30.04.2014 Views

Minutes of the Annual Meeting of the Power - New York Power ...

Minutes of the Annual Meeting of the Power - New York Power ...

Minutes of the Annual Meeting of the Power - New York Power ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rate Year 1<br />

Demand Rate<br />

$/kW-month<br />

Energy Rate<br />

$/MW-hour<br />

Effective Rate 2<br />

$/MW-hour % Increase<br />

2007 2.73 4.92 10.26 7.1<br />

2008 3.03 4.92 10.85 5.8<br />

Rate Stabilization Reserve (RSR)<br />

The RSR, established in 1987, was designed to capture <strong>the</strong> over- or under-recovery <strong>of</strong> costs<br />

relative to <strong>the</strong> costs collected in <strong>the</strong> fixed demand and energy charges, due to differences in net<br />

generation and actual cost incurrence. By design, if <strong>the</strong> RSR balance exceeds a range <strong>of</strong> +$25<br />

million to -$25 million a surcharge or credit will be assessed against <strong>the</strong> R&D hydro rate. At<br />

calendar year end 2005, <strong>the</strong> last actual calculation, <strong>the</strong> RSR balance was -$17.9 million. The<br />

update for calendar 2006 is scheduled to be completed by <strong>the</strong> end <strong>of</strong> <strong>the</strong> first quarter <strong>of</strong> 2007.<br />

Final Staff Report<br />

A final report will be issued shortly after <strong>the</strong> April 2007 Trustee meeting. The final report will<br />

reflect public comments and staff analysis, as well as Trustee action, on <strong>the</strong> proposed rate plan.<br />

1<br />

2<br />

Runs from May 1 <strong>of</strong> <strong>the</strong> calendar year indicated to April 30 <strong>of</strong> <strong>the</strong> following year.<br />

Effective rate at 70% load factor.<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!