23.02.2014 Views

Title Page

Title Page

Title Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12. NAME<br />

Elizabeth Fujikawa, PE<br />

15. FIRM NAME AND LOCATION (City and State)<br />

Carollo Engineers, Inc., Sunrise, FL<br />

16. EDUCATION (DEGREE AND SPECIALIZATION)<br />

MSE / Environmental Engineering<br />

BS / Chemistry<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

(Complete one Section E for each key person.)<br />

13. ROLE IN THIS CONTRACT<br />

Client Services Manager / WTP Design<br />

14. YEARS EXPERIENCE<br />

a. TOTAL b. WITH CURRENT FIRM<br />

25 2<br />

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND<br />

DISCIPLINE)<br />

FL / Professional Engineer IL / Professional Engineer<br />

WI / Professional Engineer<br />

LEED AP (US Green Building Council)<br />

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />

Ms. Fujikawa has more than 25 years of experience in WTP and pump station design and construction with capital construction costs of<br />

up to $240 million, including some of the largest softening plants in the U.S. Experience also includes filter upgrades, capacity reratings,<br />

process approvals, and regulatory compliance.<br />

19. RELEVANT PROJECTS<br />

(1) TITLE AND LOCATION (City and State)<br />

Study and Design Projects for 20 mgd Lime Softening Plant<br />

Quincy, IL<br />

(2) YEAR COMPLETED<br />

PROFESSIONAL SERVICES<br />

1987-2011 (numerous)<br />

CONSTRUCTION (If Applicable)<br />

1987-2011 (numerous)<br />

a.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />

Project manager for study and design projects for 20-mgd lime softening plant. Projects included design of chemical feed<br />

systems, clarifier improvements, filter pilot study and upgrades, correction of hydraulic bottlenecks in plant, regulatory compliance<br />

for SDWA and Surface Water Treatment Rule. Also, Infiltration/Inflow reduction study (modeling, identification of improvements.<br />

(1) TITLE AND LOCATION (City and State)<br />

Lake Michigan Water Supply Project<br />

Central Lake County Joint Action Water Agency (CLCJAWA), IL<br />

(2) YEAR COMPLETED<br />

PROFESSIONAL SERVICES<br />

1991-2011<br />

CONSTRUCTION (If Applicable)<br />

Multiple<br />

b.<br />

c.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />

Served in roles ranging from project engineer through project manager for 60-mgd water system (multiple projects over 20 years).<br />

Total construction value for all projects (original and subsequent upgrades) is approximately $200 million. Responsible for: raw<br />

water intake, pump station, transmission line; ozonation, rapid mix, flocculation, filtration (GAC) and chemical feed systems;<br />

booster pump station and standpipes.<br />

(1) TITLE AND LOCATION (City and State)<br />

Lime Softening Plant, Rend Lake Conservancy District<br />

Rend Lake, IL<br />

(2) YEAR COMPLETED<br />

PROFESSIONAL SERVICES<br />

2009-2011<br />

CONSTRUCTION (If Applicable)<br />

2009-2011<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />

Project manager for an upgrade of the plant to 27 mgd. The upgraded processes included conventional rapid mixing, upflow lime<br />

softening clarifiers, and a split train treatment with pressure membranes and conventional filtration.<br />

(1) TITLE AND LOCATION (City and State)<br />

Continuing Services Contract<br />

City of Pompano Beach, FL<br />

(2) YEAR COMPLETED<br />

PROFESSIONAL SERVICES<br />

2011-2012<br />

CONSTRUCTION (If Applicable)<br />

2012<br />

d.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost) AND SPECIFIC ROLE [X ] Check if project performed with current firm<br />

Client service manager for Continuing Services contracts. Projects include a Salt Backwashing Study for the Nanofiltration<br />

Membranes, an Electrical Master Plan, Owner’s Representative Services for City Wide Energy Upgrades, and<br />

Design/Construction Phase Management of Electrical Upgrades.<br />

(1) TITLE AND LOCATION (City and State)<br />

Master Plan for McCarron’s WTP<br />

St. Paul, MN<br />

(2) YEAR COMPLETED<br />

PROFESSIONAL SERVICES<br />

1993-1995<br />

CONSTRUCTION (If Applicable)<br />

e.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />

Project engineer for development of Master Plan for 144-mgd lime softening plant using Mississippi River source. Identified<br />

projects for capacity, redundancy, and water quality goals.<br />

D-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!