12.05.2014 Views

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exhibit 6-17<br />

DEFICIENCIES BY SEGMENT<br />

(Continued)<br />

From<br />

MP<br />

To<br />

MP SR <strong>77</strong> Segment Deficiencies<br />

69.8 69.5 Fort Lowell Road to<br />

Miracle Mile<br />

Roadway:<br />

Poor future LOS due to heavy congestion.<br />

High driveway density on east side.<br />

Access analysis indicates need for driveway consolidation.<br />

Pedestrian:<br />

Discontinuous sidewalks.<br />

Crosswalk on west side of Oracle Road at Miracle Mile intersection is not<br />

ADA compliant.<br />

69.5 69.0 Oracle Road to<br />

Fairview Avenue<br />

Roadway:<br />

Non-standard median lighting.<br />

High driveway density.<br />

Access analysis indicates need for driveway consolidation.<br />

Pedestrian:<br />

69.0 68.5 Fairview Avenue to<br />

Flowing Wells Road<br />

68.5 68.1 Flowing Wells Road<br />

to Interstate<br />

Discontinuous sidewalks.<br />

Roadway:<br />

Non-standard median lighting.<br />

Highway driveway density.<br />

High crash rate intersection at Flowing Wells Road intersection (ranked<br />

No. 2).<br />

123 percent increase in crash rate at Flowing Wells Road intersection.<br />

Access analysis indicates need for driveway consolidation.<br />

Transit:<br />

Transit buses cannot make southbound to eastbound right-turn at Fairview<br />

Avenue without encroaching into opposing traffic lanes because of<br />

position of utility poles at the corner.<br />

Pedestrian:<br />

Discontinuous sidewalks.<br />

Roadway:<br />

Poor future LOS due to heavy congestion.<br />

Eastbound left-turn lane at Flowing Wells/Miracle Mile intersection<br />

experiences high volumes during peak hours.<br />

Non-standard median lighting.<br />

High driveway density.<br />

Pedestrian:<br />

Discontinuous sidewalks.<br />

Bicycle:<br />

No bicycle facilities.<br />

Existing congestion level is year 2002 from PAG.<br />

Future congestion level is year 2030 with PAG 2030 RTP and RTA projects assumed in place.<br />

SR <strong>77</strong>/Oracle Road Multimodal Corridor Profile Study May 2007<br />

Final Report Page 6-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!