strong>. This<br />
panel will tend establish what are the comm<strong>on</strong> practices to be recommended and write a paper <strong>on</strong><br />
these issues.<br />
<str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> #50 - update October 2010 50