sr 77/oracle road multimodal corridor profile study final report - Pima ...
sr 77/oracle road multimodal corridor profile study final report - Pima ...
sr 77/oracle road multimodal corridor profile study final report - Pima ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Exhibit 2-1<br />
LIST OF STUDY DOCUMENTS<br />
Arizona Department of Transportation Documents and Information<br />
1. ADOT 5-Year Transportation Facilities Construction Program (FY 2003-2007) Airports and<br />
Highways<br />
2. ADOT MoveAZ Plan – Phase I Report, August 2002, Cambridge Systematics<br />
3. Arizona State Highway Access Policy and Legislation Study, Lima & Associates, DMJM-Harris, March 2001<br />
4. Final Design Concept Report, Shoulder Widening Tucson-Oracle Junction Highway (SR<strong>77</strong>) River<br />
Road to Ina Road, <strong>Pima</strong> County, Arizona (Tracs No. 0<strong>77</strong> PM 072 H 6000 01-L, Project No. S 0<strong>77</strong>-A-<br />
201), Johnson-Brittain & Associates, Revised April 30, 2002<br />
5. Final Project Assessment SR <strong>77</strong>, Junction I-10 to Oracle Road, ADOT Roadway Predesign Section,<br />
October 2002<br />
6. Scoping Letter SR <strong>77</strong>, River Road to First Avenue, Project PM 74 H5257 01C, ADOT Predesign<br />
Program Management Section, June 20, 1996<br />
7. Final Project Assessment, SR <strong>77</strong>, Ina Road to Pusch View Lane, ADOT Roadway Predesign Section,<br />
April 2000<br />
8. Final Report Assessment, SR <strong>77</strong> at Hardy Road, Oro Valley, (Tracs No. 0<strong>77</strong> PM 076 H 4458 01C),<br />
SFC, May 1997<br />
9. Location and Design Study for Tangerine Road, Avra Valley to First Avenue, SBP-483-302PE,<br />
Parsons Brinckerhoff, December 1998.<br />
10. Tucson-Globe-Holbrook Multimodal Corridor Profile Study, Leigh, Scott & Cleary, Inc.,<br />
September 8, 1998<br />
11. US 89 Access Control Study, JHK & Associates, May 1991<br />
12. Initial Project Assessment, SR <strong>77</strong>: Calle Concordia to Tangerine Road, Aztec, March 2003<br />
13. Final Project Assessment, SR <strong>77</strong>,Junction Miracle Mile – Ina Road, Tucson – Oracle Junction<br />
Highway, June 2000, ADOT<br />
14. Final Project Assessment, SR <strong>77</strong>, First Avenue – Tangerine Road, Tucson – Oracle Junction – Globe<br />
Highway, December 1996, ADOT<br />
15. Final Project Assessment, SR <strong>77</strong>, Biosphere II Conference Center, Project <strong>77</strong> PN 096 H3024 01 C, RS<br />
Engineering, November 1991<br />
16. Final Project Assessment, SR <strong>77</strong>, Willow Springs – Oracle, Tucson – Oracle Highway, ADOT, June<br />
1995<br />
17. Final Project Assessment, SR <strong>77</strong>, Junction SR 79 to Oracle, Tucson – Oracle Junction – Globe<br />
Highway, ADOT, January 2001<br />
18. Final Project Assessment, SR <strong>77</strong> at Pinto Lane, Catalina, Tucson – Oracle Junction – Globe Highway,<br />
ADOT, May 1997<br />
19. Arizona Statewide Plan Intelligent Transportation Infrastructure, ADOT, December 2002<br />
20. Miscellaneous ADOT Project Assessments (see list in text)<br />
21. Oracle Highway (SR<strong>77</strong>) Bicycles Safety Shoulders Improvement Project, Transportation<br />
Enhancement Proposal, August 23, 2002.<br />
22. Arizona Transportation Board Policies, November 7, 2002, ADOT<br />
23. ADOT Map of Suitable Bicycle Routes on the State Highway System, November 1996<br />
24. 1998 ADOT State Highway System Log, Arizona Department of Transportation Data Section<br />
25. ADOT State Highway System K, D, and T Factors, 1998<br />
26. Arizona State Highway System Average Annual Daily Traffic (AADT) Volumes, 1993 through 1998<br />
27. State Route <strong>77</strong>, Oracle Road, Traffic Signal Timing, BRW, September 2002<br />
28. Arizona Transportation Information Systems Map Book, ADOT, July 2002<br />
29. Arizona State Transportation Plan, ADOT, December 1994<br />
SR <strong>77</strong>/Oracle Road Multimodal Corridor Profile Study May 2007<br />
Final Report Page 2-2