12.05.2014 Views

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exhibit 9-1<br />

LIST OF PROPOSED PROJECTS<br />

Number Milepost Location SR <strong>77</strong> Deficiency<br />

Deficiency<br />

Priority<br />

Ranking<br />

Project<br />

Total Cost<br />

($ X 1,000)<br />

Affected<br />

Jurisdiction<br />

Time<br />

Frame<br />

Planned or<br />

Programmed<br />

CAPACITY PROJECTS<br />

C-1 TBD TBD<br />

Need for alternative high capacity<br />

<strong>corridor</strong> to relieve congestion along<br />

SR <strong>77</strong>. 2<br />

Feasibility <strong>study</strong> for<br />

alternative high capacity<br />

<strong>corridor</strong>. Study to evaluate<br />

regional impacts of new high<br />

capacity <strong>corridor</strong> N/S<br />

connecting to a new high<br />

capacity E/W <strong>corridor</strong>. This<br />

<strong>study</strong> would determine<br />

whether sufficient traffic<br />

could be diverted from Oracle<br />

Rd. to eliminate the need to<br />

widen to 8-lanes or construct<br />

GSIs. $400<br />

<strong>Pima</strong> County,<br />

ADOT, Oro<br />

Valley, City of<br />

Tucson near No<br />

C-2<br />

C-3<br />

C-4<br />

103.3 -<br />

91.1<br />

SR <strong>77</strong>-79 junction to Town of<br />

Oracle Poor LOS by 2030 2 DCR for 4-lane widening $500 Pinal County long No<br />

103.3 -<br />

91.1 SR <strong>77</strong>-79 junction to Town of Oracle Poor LOS by 2030 2<br />

103.3 -<br />

91.1<br />

C-5 91.9 Milepost 91.9<br />

C-6 92 SR <strong>77</strong>, Milepost 92<br />

SR <strong>77</strong>-79 junction to Town of Oracle<br />

(12.2 mi) Poor LOS by 2030 2<br />

C-7 91.14 SR <strong>77</strong>/SR 79 junction<br />

C-8<br />

C-9<br />

C-10<br />

91.14 -<br />

88.2<br />

91.14 -<br />

88.2<br />

91.14 -<br />

88.2<br />

C-11 88.2 - 81.8<br />

C-12<br />

C-13<br />

C-14<br />

C-15<br />

C-16<br />

C-17<br />

C-18<br />

81.8 - 79.4<br />

and 79.1 -<br />

<strong>77</strong>.5<br />

85.75 -<br />

84.25<br />

85.75 -<br />

84.25<br />

85.75 -<br />

84.25<br />

84.25 -<br />

76.37<br />

84.25 -<br />

76.37<br />

84.25 -<br />

76.37<br />

Drainage culvert headwall is in<br />

the clear zone 1<br />

Identified need in ADOT<br />

Statewide Plan Intelligent<br />

Transportation Infrastructure<br />

(Dec. 2002) 3<br />

Safety concerns include elevation<br />

changes, narrow <strong>road</strong>, poor sight<br />

distance, late afternoon sun blinds<br />

motorists. Also, second highest<br />

ratio of day to night crashes. 1<br />

SR <strong>77</strong>/79 junction to Pinal County<br />

Line Poor LOS by 2030 2 DCR for 6-lane widening $500<br />

SR <strong>77</strong>/79 junction to Pinal County<br />

Line Poor LOS by 2030 2 Design for 6-lane widening $1,800<br />

SR <strong>77</strong>/79 junction to Pinal County<br />

Line Poor LOS by 2030 2<br />

Design of 4-lane widening<br />

project $3,700 Pinal County long No<br />

Construction of four lane<br />

widening $36,600 Pinal County long No<br />

Reconstruct Drainage<br />

Culvert $650 Pinal County near No<br />

Provide Variable Message<br />

Sign at MP 92 $200 Pinal County mid No<br />

Reconstruct intersection<br />

with widening. Provide<br />

<strong>road</strong>way lighting. $500 Pinal County near No<br />

Widen to 6 lane divided<br />

<strong>road</strong>way, possibly with<br />

<strong>road</strong>way segment lighting. $18,000<br />

ADOT/Pinal<br />

County long No<br />

ADOT/Pinal<br />

County long No<br />

ADOT/Pinal<br />

County long No<br />

SR <strong>77</strong>: Pinal County Line to<br />

Tangerine Road, Phase 1 Capacity deficiencies 1 Widen to 6 lanes $18,000 ADOT near<br />

Widen to 6 lanes<br />

SR <strong>77</strong>: Tangerine Road to La<br />

(incorporate equestrian ped<br />

Reserve Drive & Pusch View Lane<br />

pushbutton at Linda Vista<br />

to Calle Concordia Capacity deficiencies 1 Blvd. Intersection) $26,500 ADOT near<br />

SR <strong>77</strong>, Golder Ranch Road to Oro<br />

Valley Town Limits (north<br />

limits)(1.5 miles) Poor LOS by 2030 1 DCR for 8-lane widening $200 <strong>Pima</strong> County long No<br />

SR <strong>77</strong>, Golder Ranch Road to Oro<br />

Valley Town Limits (north<br />

limits)(1.5 miles) Poor LOS by 2030 1 Design for 8-lane widening $1,000 <strong>Pima</strong> County long No<br />

SR <strong>77</strong>, Golder Ranch Road to Oro<br />

Valley Town Limits (north<br />

limits)(1.5 miles) Poor LOS by 2030 1<br />

SR <strong>77</strong>, Oro Valley northern Town<br />

limits to Oro Valley southern<br />

Town limits (south of Magee<br />

Road) Poor LOS by 2030 1 DCR for 8-lane widening $500<br />

SR <strong>77</strong>, Oro Valley northern Town<br />

limits to Oro Valley southern<br />

Town limits (south of Magee<br />

Road) Poor LOS by 2030 1 Design for 8-lane widening $5,300<br />

SR <strong>77</strong>, Oro Valley northern Town<br />

limits to Oro Valley southern<br />

Construction of 8-lane<br />

Town limits (south of Magee<br />

widening including $700K<br />

Road) Poor LOS by 2030 1<br />

for ROW $53,700<br />

Yes<br />

(PP-1)<br />

Yes<br />

(PP-2)<br />

Construction of 8-lane<br />

widening $10,000 <strong>Pima</strong> County long No<br />

Town of Oro<br />

Valley long No<br />

Town of Oro<br />

Valley long No<br />

Town of Oro<br />

Valley long No<br />

C-19 79.5 SR <strong>77</strong> / First Avenue Crash rate increase 1 Intersection improvements $500<br />

ADOT / Oro<br />

Valley near Yes (PP-3)<br />

SR <strong>77</strong>/Oracle Road Multimodal Corridor Profile Study May 2007<br />

Final Report Page 9-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!