23.02.2014 Views

Title Page

Title Page

Title Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12. NAME<br />

Anthony Morroni, PE<br />

15. FIRM NAME AND LOCATION (City and State)<br />

Carollo Engineers, Inc., Littleton, CO<br />

16. EDUCATION (DEGREE AND SPECIALIZATION)<br />

BS / Engineering Physics<br />

BS / Engineering Mathematics<br />

MS / Physics<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

(Complete one Section E for each key person.)<br />

13. ROLE IN THIS CONTRACT<br />

Electrical/I&C<br />

a. TOTAL<br />

41<br />

14. YEARS EXPERIENCE<br />

b. WITH CURRENT FIRM<br />

10<br />

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />

CO / Professional Engineer: FL; CO; HI; NC; GA; AL; SC;<br />

UT; WI; WV; KS; ME; MT; WA; WY; NM; CA; ID; MN; KY;<br />

SD<br />

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />

A senior vice president with Carollo Engineers, has an extensive background in both the electrical and instrumentation engineering<br />

fields. He is a member of the AWWA; Institute of Electrical and Electronic Engineers; Instrument Society of America; International<br />

Association of Electrical Inspector; National Society of Professional Engineers.<br />

(1) TITLE AND LOCATION (City and State)<br />

New Ave Maria Water Treatment Facility<br />

City of Naples, FL<br />

19. RELEVANT PROJECTS<br />

PROFESSIONAL SERVICES<br />

2003<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2003<br />

a.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Electrical and I&C engineer for a preliminary design report for the new Ave Maria Water Treatment Facility for the Barron Collier<br />

Company, Collier County, FL.<br />

(1) TITLE AND LOCATION (City and State)<br />

Pinewoods WTP Nanofiltration rehabilitation and RO Expansion<br />

City of Fort Myers, FL<br />

PROFESSIONAL SERVICES<br />

2005<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2008<br />

b.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Electrical and instrumentation lead engineer for the Pinewoods WTP RO Expansion Design for Lee County Utilities, Fort<br />

Myers, FL.<br />

(1) TITLE AND LOCATION (City and State)<br />

Central County Water Reclamation Facility Expansion<br />

Sarasota, FL<br />

PROFESSIONAL SERVICES<br />

2007<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2008<br />

c.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Electrical and I&C engineer for the preliminary design report for the 1.4-mgd expansion of the Central County Water<br />

Reclamation Facility in Sarasota County, FL.<br />

(1) TITLE AND LOCATION (City and State)<br />

Draper WTP Infrastructure Assessment and Capacity Expansion<br />

City of Oklahoma City, OK<br />

PROFESSIONAL SERVICES<br />

2004<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2006<br />

d.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Electrical and instrumentation design for a new raw water inlet facility, a chemical feed facility, three rapid mix trains, six<br />

flocculation and sedimentation basins, and a disinfection facility for the Lake Stanley Draper WTP for Oklahoma City, OK.<br />

(1) TITLE AND LOCATION (City and State)<br />

South Island Public Service District RO WTP Expansion<br />

City of Hilton Head, SC<br />

PROFESSIONAL SERVICES<br />

2003<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2004<br />

e.<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Electrical engineer for a project expanding the brackish groundwater treatment plant from 1.5 mgd to 3 mgd for the South Island<br />

Public Service District, Hilton Head, SC. This project included new RO membrane equipment for geothermal well water.<br />

STANDARD FORM 330 (1/2004) PAGE 2<br />

D-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!