Title Page
Title Page
Title Page
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
12. NAME<br />
Robert Cushing, PhD, PE, BCEE<br />
15. FIRM NAME AND LOCATION (City and State)<br />
Carollo Engineers, Inc., Sarasota, FL<br />
16. EDUCATION (DEGREE AND SPECIALIZATION)<br />
BS / Petroleum Engineering<br />
MS / Civil Engineering<br />
PhD / Civil Engineering<br />
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
(Complete one Section E for each key person.)<br />
13. ROLE IN THIS CONTRACT<br />
Technical Review Committee<br />
a. TOTAL<br />
22<br />
14. YEARS EXPERIENCE<br />
b. WITH CURRENT FIRM<br />
14<br />
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />
FL / Professional Engineer NC / Professional Engineer<br />
SC / Professional Engineer VA / Professional Engineer<br />
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />
Dr. Cushing has coupled fundamental concepts with sound engineering practices to provide creative, innovative, and enduring<br />
solutions to challenges faced by water and wastewater utilities. He has been responsible for numerous successful treatment facility<br />
planning and design projects, as well as studies and programs for improving distribution system water quality. Dr. Cushing has<br />
authored over 100 published/presentations on a broad range of water and wastewater topics.<br />
a.<br />
b.<br />
c.<br />
d.<br />
e.<br />
19. RELEVANT PROJECTS<br />
(1) TITLE AND LOCATION (City and State)<br />
(2) YEAR COMPLETED<br />
North Lee County Reverse Osmosis (RO) WTP Expansion from 4.9 to PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)<br />
11.6 mgd<br />
2010<br />
2011<br />
Lee County Utilities, FL<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
As principal-in-charge, he oversaw the design phase of the design-build delivery of the improvements and expansion, which<br />
included major upgrades to the treatment plants electrical systems, increasing RO feed pump sizes from 75 to 200 HP, and the<br />
addition of a turbine assisted booster pump as an interstage booster pump device. The cost of the required improvements to<br />
meet the nameplate capacity for this facility are $17 million.<br />
(1) TITLE AND LOCATION (City and State)<br />
Central County Water Reclamation Facility Expansion<br />
Sarasota County, FL<br />
PROFESSIONAL SERVICES<br />
2009<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
On-going<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Principal-in-charge for the Central County Water Reclamation Facility Expansion, which included a preliminary design study,<br />
final design, and construction phase services for a 2-phase expansion from 4.0 mgd to 8.0 mgd.<br />
(1) TITLE AND LOCATION (City and State)<br />
Pinellas County Odor and Corrosion Study<br />
Pinellas County, FL<br />
PROFESSIONAL SERVICES<br />
2008<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
N/A<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Principal-in-charge for the Pinellas County Odor and Corrosion Study. This project consisted of identification and<br />
documentation of concentrations of odors and corrosive substances, in vapor and liquid phases, in the wastewater collection<br />
system. The degree of damage to the infrastructure was observed and documented at various locations in the collection<br />
system. Chemical additives and other odor/corrosion countermeasures were listed and evaluated for application in the included<br />
collection system. Recommendations were provided for monitoring, counteracting, and eliminating odor release and corrosive<br />
damage to the wastewater collection system.<br />
(1) TITLE AND LOCATION (City and State)<br />
Water and Wastewater Master Plans<br />
Punta Gorda, FL<br />
PROFESSIONAL SERVICES<br />
2008<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
N/A<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Principal-in-charge for the Water and Wastewater Master Plans for the City of Punta Gorda (City), which included hydraulic<br />
water and wastewater modeling and development of capital improvements programs (CIPs) for the City. The primary goals of<br />
the project were to provide hydraulic modeling analyses to identify bottlenecks and system deficiencies and recommend<br />
improvements to correct these problems, as well as to determine future infrastructure requirements to existing areas with no<br />
utility service and to serve new developments.<br />
(1) TITLE AND LOCATION (City and State)<br />
Sarasota County 2011 Water Supply Master Plan Update<br />
Sarasota, FL<br />
PROFESSIONAL SERVICES<br />
2011<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
N/A<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Principal-in-charge . Carollo reviewed, updated, and expanded Sarasota County’s previous water supply master plan to provide<br />
a basis for the continuation of sustainable water supply development throughout the County. The project updated water<br />
demand projections, reviewed the inventory of water assets, and identified potential future supplies. A scenario-based<br />
alternatives development approach was used to produce a plan that provided flexibility in light of future uncertainties. Provided<br />
support and background to complete hydraulic modeling scenario analyses, which will be incorporated into the County's<br />
WSMP. Based on the inventory of existing assets and potential future projects, Carollo developed a 10-year CIP to best satisfy<br />
the County’s future water supply needs.<br />
STANDARD FORM 330 (1/2004) PAGE 2<br />
D-4