12. NAME<br />

Eric Peters, PE<br />

15. FIRM NAME AND LOCATION (City and State)<br />

Carollo Engineers, Inc., Sarasota, FL<br />

16. EDUCATION (DEGREE AND SPECIALIZATION)<br />

BS / Civil Engineering<br />

MS / Environmental Engineering<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

(Complete one Section E for each key person.)<br />

13. ROLE IN THIS CONTRACT<br />

Water Distribution and Transmission/<br />

WW Management, Collection, and<br />

Pumping<br />

a. TOTAL<br />

19<br />

14. YEARS EXPERIENCE<br />

b. WITH CURRENT FIRM<br />

12<br />

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />

FL / Professional Engineer<br />

CO / Professional Engineer<br />

KS / Professional Engineer<br />

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />

Mr. Peters has 18 years of experience in the water and wastewater treatment field. He has been involved with the study, design,<br />

field engineering, and O&M evaluation of water and wastewater systems for municipal clients. He is a member of the AWWA and<br />

the Water Environment Federation.<br />

a.<br />

19. RELEVANT PROJECTS<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

City of St. Petersburg Albert Whitted WRF Clarifiers Rehabilitation<br />

PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />

St. Petersburg, FL<br />

2009<br />

2009<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager for the City of St. Petersburg Clarifier Rehabilitation at the Albert Whitted Water Reclamation Facility. This<br />

project includes an inspection of the four existing secondary clarifiers; developing options for rehabilitation or replacement of<br />

the clarifiers; and development of a preliminary design report. Final design was completed for the chosen alternative.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

Pinellas Park & Joe's Creek Interceptors Odor/Corrosion Study<br />

PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />

Pinellas County, FL<br />

2008<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager for the Pinellas Park and Joe's Creek Interceptor Odor and Corrosion Study. Project included evaluations of<br />

odor emissions and corrosion on two large diameter interceptors and influent pump station. Project tasks included inspections<br />

of existing conditions, sample collection and analysis, and an evaluation of liquid and the chemical treatment technologies.<br />

Inspections were completed on over 150 manholes with continuous H 2 S monitoring at several locations along the interceptors.<br />

(1) TITLE AND LOCATION (City and State)<br />

Sarasota County Central County Water Reclamation Facility Expansion,<br />

Sarasota County, FL<br />

PROFESSIONAL SERVICES<br />

2009<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

On-going<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager for the Sarasota County Central County WRF expansion which involves conversion of the treatment process<br />

to the MLE process with diffused aeration, compartmentalizing the existing oxidation ditches to anoxic and aerated zones, and<br />

the addition of additional MLE bioreactor modules and clarifiers.<br />

(1) TITLE AND LOCATION (City and State)<br />

City of St. Petersburg Lift Station SCADA Evaluation<br />

St. Petersburg, FL<br />

PROFESSIONAL SERVICES<br />

2007<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

N/A<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project manager. Carollo provided evaluation, design, engineering, and construction services for installation and commissioning<br />

of a multiple lift stations for the City of St. Petersburg, FL. The project consists of replacement of radio telemetry for about 80<br />

remote sewage lift stations. The scope included selection of new radio equipment, verifying FCC licensing, installing auxiliary<br />

equipment to interconnect with the existing RTUs, replacing of antennas on an as-needed basis, and software programming of<br />

radios and related RTU equipment. This contract uses an alternative procurement procedure whereby Carollo will be<br />

responsible for design and additional engineering and construction services, including installation and commissioning of the<br />

system.<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

Miami-Dade South District WWTP Level Disinfection Design<br />

PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />

Miami-Dade County, FL<br />

2006<br />

N/A<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Project engineer for the Miami-Dade South District WWTP High-Level Disinfection Design. This project consists of<br />

implementing high level disinfection for 225 mgd prior to deep well effluent disposal. Evaluation includes a low lift pump station<br />

and comparing chlorine, chlorine dioxide, and UV disinfection alternatives. Before implementing high level disinfection, O&M<br />

problems related to fats, oil, and grease need to be reduced. Responsible for the preliminary and final design components to<br />

remove FOG.<br />