08.02.2014 Views

Institute for Sanitary Engineering, Water Quality and Solid Waste ...

Institute for Sanitary Engineering, Water Quality and Solid Waste ...

Institute for Sanitary Engineering, Water Quality and Solid Waste ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Solid</strong> <strong>Waste</strong> Management SIA<br />

First results:<br />

The following figures show examples of results from<br />

CO 2<br />

-calculations related to different scenarios of green<br />

waste recovery. Two time frames are considered: 2<br />

years <strong>and</strong> 50 years. After 50 years the biomass used<br />

<strong>for</strong> the recovery is renewed (growing of plants). It is<br />

illustrated a positive balance <strong>for</strong> the energy recovery<br />

of raw green waste from spring. The energy recovery<br />

<strong>for</strong> conditioned green waste (screening) is much more<br />

efficient <strong>and</strong> has a similar dimension as the CO 2<br />

-balance<br />

<strong>for</strong> the substitution of german peat by substrates<br />

from green waste compost.<br />

Conclusion:<br />

Both scenarios <strong>for</strong> the recovery of green waste lead<br />

to a reduction of greenhouse gas emissions, although<br />

with varying efficiency. Significant savings result from<br />

energy recovery as well as from material recovery (similar<br />

dimension). There<strong>for</strong>e a similar or even equal<br />

political treatment – e.g. basing on saved greenhouse<br />

gases - is reasonable. The investigation project will<br />

also deliver a database <strong>and</strong> the parameters to provide<br />

a basis <strong>for</strong> future political decisions.<br />

Financing institution:<br />

Entsorgungsgemeinschaft der deutschen Entsorgungswirtschaft<br />

(EdDE e. V.), Köln<br />

Project partner:<br />

Arbeitsgemeinschaft Universität Stuttgart (Institut<br />

für Siedlungswasserbau, Wassergüte- u. Abfallwirtschaft<br />

– ISWA); Humus & Erden Kontor GmbH<br />

Project direction :<br />

Prof. Dr.-Ing. M. Kranert (ISWA),<br />

Dipl.-Ing. R. Gottschall (Humus & Erden Kontor<br />

GmbH)<br />

Duration:<br />

12/2007<br />

Contact:<br />

Dr. Dipl.-Ing. agr. C. Bruns<br />

Dipl.-Ing. R. Gottschall<br />

Dipl.-Ing. G. Hafner<br />

Prof. Dr.-Ing. M. Kranert<br />

Dipl.-Ing. O. Schiere<br />

Dipl.-Forsting., Dipl.-Ing. C. Seibel<br />

International Exports of Teaching Staff <strong>and</strong> Cooperation<br />

with Universities<br />

Cooperation with the Universidad Católica Boliviana<br />

« San Pablo », in La Paz, Bolivia<br />

In collaboration between the Department<br />

of Civil <strong>Engineering</strong> of<br />

the Universidad Católica Boliviana<br />

<strong>and</strong> the <strong>Institute</strong> of <strong>Sanitary</strong><br />

<strong>Engineering</strong>, <strong>Water</strong> <strong>Quality</strong> <strong>and</strong><br />

<strong>Waste</strong> Management of the University<br />

of Stuttgart, an exchange<br />

of know-how <strong>and</strong> in<strong>for</strong>mation is<br />

taking place in all the fields of<br />

environmental technology <strong>and</strong><br />

environmental analysis with a focus on waste management.<br />

This cooperation developed on the basis of the<br />

EU project <strong>Waste</strong>Net, which is going to be continued<br />

in other fields, including student exchange to carry out<br />

Bachelor <strong>and</strong> Master Thesis. In addition to this, block<br />

courses will be offered in La Paz <strong>for</strong> several degree<br />

courses in the fields of environmental engineering <strong>and</strong><br />

environmental analysis. An intensive know-how exchange<br />

is taking place with regards to biological waste<br />

treatment with emphasis on digestion plants. Other<br />

priorities include the recycling of waste tires, mining<br />

waste, hazardous household waste <strong>and</strong> the recovery<br />

<strong>and</strong> treatment of electrical <strong>and</strong> electronic wastes.<br />

L<strong>and</strong>fill with leachate ponds in La Paz<br />

Projekt partner:<br />

• Institut für Siedlungswasserbau, Wassergüteund<br />

Abfallwirtschaft - Lehrstuhl für Abfallwirtschaft<br />

und Abluft<br />

• Carrera de Ingeniería Civil de la Facultad de Ciencias<br />

Exactas e Ingeniería de la Universidad<br />

Católica Boliviana « San Pablo<br />

Contact:<br />

Dr.-Ing. Klaus Fischer<br />

M.Sc. Maria Alej<strong>and</strong>ra Espinoza<br />

91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!