Accommodating High Levels of Variable Generation - NERC
Accommodating High Levels of Variable Generation - NERC
Accommodating High Levels of Variable Generation - NERC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
References<br />
[66] GE Energy, Intermittency Analysis Project Final Report, Appendix B -Impact <strong>of</strong><br />
Intermittent <strong>Generation</strong> on Operation <strong>of</strong> California Power Grid, for California<br />
Energy Commission Public Interest Energy Research Program, July, 2007.<br />
[67] Zavadil et al, Minnesota Wind Integration Study Final Report - Volume I, prepared<br />
for the Minnesota Public Utilities Commission, November 2006.<br />
[68] GE Energy, Analysis <strong>of</strong> Wind <strong>Generation</strong> Impact on ERCOT Ancillary Services<br />
Requirements, final report prepared for ERCOT, March 2008.<br />
[69] Ulrich Focken, Wind Power Forecast Experience in Germany, presented at UWIG<br />
Wind Forecasting Workshop, St Paul, MN, February 2008.<br />
[70] Facilitating Wind Development: The Importance <strong>of</strong> Electric Industry Structure<br />
[71] B. Kirby and M. Milligan. NREL Technical Report NREL/TP-500-43251, May<br />
2008. Available at http://www.nrel.gov/docs/fy08osti/43251.pdf<br />
[72] Cardinal, M., and N. Miller. 2006. “Grid Friendly Wind Plant Controls:<br />
WindCONTROL – Field Test Results.” Presented at WindPower 2006, June 4–7,<br />
Pittsburgh, PA.<br />
[73] Deutsche Energie-Agentur GmbH (dena). 2005. Energy Management Planning for<br />
the Integration <strong>of</strong> Wind Energy into the Grid in Germany, Onshore and Offshore by<br />
2020. Cologne, Germany: Deutsche Energie-Agentur GmbH.<br />
http://www.uwig.org/Dena-2005_English.pdf<br />
[74] Eriksen, P., A. Orths, and V. Akhmatov. 2006. “Integrating Dispersed <strong>Generation</strong><br />
into the Danish Power System – Present Situation and Future Prospects.” Presented<br />
at the IEEE Power Engineering Society (PES) Meeting, June 20, Montreal.<br />
[75] Erlich, I., W. Winter, and A. Dittrich. 2006. “Advanced Grid Requirements for the<br />
Integration <strong>of</strong> Wind Turbines into the German Transmission System,”<br />
http://www.uni-duisburg.de/FB9/EAUN/downloads/papers/paper_030706-02.pdf<br />
Montreal: IEEE, Panel paper No. 060428.<br />
[76] Gross, R., P. Heptonstall, D. Anderson, T. Green, M. Leach, and J. Skea. 2006.<br />
The Costs and Impacts <strong>of</strong> Intermittency: An Assessment <strong>of</strong> the Evidence on the<br />
Costs and Impacts <strong>of</strong> Intermittent <strong>Generation</strong> on the British Electricity Network.<br />
ISBN 1-90314-404-3. London, UK: Energy Research Centre.<br />
http://www.ukerc.ac.uk/ImportedResources/PDF/06/0604_Intermittency_report_fin<br />
al.pdf<br />
<strong>Accommodating</strong> <strong>High</strong> <strong>Levels</strong> <strong>of</strong> <strong>Variable</strong> <strong>Generation</strong> 91