12. NAME<br />
Gary Meyerhofer<br />
15. FIRM NAME AND LOCATION (City and State)<br />
Carollo Engineers, Inc., Fountain Valley, CA<br />
16. EDUCATION (DEGREE AND SPECIALIZATION)<br />
BS / Civil Engineering<br />
MS / Environmental Engineering<br />
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
(Complete one Section E for each key person.)<br />
13. ROLE IN THIS CONTRACT<br />
Technical Review Committee<br />
a. TOTAL<br />
35<br />
14. YEARS EXPERIENCE<br />
b. WITH CURRENT FIRM<br />
9<br />
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />
CA / Civil Engineer<br />
MI / Professional Engineer<br />
WI / Professional Engineer<br />
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.).<br />
Mr. Meyerhofer, a senior vice president with Carollo, has over 35 years of experience in sanitary engineering with emphasis in the<br />
planning, design, and construction of water supply, treatment, and distribution facilities. He has also served as construction manager for<br />
several WTP projects. He currently serves as Carollo’s design-build director.<br />
(1) TITLE AND LOCATION (City and State)<br />
Chino Desalter Phase 3 Expansion<br />
Riverside, CA<br />
19. RELEVANT PROJECTS<br />
PROFESSIONAL SERVICES<br />
2007<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2011<br />
a.<br />
b.<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Program manager for the Chino Desalter Phase 3 expansion for the Western Municipal Water District and the Chino Basin<br />
Desalter Authority, CA. The Phase 3 Program includes the expansion of two groundwater desalters as well as the addition of a<br />
brine concentrate facility, six wells, four pump stations, and 50,000 feet of pipeline. The capital cost of these facilities is<br />
estimated to be $125 million.<br />
(1) TITLE AND LOCATION (City and State)<br />
(2) YEAR COMPLETED<br />
South Orange Coastal Ocean Desalination Pilot Plant Infrastructure PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />
Facilities<br />
2002<br />
2004<br />
Orange County, CA<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Principal-in-charge for the design of the South Orange Coastal Ocean Desalination Pilot Plant infrastructure facilities. Five<br />
agencies are sponsoring this project under the leadership of the Municipal Water District of Orange County, CA.<br />
(1) TITLE AND LOCATION (City and State)<br />
Mountain House WTP Design-Build<br />
Mountain House, CA<br />
PROFESSIONAL SERVICES<br />
2006<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2007<br />
c.<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Program manager for the design-build of the new 20-mgd, $45-million WTP for Mountain House Community Services District,<br />
CA. Responsible for defining the contract terms, conditions, cost, and schedule, in conjunction with our partner, Western<br />
Summit Constructors, Inc.<br />
(1) TITLE AND LOCATION (City and State)<br />
Olathe WTP Design-Build Expansion<br />
Olathe, KS<br />
PROFESSIONAL SERVICES<br />
2005<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2006<br />
d.<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Contract manager for a $20 million design-build membrane expansion for the City of Olathe, Kansas, WTP. In this role, he was<br />
responsible for defining the contract terms, conditions, cost, and schedule, in conjunction with our partner, Western Summit<br />
Constructors, Inc.<br />
(1) TITLE AND LOCATION (City and State)<br />
Water Works Park II WTP<br />
City of Detroit Water and Sewerage Department, MI<br />
PROFESSIONAL SERVICES<br />
2001<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2003<br />
e.<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm<br />
Project director for the new Water Works Park II WTP, a $275 million design-build project for the City of Detroit Water and<br />
Sewerage Department, Michigan<br />
STANDARD FORM 330 (1/2004) PAGE 2<br />
D-6