2006 ANNUAL REPORT OF PROCUREMENT CONTRACTS<br />

EXPLANATIONS<br />

ARRANGEMENT: by generating SITE abbreviation WPO, B-G, CEC, NIA, POLETTI-FLYNN-500MW, STL, Fossil<br />

Fuels, Corporate Finance, <strong>the</strong>n in ascending order by CONTRACT NUMBER within site.<br />

SCOPE: all procurement contracts (for goods or services) with a value <strong>of</strong> $5,000 or greater that were open, completed or<br />

awarded in 2006, including contracts awarded in 1990 through 2006 that were ei<strong>the</strong>r completed in 2006 or extended into 2007<br />

or beyond.<br />

FIELD NAMES<br />

TYPE: COMMITMENT TYPE, code from attached table indicating <strong>the</strong> major category <strong>of</strong> goods or kind <strong>of</strong> services provided.<br />

{C,E,P,S}<br />

MOA: METHOD OF AWARD, code from attached table indicating <strong>the</strong> basis <strong>of</strong> vendor selection. {B,C,S}<br />

RNA: REASON NOT ADVERTISED, code from attached table indicating <strong>the</strong> reason a notice was not published in <strong>the</strong><br />

Contract Reporter. {0-9}<br />

OPA: OMNIBUS PROCUREMENT ACT, code from attached table indicating where <strong>the</strong> goods were substantially<br />

manufactured or assembled or where <strong>the</strong> services were substantially performed, <strong>New</strong> <strong>York</strong> or Foreign to <strong>New</strong> <strong>York</strong>. (N,F)<br />

MWBE: MINORITY WOMEN OWNED ENTERPRISE, code from attached table indicating status <strong>of</strong> <strong>New</strong> <strong>York</strong> State<br />

Certified Minority / Women Owned Enterprise. (Y,N)<br />

BIDS: NUMBER OF BIDS, code from attached table indicating <strong>the</strong> number <strong>of</strong> bids submitted.<br />

TOTAL CONTRACT AMOUNT: total value <strong>of</strong> <strong>the</strong> commitment as <strong>of</strong> December 31, 2006, reported from <strong>the</strong> SAP system.<br />

NOTE: Additional funding may be authorized via issuance <strong>of</strong> a Change Order in accordance with <strong>the</strong> Authority’s Expenditure<br />

Authorization Procedures.<br />

TOTAL AMOUNT EXPENDED TO DATE: total amount expended through December 31, 2006 as reported from SAP<br />

system.<br />

AMOUNT EXPENDED IN 2006: amount expended between January 1, 2006 through December 31, 2006, as reported by<br />

SAP system.<br />

DATE OF CONTRACT: date on which <strong>the</strong> original commitment was effective (which may differ from Issue Date <strong>of</strong> formal<br />

contract or “Create Date” in SAP system).<br />

O/C: (Open/Completed), indicates <strong>the</strong> status <strong>of</strong> <strong>the</strong> contract as <strong>of</strong> December 31, 2006. Completion indicates that goods have<br />

been received or services completed in full; this<br />

THIS DOES NOT NECESSARILY reflect that <strong>the</strong> final payment has been made.<br />

PROJECTED COMPLETION DATE: for open commitments, <strong>the</strong> date on which <strong>the</strong> scope <strong>of</strong> <strong>the</strong> contract is scheduled to be<br />

physically completed; this DOES NOT NECESSARILY reflect that <strong>the</strong> final payment has been made.<br />

DATE CONTRACT COMPLETED: for completed commitments, <strong>the</strong> date <strong>of</strong> actual physical completion, when goods were<br />

delivered or services completed in full; this DOES NOT NECESSARILY reflect that <strong>the</strong> final payment has been made.