12.05.2014 Views

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

sr 77/oracle road multimodal corridor profile study final report - Pima ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LIST OF EXHIBITS<br />

(Continued)<br />

Page<br />

Exhibit 7-1 POTENTIAL HIGH-CAPACITY ALTERNATE CORRIDOR 7-3<br />

Exhibit 7-2 SUMMARY OF ROADWAY CAPACITY IMPROVEMENT<br />

OPTIONS ON SR <strong>77</strong> 7-4<br />

Exhibit 7-3 PORTION OF SR <strong>77</strong> CORRIDOR AND SIGNALIZED INTERSECTIONS<br />

INCLUDED IN THE GSI ANALYSIS 7-6<br />

Exhibit 7-4 EIGHT-LANE URBAN SECTION CONCEPT 7-9<br />

Exhibit 7-5 EIGHT-LANE FRINGE URBAN SECTION CONCEPT 7-10<br />

Exhibit 7-6 SUMMARY OF POTENTIALLY IMPACT PARCELS FOR EIGHT-LANE<br />

WIDENING: AUTO MALL DRIVE TO GOLDER RANCH ROAD 7-13<br />

Exhibit 7-7 SEGMENTS FOR POSSIBLE LIGHTING IMPROVEMENTS 7-16<br />

Exhibit 7-8 PEDESTRIAN AND BICYCLE FACILITY IMPROVEMENT<br />

RECOMMENDATIONS 7-17<br />

Exhibit 7-9 CONSOLIDATION OF WORKSHOP RECOMMENDATIONS<br />

(NORTH HALF OF CORRIDOR) 7-20<br />

Exhibit 7-10 CONSOLIDATION OF WORKSHOP RECOMMENDATIONS<br />

(SOUTH HALF OF CORRIDOR) 7-21<br />

Exhibit 7-11 BRIDGES WITH SUFFICIENCY RATINGS AT OR LESS THAN 80<br />

PERCENT AND WHETHER THEY ARE INCLUDED IN PLANNED<br />

OR PROGRAMMED PROJECTS 7-22<br />

Exhibit 7-12 ITS IMPROVEMENTS 7-24<br />

Exhibit 7-13 EXISTING AASHTO DESIGN DEFICIENCIES FROM PROJECT<br />

ASSESSMENT REPORTS 7-25<br />

Exhibit 7-14 PROPOSED CORRIDOR ACCESS MANAGEMENT CONCEPT<br />

SR <strong>77</strong> – I-10 TO ORACLE 7-26<br />

Exhibit 7-15 LOCATION OF LEVEL 1 AND LEVEL 2 ACCESS MANAGEMENT<br />

SEGMENTS 7-28<br />

Exhibit 8-1<br />

Exhibit 8-2<br />

Exhibit 8-3<br />

SR <strong>77</strong> ROW CONSTRAINTS TO ROADWAY CAPACITY<br />

IMPROVEMENTS 8-2<br />

GENERAL OPPORTUNITIES OR CONSTRAINTS FOR ROADWAY<br />

CAPACITY IMPROVEMENTS 8-3<br />

COMPARISON OF SR <strong>77</strong> SEGMENT EXISTING RIGHT-OF-WAY<br />

WIDTHS TO REQUIREMENTS FOR EIGHT-LANE OR DIAMOND<br />

LANE ALTERNATIVES 8-4<br />

SR <strong>77</strong>/Oracle Road Multimodal Corridor Profile Study May 2007<br />

Final Report<br />

Page xii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!