- Page 1 and 2:
A Solution <strong
- Page 3 and 4:
A Solution <strong
- Page 5 and 6:
Table of Contents Abstract 3 Acknow
- Page 7 and 8:
1.0 Introduction 1.1 Motivation Air
- Page 9 and 10:
class. Changes to
- Page 11 and 12:
classified into fo
- Page 13 and 14:
o Control the KG g
- Page 15 and 16:
the intact stabili
- Page 17 and 18:
for ships propulsion, respectively.
- Page 19 and 20:
combined with the
- Page 21 and 22:
1.3.7 Ballast Addition 1.3.7.1 Wate
- Page 23 and 24:
2% entrained air (by volume) in <st
- Page 25 and 26:
Tank name Tank volume Ballast type
- Page 27 and 28:
was successfully performed and <str
- Page 29 and 30:
of each tank's location was added,
- Page 31 and 32:
2.3 Preliminary Decision-Making Cos
- Page 33 and 34:
All further costin
- Page 35 and 36:
2.4 Structural Analysis One tank on
- Page 37 and 38:
this pressure. This resulted in a r
- Page 39 and 40:
2.4.1 Structural Modifications 2.4.
- Page 41 and 42:
Main Deck Shell FR 165 - FR 180 Tra
- Page 43 and 44:
2.4.1.3 Modifications to</s
- Page 45 and 46:
3.1 Final POSSE Results The minimum
- Page 47 and 48:
Table 6: Final Cost, Weight Additio
- Page 49 and 50:
Corrosion coupons are placed in all
- Page 51 and 52:
5.0 Recommendations 1. As can be se
- Page 53 and 54:
References [I] Design Data Sheet 07
- Page 55 and 56:
O CO ■*. CM d CVI d CVI d CO d CO
- Page 57 and 58:
1
- Page 59 and 60:
■ • s*; eo 1 CM ■
- Page 61 and 62:
■ E 1- < O Y < ^^ i SS! m c in in
- Page 63 and 64:
ON OC) 00 00 o o o ^ < ^ < o 00 o I
- Page 65 and 66:
«n < 1-H ON H ^ 0\ 1—1 i-( o ©
- Page 67 and 68:
in -^J r-- OS H 00 ■* ri o F^^ ^
- Page 69 and 70:
=» * o o o o o o o § § < S , , s
- Page 71 and 72:
i V) H % * l-H
- Page 73 and 74:
% H o o o © s * < © © o i^ © H
- Page 75 and 76:
* * H o o o o o o o o o e o o O o o
- Page 77 and 78:
M t» c« * ft ft H ft 00 O 00 r- O
- Page 79 and 80:
1^ r-( 1-H M n
- Page 81 and 82:
Vi ^■ ««■ -^ ^^ * * o o o o o
- Page 83 and 84:
4t S C/l r/i 00 * s M * o * < ly) C
- Page 85 and 86:
^5- Q © © © © © © o o © ©
- Page 87 and 88:
"~" ~ 00 s ^ SS o s ■g Q ■* ja
- Page 89 and 90:
structural Analysis for Compartment
- Page 91 and 92:
Resulting Pressure on Sponson Plati
- Page 93 and 94:
Calculations to De
- Page 95 and 96:
Stress Calculations: k = coefficien
- Page 97 and 98:
Stress Calculations: k = coefficien
- Page 99 and 100:
FR 165 - FR 180 Transverse Bulkhead
- Page 101 and 102:
Design of Plating for Surface Ships
- Page 103 and 104:
Stress Calculations: k = coefficien
- Page 105 and 106: Main Deck Shell FR 165 - FR 180 Tra
- Page 107 and 108: Calculations to De
- Page 109 and 110: structural Analysis for Compartment
- Page 111 and 112: Design of Plating for Surface Ships
- Page 113 and 114: Calculations to De
- Page 115 and 116: structural Analysis for Compartment
- Page 117 and 118: Design of Plating for Surface Ships
- Page 119 and 120: Calculations to De
- Page 121 and 122: Stress Calculations: Stiffening k =
- Page 123 and 124: Resulting Pressure on Shell Plating
- Page 125 and 126: Calculations to De
- Page 127 and 128: Stress Calculations for 227 I<stron
- Page 129 and 130: Resulting Pressure on Inner Longitu
- Page 131 and 132: Calculations to De
- Page 133 and 134: structural Analysis for Compartment
- Page 135 and 136: Design of Plating for Surface Ships
- Page 137 and 138: Stress Calculations k = coefficient
- Page 139 and 140: Resulting Pressure on Transverse Bu
- Page 141 and 142: Calculations to De
- Page 143 and 144: structural Analysis for Compartment
- Page 145 and 146: Design of Plating for Surface Ships
- Page 147 and 148: Stress Calculations: k = coefficien
- Page 149 and 150: __ — __ — """ " *c; 1— ai S s
- Page 151 and 152: o ON H 00 ^ ^ o > o -o B u H r^ 00
- Page 153 and 154: MATERIAL WORK SHEET PERMA BALLAST®
- Page 155: *• en * 5fc M S 00 00 * yj c« 1/
- Page 159: * CO * * vT 00 * in r4~ vT * cr C/l