sr 77/oracle road multimodal corridor profile study final report - Pima ...
sr 77/oracle road multimodal corridor profile study final report - Pima ...
sr 77/oracle road multimodal corridor profile study final report - Pima ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Exhibit 9-1<br />
LIST OF PROPOSED PROJECTS<br />
Number Milepost Location SR <strong>77</strong> Deficiency<br />
Deficiency<br />
Priority<br />
Ranking<br />
Project<br />
Total Cost<br />
($ X 1,000)<br />
Affected<br />
Jurisdiction<br />
Time<br />
Frame<br />
Planned or<br />
Programmed<br />
CAPACITY PROJECTS<br />
C-1 TBD TBD<br />
Need for alternative high capacity<br />
<strong>corridor</strong> to relieve congestion along<br />
SR <strong>77</strong>. 2<br />
Feasibility <strong>study</strong> for<br />
alternative high capacity<br />
<strong>corridor</strong>. Study to evaluate<br />
regional impacts of new high<br />
capacity <strong>corridor</strong> N/S<br />
connecting to a new high<br />
capacity E/W <strong>corridor</strong>. This<br />
<strong>study</strong> would determine<br />
whether sufficient traffic<br />
could be diverted from Oracle<br />
Rd. to eliminate the need to<br />
widen to 8-lanes or construct<br />
GSIs. $400<br />
<strong>Pima</strong> County,<br />
ADOT, Oro<br />
Valley, City of<br />
Tucson near No<br />
C-2<br />
C-3<br />
C-4<br />
103.3 -<br />
91.1<br />
SR <strong>77</strong>-79 junction to Town of<br />
Oracle Poor LOS by 2030 2 DCR for 4-lane widening $500 Pinal County long No<br />
103.3 -<br />
91.1 SR <strong>77</strong>-79 junction to Town of Oracle Poor LOS by 2030 2<br />
103.3 -<br />
91.1<br />
C-5 91.9 Milepost 91.9<br />
C-6 92 SR <strong>77</strong>, Milepost 92<br />
SR <strong>77</strong>-79 junction to Town of Oracle<br />
(12.2 mi) Poor LOS by 2030 2<br />
C-7 91.14 SR <strong>77</strong>/SR 79 junction<br />
C-8<br />
C-9<br />
C-10<br />
91.14 -<br />
88.2<br />
91.14 -<br />
88.2<br />
91.14 -<br />
88.2<br />
C-11 88.2 - 81.8<br />
C-12<br />
C-13<br />
C-14<br />
C-15<br />
C-16<br />
C-17<br />
C-18<br />
81.8 - 79.4<br />
and 79.1 -<br />
<strong>77</strong>.5<br />
85.75 -<br />
84.25<br />
85.75 -<br />
84.25<br />
85.75 -<br />
84.25<br />
84.25 -<br />
76.37<br />
84.25 -<br />
76.37<br />
84.25 -<br />
76.37<br />
Drainage culvert headwall is in<br />
the clear zone 1<br />
Identified need in ADOT<br />
Statewide Plan Intelligent<br />
Transportation Infrastructure<br />
(Dec. 2002) 3<br />
Safety concerns include elevation<br />
changes, narrow <strong>road</strong>, poor sight<br />
distance, late afternoon sun blinds<br />
motorists. Also, second highest<br />
ratio of day to night crashes. 1<br />
SR <strong>77</strong>/79 junction to Pinal County<br />
Line Poor LOS by 2030 2 DCR for 6-lane widening $500<br />
SR <strong>77</strong>/79 junction to Pinal County<br />
Line Poor LOS by 2030 2 Design for 6-lane widening $1,800<br />
SR <strong>77</strong>/79 junction to Pinal County<br />
Line Poor LOS by 2030 2<br />
Design of 4-lane widening<br />
project $3,700 Pinal County long No<br />
Construction of four lane<br />
widening $36,600 Pinal County long No<br />
Reconstruct Drainage<br />
Culvert $650 Pinal County near No<br />
Provide Variable Message<br />
Sign at MP 92 $200 Pinal County mid No<br />
Reconstruct intersection<br />
with widening. Provide<br />
<strong>road</strong>way lighting. $500 Pinal County near No<br />
Widen to 6 lane divided<br />
<strong>road</strong>way, possibly with<br />
<strong>road</strong>way segment lighting. $18,000<br />
ADOT/Pinal<br />
County long No<br />
ADOT/Pinal<br />
County long No<br />
ADOT/Pinal<br />
County long No<br />
SR <strong>77</strong>: Pinal County Line to<br />
Tangerine Road, Phase 1 Capacity deficiencies 1 Widen to 6 lanes $18,000 ADOT near<br />
Widen to 6 lanes<br />
SR <strong>77</strong>: Tangerine Road to La<br />
(incorporate equestrian ped<br />
Reserve Drive & Pusch View Lane<br />
pushbutton at Linda Vista<br />
to Calle Concordia Capacity deficiencies 1 Blvd. Intersection) $26,500 ADOT near<br />
SR <strong>77</strong>, Golder Ranch Road to Oro<br />
Valley Town Limits (north<br />
limits)(1.5 miles) Poor LOS by 2030 1 DCR for 8-lane widening $200 <strong>Pima</strong> County long No<br />
SR <strong>77</strong>, Golder Ranch Road to Oro<br />
Valley Town Limits (north<br />
limits)(1.5 miles) Poor LOS by 2030 1 Design for 8-lane widening $1,000 <strong>Pima</strong> County long No<br />
SR <strong>77</strong>, Golder Ranch Road to Oro<br />
Valley Town Limits (north<br />
limits)(1.5 miles) Poor LOS by 2030 1<br />
SR <strong>77</strong>, Oro Valley northern Town<br />
limits to Oro Valley southern<br />
Town limits (south of Magee<br />
Road) Poor LOS by 2030 1 DCR for 8-lane widening $500<br />
SR <strong>77</strong>, Oro Valley northern Town<br />
limits to Oro Valley southern<br />
Town limits (south of Magee<br />
Road) Poor LOS by 2030 1 Design for 8-lane widening $5,300<br />
SR <strong>77</strong>, Oro Valley northern Town<br />
limits to Oro Valley southern<br />
Construction of 8-lane<br />
Town limits (south of Magee<br />
widening including $700K<br />
Road) Poor LOS by 2030 1<br />
for ROW $53,700<br />
Yes<br />
(PP-1)<br />
Yes<br />
(PP-2)<br />
Construction of 8-lane<br />
widening $10,000 <strong>Pima</strong> County long No<br />
Town of Oro<br />
Valley long No<br />
Town of Oro<br />
Valley long No<br />
Town of Oro<br />
Valley long No<br />
C-19 79.5 SR <strong>77</strong> / First Avenue Crash rate increase 1 Intersection improvements $500<br />
ADOT / Oro<br />
Valley near Yes (PP-3)<br />
SR <strong>77</strong>/Oracle Road Multimodal Corridor Profile Study May 2007<br />
Final Report Page 9-3