23.02.2014 Views

Title Page

Title Page

Title Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified.<br />

Complete one Section F for each project.)<br />

21. TITLE AND LOCATION (City and State)<br />

Utility/Architectural Engineering Services (RFP<br />

064395TC) & – Engineering Services for Utility Engineer<br />

of Record (RFP 11-1569BG)<br />

Manatee County, FL<br />

PROFESSIONAL SERVICES<br />

Ongoing (2007-2014)<br />

Specific dates included with<br />

projects below.<br />

23. PROJECT OWNER’S INFORMATION<br />

22. YEAR COMPLETED<br />

20. EXAMPLE PROJECT KEY<br />

NUMBER<br />

8<br />

CONSTRUCTION (if Applicable)<br />

Indicated below, if applicable.<br />

a. PROJECT OWNER<br />

Manatee County, FL<br />

b. POINT OF CONTACT NAME<br />

Mr. Jeff Streitmatter III, P.E.<br />

c. POINT OF CONTACT TELEPHONE NUMBER<br />

941-708-7450 Ext. 7335<br />

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)<br />

Carollo is providing continuing engineering services for Manatee County. Treatment and Permitting Projects include:<br />

Manatee County Biological Treatment Cost Modeling For Surface Water Taste & Odor Removal. Carollo is conducting an<br />

evaluation to consider the use of biological filtration (biofiltration) as an alternative to PAC. Project completion: 2012 (June).<br />

Cost: $34,284.<br />

Manatee County CIP Projects Review. Carollo will provide peer review of work performed by the County's other<br />

consultants at the County’s facilities. Completion Date: 2012 (December). Cost: $55,000.<br />

Compliance Review Assistance. Carollo provides for regulatory review and assistance to the County, on an as-needed<br />

basis. Completion Date: 2012 (December). Cost: $130,000.<br />

Lake Manatee WTP Ultrafiltration System Basis of Design Report Peer Review. Carollo provided a peer review of the<br />

draft BODR, which evaluates the technical consistencies, cost estimates, and facility layouts. Completion Date: 2010.<br />

Cost: $57,824.<br />

Manatee County Reuse Permit Renewal. This project consists of the preparation of permit application, including<br />

required supporting documents; installation of new ground water (GW) monitoring wells; abandonment of obsolete<br />

monitoring wells; implementation of new GW monitoring plan; and modifications to existing WRF permits to remove<br />

individual GW monitoring plans. Project completion: 2013. Cost: $248,658.<br />

RO WTP Basis of Design Report Peer Review. Carollo conducted a peer review of the County’s Erie Road RO WTP<br />

Basis of Design Report (BDR) dated February 2008. Completion Date: 2008. Cost: $26,616.<br />

Force main and Water Distribution Projects include:<br />

Force Main Replacement Preliminary Design Report – Manatee County, FL. Carollo analyzed four alternatives to<br />

rehabilitate or replace the existing cast iron force main that is near failure due to corrosion on the interior of the pipe as<br />

well as graphitization on the exterior of the pipe. The alternatives included utilizing conventional methods of pipe<br />

replacement as well as new, innovative techniques in pipe rehabilitation. Completion Date: 2007 (Design). Cost: $40,000.<br />

Utility Engineering Services for PS 428 Booster Pump Station. Based on County’s models, Carollo designed a<br />

wastewater pump station to reduce force main pressures and improve flow to water reclamation facility. The design<br />

minimized site footprint in residential area by using a design that put multiple pumps in-line with the force main,<br />

eliminating the need for a wet well. Completion Dates: 2009 (Design), 2012 (Constr.). Cost: $210,429.<br />

Oneco Terrace Waterline Replacement, Phases I, II and III. Carollo replaced approximately 14,800 lineal feet of<br />

existing 2, 4, and 6-inch water main. Scope also included determining the routing of the new water mains and developing<br />

a construction sequence to maintain service to existing residences. Carollo acquired applicable permits, and provided<br />

construction services. Completion Dates: 2009 (Design), 2012 (Constr.). Cost: $195,289.<br />

Pic Town Waterline Replacement, Phases I and II. Project included the design and replacement of approximately<br />

11,000 linear feet of waterline. Existing 2-, 4-, and 6-inch galvanized, ductile iron, PVC, and asbestos concrete waterlines<br />

were replaced with approximately 7,900 linear feet of 6-inch waterline and 3,265 linear feet of 8-inch waterline.<br />

Completion Dates: 2009 (Design), 2012 (Constr. - July). Cost: $145,783.<br />

Bayshore on the Lakes - Waterline Replacement. Existing 3-, 4- and 6-inch galvanized and PVC waterlines will be<br />

replaced with approximately 2,400 linear feet 6-inch and 8,000 linear feet 8-inch ductile iron, HDPE, and PVC water lines.<br />

Carollo used hydraulic modeling to confirm fire flow requirements and determine the final sizing of all water lines.<br />

Completion Dates: 2009 (Design), 2012 (Constr. - November). Cost: $78,980.<br />

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT<br />

a.<br />

b.<br />

(1) FIRM NAME<br />

Carollo Engineers, Inc.<br />

(1) FIRM NAME<br />

Carollo Engineers, Inc.<br />

(2) FIRM LOCATION (City and State)<br />

Sarasota, FL<br />

(2) FIRM LOCATION (City and State)<br />

Winter Park, FL<br />

(3) ROLE<br />

Prime<br />

(3) ROLE<br />

Support<br />

D-29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!