23.02.2014 Views

Title Page

Title Page

Title Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12. NAME<br />

Thomas Gillogly, PhD, PE<br />

15. FIRM NAME AND LOCATION (City and State)<br />

Carollo Engineers, Inc., Sunrise, FL<br />

16. EDUCATION (DEGREE AND SPECIALIZATION)<br />

BS / Chemical Engineering, Engineering and Public Policy<br />

MS / Civil Engineering<br />

PhD / Environmental Engineering<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

(Complete one Section E for each key person.)<br />

13. ROLE IN THIS CONTRACT<br />

Water Treatment Process Optimization a. TOTAL<br />

and Planning<br />

20<br />

14. YEARS EXPERIENCE<br />

b. WITH CURRENT FIRM<br />

8<br />

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />

FL / Professional Engineer<br />

NV / Civil Engineer<br />

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />

Dr. Gillogly is focused on managing and conducting projects addressing water quality and regulatory compliance issues. His<br />

expertise is built on a background of controlling DBPs, inorganic contaminants, taste-and-odor causing compounds, and synthetic<br />

organic compounds.<br />

a.<br />

19. RELEVANT PROJECTS<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

Preston-Hialeah WTPs (225-mgd) Improvements<br />

PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />

Miami-Dade County, FL<br />

On-going<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Deputy project manager for the Miami-Dade Preston-Hialeah WTPs Improvements. The project, designed to address potential<br />

regulatory issues and future water quality goals, has included an evaluation of process and treatment systems. Efforts are<br />

currently underway to design the world’s largest (165-mgd) nanofiltration (NF) facility and supporting facilities, including a<br />

LEED-Silver Administration area to meet the desired water quality goals and address operational issues.<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

City of Norman WTP (14-mgd) Improvements and (3-mgd) Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />

City of Norman, OK<br />

2009<br />

2010<br />

b.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Technical advisor on a project that focused on enhancing the efficiency of existing lime softening (General Filter solids contact<br />

clarifiers, rebuild filters) treatment processes, and providing a long-term solution (ozone) for taste and odor control and<br />

disinfection, while expending the plant capacity.<br />

(1) TITLE AND LOCATION (City and State)<br />

Springtree WTP Improvements – Groundwater Rule 4-Log Compliance<br />

City of Sunrise, FL<br />

PROFESSIONAL SERVICES<br />

2011<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

N/A<br />

c.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Technical advisor for the City of Sunrise, FL, Engineering Springtree and Southwest WTP Improvements Groundwater Rule 4-<br />

Log Compliance. This project evaluated water quality, identified plant improvements, and coordinated with local regulators to<br />

obtain 4-log virus inactivation credit compliance for the two WTPs.<br />

(1) TITLE AND LOCATION (City and State)<br />

Arrowhead Well No.3 Arsenic Treatment Study and Design - South<br />

Tahoe Public Utility District, CA<br />

PROFESSIONAL SERVICES<br />

2009<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2009<br />

d.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager to evaluate multiple arsenic treatment technologies through desk-top and pilot-scale testing. Developed prepurchase<br />

documents, competitively securing a 1,000-gpm Severn Trent E-33 adsorptive media system. Design and<br />

construction phases services were provided for the facility that started in 2009.<br />

(1) TITLE AND LOCATION (City and State)<br />

Palm Beach County Blending and Organoloptic Evaluation<br />

City of West Palm Beach, FL<br />

PROFESSIONAL SERVICES<br />

2011<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

N/A<br />

e.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager for the Palm Beach County Water Utilities, Department (and the City of West Palm Beach) Blending and<br />

Organoleptic Evaluation. This evaluated potential water quality impacts to distribution system quality during interagency<br />

purchase and blending of finished water in the distribution system.<br />

STANDARD FORM 330 (1/2004) PAGE 2<br />

D-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!