06.05.2014 Views

Accommodating High Levels of Variable Generation - NERC

Accommodating High Levels of Variable Generation - NERC

Accommodating High Levels of Variable Generation - NERC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

References<br />

[66] GE Energy, Intermittency Analysis Project Final Report, Appendix B -Impact <strong>of</strong><br />

Intermittent <strong>Generation</strong> on Operation <strong>of</strong> California Power Grid, for California<br />

Energy Commission Public Interest Energy Research Program, July, 2007.<br />

[67] Zavadil et al, Minnesota Wind Integration Study Final Report - Volume I, prepared<br />

for the Minnesota Public Utilities Commission, November 2006.<br />

[68] GE Energy, Analysis <strong>of</strong> Wind <strong>Generation</strong> Impact on ERCOT Ancillary Services<br />

Requirements, final report prepared for ERCOT, March 2008.<br />

[69] Ulrich Focken, Wind Power Forecast Experience in Germany, presented at UWIG<br />

Wind Forecasting Workshop, St Paul, MN, February 2008.<br />

[70] Facilitating Wind Development: The Importance <strong>of</strong> Electric Industry Structure<br />

[71] B. Kirby and M. Milligan. NREL Technical Report NREL/TP-500-43251, May<br />

2008. Available at http://www.nrel.gov/docs/fy08osti/43251.pdf<br />

[72] Cardinal, M., and N. Miller. 2006. “Grid Friendly Wind Plant Controls:<br />

WindCONTROL – Field Test Results.” Presented at WindPower 2006, June 4–7,<br />

Pittsburgh, PA.<br />

[73] Deutsche Energie-Agentur GmbH (dena). 2005. Energy Management Planning for<br />

the Integration <strong>of</strong> Wind Energy into the Grid in Germany, Onshore and Offshore by<br />

2020. Cologne, Germany: Deutsche Energie-Agentur GmbH.<br />

http://www.uwig.org/Dena-2005_English.pdf<br />

[74] Eriksen, P., A. Orths, and V. Akhmatov. 2006. “Integrating Dispersed <strong>Generation</strong><br />

into the Danish Power System – Present Situation and Future Prospects.” Presented<br />

at the IEEE Power Engineering Society (PES) Meeting, June 20, Montreal.<br />

[75] Erlich, I., W. Winter, and A. Dittrich. 2006. “Advanced Grid Requirements for the<br />

Integration <strong>of</strong> Wind Turbines into the German Transmission System,”<br />

http://www.uni-duisburg.de/FB9/EAUN/downloads/papers/paper_030706-02.pdf<br />

Montreal: IEEE, Panel paper No. 060428.<br />

[76] Gross, R., P. Heptonstall, D. Anderson, T. Green, M. Leach, and J. Skea. 2006.<br />

The Costs and Impacts <strong>of</strong> Intermittency: An Assessment <strong>of</strong> the Evidence on the<br />

Costs and Impacts <strong>of</strong> Intermittent <strong>Generation</strong> on the British Electricity Network.<br />

ISBN 1-90314-404-3. London, UK: Energy Research Centre.<br />

http://www.ukerc.ac.uk/ImportedResources/PDF/06/0604_Intermittency_report_fin<br />

al.pdf<br />

<strong>Accommodating</strong> <strong>High</strong> <strong>Levels</strong> <strong>of</strong> <strong>Variable</strong> <strong>Generation</strong> 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!