plc timers - 9.5<br />

I/0<br />

O/0<br />

I/0<br />

O/1<br />

L<br />

I/1<br />

O/1<br />

U<br />

I/0<br />

O/2<br />

I/1<br />

O/2<br />

I/0<br />

I/1<br />

O/0<br />

O/1<br />

O/2<br />

Figure 9.5<br />

A Latch Example<br />

A normal output should only appear once in ladder logic, but latch <strong>and</strong> unlatch<br />

instructions may appear multiple times. In Figure 9.5 a normal output O/2 is repeated<br />

twice. When the program runs it will examine the fourth line <strong>and</strong> change the value of O/2<br />

in memory (remember the output scan does not occur until the ladder scan is done.) The<br />

last line is then interpreted <strong>and</strong> it overwrites the value of O/2. Basically, only the last line<br />

will change O/2.<br />

Latches are not used universally by all PLC vendors, others such as Siemens use