April 24, 2007<br />

13. Richard M. Flynn <strong>Power</strong> Plant – Major Outage and Life<br />

Extension Modifications – Capital Expenditure Authorization<br />

SUMMARY<br />

The President and Chief Executive Officer submitted <strong>the</strong> following report:<br />

“The Trustees are requested to authorize capital expenditures <strong>of</strong> $8.642 million to extend <strong>the</strong> useful life <strong>of</strong><br />

<strong>the</strong> Richard M. Flynn <strong>Power</strong> Plant’s (‘Flynn’) gas turbine and o<strong>the</strong>r plant components for ano<strong>the</strong>r 100,000 operating<br />

hours.<br />

BACKGROUND<br />

“Flynn, a gas-turbine-powered combined cycle plant in Holtsville, was put into service in May 1994. The<br />

gas turbine was purchased with an expected service life <strong>of</strong> 100,000 Equivalent Operating Hours (‘EOH’). EOH take<br />

into account <strong>the</strong> number <strong>of</strong> starts, unexpected trips and severe events and types <strong>of</strong> fuel used. The Flynn gas turbine<br />

crossed <strong>the</strong> 100,000 EOH threshold in January, 2005. It currently has about 120,000 EOH and is scheduled for its<br />

next major overhaul (outage) in October, 2007, when components <strong>of</strong> <strong>the</strong> gas turbine, steam turbine and <strong>the</strong> balance<br />

<strong>of</strong> <strong>the</strong> plant will be replaced. The last major overhaul was completed in October/November, 2003. Flynn is baseloaded<br />

and rarely shuts down. A four-year cycle accumulates approximately 33,000 EOH.<br />

“Some tasks covered by this Capital Expenditure Authorization Request will be scheduled for April and<br />

May 2007 due to premature failure <strong>of</strong> <strong>the</strong> gas turbine generator rotor.<br />

“These improvements will prepare Flynn for ano<strong>the</strong>r 100,000 hours <strong>of</strong> service, which coincides with <strong>the</strong><br />

projected end (2020) <strong>of</strong> <strong>the</strong> current Capacity Supply Agreement between <strong>the</strong> Authority and <strong>the</strong> Long Island <strong>Power</strong><br />

Authority.<br />

DISCUSSION<br />

“Various components <strong>of</strong> Flynn’s Siemens V84.2 gas turbine, including diffusion gas and fuel oil burners,<br />

dome bolts, turbine blades and vanes, compensators, dome plates, fuel oil and fuel gas lines, are at or near <strong>the</strong> end <strong>of</strong><br />

<strong>the</strong>ir useful life, which puts <strong>the</strong> safety and reliability <strong>of</strong> <strong>the</strong> gas turbine at risk. In addition, mixing elbows will be<br />

upgraded to improve reliability.<br />

“The steam turbine generator developed a stator ground fault in February, 2005; <strong>the</strong> generator was repaired<br />

and returned to service 18 days later. During <strong>the</strong> repair, it became obvious that <strong>the</strong> general condition <strong>of</strong> <strong>the</strong> stator<br />

bars was very poor, compromising reliable operation <strong>of</strong> <strong>the</strong> unit. Stator bars <strong>of</strong> superior design were procured and<br />

<strong>the</strong> installation (rewind) was planned for <strong>the</strong> 2007 major outage. Contingency plans were developed in case <strong>the</strong> unit<br />

faulted again before October, 2007.<br />

“All gas turbines use some system <strong>of</strong> washing compressor blades when <strong>the</strong> unit is running and also when it<br />

is turned <strong>of</strong>f. When <strong>the</strong> compressor blades are dirty, <strong>the</strong>y cause <strong>the</strong> gas turbine to lose efficiency. The original<br />

water wash system on <strong>the</strong> Siemens gas turbine will be replaced with new technology that will provide superior<br />

washes and less blade-coating damage.<br />

“Modern technology will also be used to replace <strong>the</strong> steam turbine governor controls, excitation controls<br />

and balance <strong>of</strong> plant controls, which are original equipment and have become unreliable in terms <strong>of</strong> performance,<br />

service and available parts.<br />

“The station batteries, which are near <strong>the</strong> end <strong>of</strong> <strong>the</strong>ir useful life, will also be replaced.<br />

FISCAL INFORMATION<br />

“Payments for costs associated with <strong>the</strong> major outage and life extension for <strong>the</strong> Flynn plant will be made<br />

from <strong>the</strong> Capital Fund.<br />

39