31.10.2012 Views

TABLE OF CONTENT - Emfuleni Local Municipality

TABLE OF CONTENT - Emfuleni Local Municipality

TABLE OF CONTENT - Emfuleni Local Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TABLE</strong> <strong>OF</strong> <strong>CONTENT</strong><br />

Chapter 1<br />

1.1 Introduction: policy and legislative context 1<br />

1.2 MEC comments 1<br />

1.3 Conclusion 9<br />

Chapter 2<br />

2. Analysis phase 10<br />

2.1 Introduction 10<br />

2.1.1 Area location 10<br />

2.2 Demographic profile 11<br />

2.2.1 Population composition 11<br />

Chapter 3<br />

3.1 Institutional analysis 13<br />

3.2 Legal services 13<br />

3.2.1 Introduction 13<br />

3.2.2 Disciplinary enquiries 13<br />

3.2.3 Active disciplinary hearings 14<br />

3.2.4 Drafting of by-laws and policies 14<br />

3.2.5 Establishment of municipal code 15<br />

3.2.6 Rationalization of by-laws 15<br />

3.2.7 Litigation 16<br />

3.3 Human resources unit analysis introduction 16<br />

3.3.1 Introduction 16<br />

3.3.2 Staff composition 17<br />

3.3.3 Performance management 17<br />

3.3.4 Recruitment, selection and appointments 18<br />

3.3.5 Remuneration and benefits 18<br />

3.4 Information and communication technology 18<br />

3.4.1 Introduction 18<br />

3.4.2 Operations 18<br />

3.4.3 Technical 19<br />

3.4.4 Software 19<br />

3.4.5 Administration 19<br />

3.4.6 Challenges 19<br />

3.5 Communication unit 20<br />

3.5.1 Introduction 20<br />

3.5.2 Communication and marketing strategy 20<br />

3.5.3 Media monitoring and analysis/media liaison 20<br />

3.5.4 Media policy<br />

3.5.5 Publications 20<br />

3.5.6 Electric media (website and intranet) 21<br />

3.5.7 Corporate identity manual 21<br />

3.5.8 Communication forums 21<br />

3.5.9 Capacity Problems 21<br />

3.6 Disability desk 22<br />

i


3.7 Gender desk 22<br />

3.8 HIV/Aids desk 22<br />

3.9 Challenges 23<br />

Chapter 4<br />

4.1 Socio-economic profile & development 24<br />

4.1.1 Guiding principles for LED 24<br />

4.1.2 Employment 24<br />

4.1.3 Economic sector analysis 25<br />

4.1.3.1 Primary sector 25<br />

4.1.3.2 Manufacturing 25<br />

4.1.3.3 Mittal steel performance 27<br />

4.1.3.4 Secondary sector 27<br />

4.1.3.5 Tertiary sector 27<br />

4.1.3.6 Economic performance 28<br />

4.1.3.7 Growth 28<br />

4.1.3.8 The role of informal sector in ELM 30<br />

4.1.3.9 Informal trading 31<br />

4.1.3.10 Challenges 31<br />

4.1.3.11 Challenges for informal trading 32<br />

4.1.3.12 Business development, retention and growth 32<br />

4.1.3.13 Strategy for business retention and growth 33<br />

4.1.3.14 Poverty alleviation in the townships 33<br />

4.1.3.14.1 Hydro-phonics revival 33<br />

4.1.3.14.2 Co-operatives development strategy 33<br />

4.1.3.14.3 Communal farming- livestock 33<br />

4.1.3.14.4 Poverty alleviation project at Vereeniging clinic 34<br />

4.1.3.14.5 SWOT Analysis 34<br />

4.1.3.14.6 Constraints in economic growth 34<br />

Chapter 5<br />

5.1 Electricity 35<br />

5.1.1 Achievements 35<br />

5.1.2 Level of Services 36<br />

5.1.3 Services Backlog 36<br />

5.1.4 Infrastructure 36<br />

5.1.5 Challenges 37<br />

5.1.6 Electricity Backlogs 38<br />

5.2 Electrical Infrastructure 39<br />

5.2.1 Substations 39<br />

5.2.2 Cables 40<br />

5.2.3 Overhead Power Lines 40<br />

5.2.4 Transformers 40<br />

5.2.5 Lights 40<br />

5.2.6 Growth in demand versus Network Capacity 40<br />

5.2.7 Electricity priority area 41<br />

5.2.8 Load shedding 41<br />

ii


Chapter 6<br />

6.1 Roads and stormwater 42<br />

6.1.2 Achievement 42<br />

6.1.3 Capex 43<br />

6.1.4 Challenges 44<br />

6.1.5 Capex progress 08/09 45<br />

6.1.6 SDBIP capex ELM Roll-overs 07/08 46<br />

6.1.7 SDBIP capex (grant funding MIG) projects 08/09 47<br />

6.1.8 SDBIP capex (grant funding MIG) projects 08/09 47<br />

6.1.9 Interventions planned for 08/09 48<br />

6.1.10 Capex short & medium term needs(Backlogs capex) 50<br />

6.2 Infrastructure 51<br />

6.2.1 Potholes 52<br />

6.2.2 Gravel road 52<br />

6.2.3 Road traffic signs 52<br />

6.2.4 Services backlog 52<br />

6.2.5 Linkage and roads and rail networks priority areas 53<br />

Chapter 7<br />

7.1 Community development 54<br />

7.1.1 Public health 54<br />

7.1.2 Social Development 54<br />

7.1.3 Home based care centres in ELM 55<br />

7.1.4 HIV and AIDS 55<br />

7.1.5 HIV and AIDS youth awareness 56<br />

Chapter 8<br />

8.1 Education 57<br />

8.1.1 Educational infrastructure 57<br />

8.1.2 Educational institutions 57<br />

8.1.3 The status of youth 58<br />

8.1.4 <strong>Emfuleni</strong>’s report on the establishment of LYU 58<br />

8.1.5 Youth Expectations 59<br />

8.1.6 Youth advisory centres 59<br />

8.2 Services rendered 60<br />

8.2.1 Youth priority areas 62<br />

8.2.2 Public safety 62<br />

8.2.3 Traffic (law enforcement) 63<br />

8.2.4.1 Traffic and security 63<br />

8.2.4.2 Fire and rescue services 63<br />

8.2.4.3 Safety and training services 63<br />

8.2.4.4 Provide training 64<br />

iii


Chapter 9<br />

9.1 Infrastructure and service delivery 65<br />

9.1.1Property section 65<br />

9.1.1.2 Overview 65<br />

9.2 Situational analysis 65<br />

9.2.1 Moratorium on the sale of land 65<br />

9.2.2 Existing activities 66<br />

9.2.3 Achievements 66<br />

9.2.4 Finalization of the land policy 66<br />

9.2.5 Verification of land audit 66<br />

9.2.6 Transfer of business in former disadvantage areas 66<br />

9.2.7 Key challenges 67<br />

9.2.8 Land audit challenges 67<br />

9.3 Challenges of developing a data base 67<br />

9.3.1 Challenges on transfer of business/crèches/churches 68<br />

9.3.2 Extent of land ownership in hectors 69<br />

9.4 Housing 69<br />

9.4.1 Formal (townships) 69<br />

9.4.2 Informal settlement 70<br />

9.5 Hostels 71<br />

9.5.1 Sebokeng hostel 71<br />

9.5.2 Boipatong hostel 71<br />

9.5.3 Sharpeville hostel 72<br />

9.5.4 Khayelitsha hostel 72<br />

9.5.5 Kwa-Masiza hostel 72<br />

9.5.6 Old Vereeniging hospital 72<br />

9.6 Urban renewal/Evaton renewal(project) 72<br />

9.6.1 Progress report on Evaton renewal 73<br />

9.6.1.2 Summary of projects achieved to date 73<br />

9.6.1.3 Planning and institutional issues 73<br />

9.6.1.4 Housing 74<br />

9.6.1.5 Technical aspects 74<br />

9..6.1.6Construction 74<br />

9.6.1.7 Communication 74<br />

9.6.1.8 <strong>Local</strong> economic development 75<br />

9.6.1.9 Summary of project current activities 75<br />

9.7 Twenty prioritised township programme(20 PTP) 75<br />

9.7.1 The status a guo report 76<br />

9.7.2 Sharpeville 76<br />

9.7.3 Boipatong 76<br />

9.7.4 Bophelong 77<br />

9.7.5 Sebokeng 77<br />

9.8 Neighbourhood development (partnership grant) 77<br />

9.8.1 A brief look at Sharpeville 77<br />

9.8.2 A case study 77<br />

9.8.3 Human settlement 79<br />

9.8.4 Informal settlement 79<br />

iv


Chapter 10<br />

10.1 Water and sanitation services 80<br />

10.1.1 Metsi-a-Lekoa 80<br />

10.2 Achievements 80<br />

10.3 Backlogs in service delivery 80<br />

10.4 Standard of service 81<br />

10.5 Municipal spending on service delivery infrastructure 81<br />

10.5.1 Relating backlogs to municipal spending on services 82<br />

10.5.2 Water backlogs 82<br />

10.6 Sanitation 83<br />

10.6.1 Access to sanitation 83<br />

10.7 Sewer works 84<br />

10.7.1 Sanitation backlogs 84<br />

Chapter 11<br />

11.1 Waste and landfill management 86<br />

11.1.2 Infrastructure 86<br />

11.1.3 Refuse removal backlogs 87<br />

11.1.4 Other legislative issues 87<br />

11.1.5 Recycling initiatives 88<br />

11.1.6 Summary of total volumes of recyclable material 88<br />

11.1.7 Extending services to new areas. 89<br />

11.2 Other initiatives 89<br />

11.3 Cleaner production 90<br />

11.4 Waste disposal 90<br />

11.5 Operation restore dignity 90<br />

11.6 Challenges 91<br />

11.7 Cemeteries 91<br />

11.8 Environmental health and management 92<br />

Chapter 12<br />

12.1 ELM financial position 94<br />

Chapter 13<br />

13.1 IDP strategies phase 101<br />

13.2 Vision 101<br />

13.3 Motto 101<br />

13.4 Mission 101<br />

13.5 Values 101<br />

13.6 Core strategies 101<br />

12.7 Strategic objectives 102<br />

Chapter 14<br />

14.1 Projects Phase 123<br />

14.1.1 Funded Projects 124<br />

14.1.2 Unfunded Projects 134<br />

v


Chapter 15<br />

15.1 Intergration phase 151<br />

vi


LIST <strong>OF</strong> ABBREVIATIONS<br />

AIDS Acquired Immunodeficiency Syndrome<br />

ARV Anti-Retro Viral<br />

BNG Breaking New Ground<br />

CA Chattered Accountant<br />

Capex Capital Funding<br />

CBD Central Business District<br />

CDWs Community Development Workers<br />

CCTV Closed Circuit Television<br />

DBSA Development Bank of Southern Africa<br />

DEAT Department of Environmental Affairs and Tourism<br />

DED Department of Economic Development<br />

DG Director-General<br />

DLA Department of Land Affairs<br />

DME Department of Minerals and Energy<br />

DP Development Planning<br />

DLG Development of <strong>Local</strong> Government<br />

DOH Department of Housing<br />

DPLG Department of Provincial and <strong>Local</strong> Government<br />

DRP Disaster Recovery Plan<br />

DTI Department of Trade and Industry<br />

DWAF Department of Water Affairs and Forestry<br />

EAP Employment Assistance Programme<br />

EFT Electronic Funds Transfer<br />

EIA Environmental Impact Assessment<br />

ELM <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

EPWP Extended Publics Works Programme<br />

EVA Evaton<br />

FBE Free Basic Electricity<br />

FBW Free Basic Water<br />

FML Full Maintenance Lease<br />

FS Financial Services<br />

GAMAP General Accepted Municipal Accounting Practice<br />

GDP Gross Domestic Product<br />

GDP-R Gross Domestic Product per Region<br />

GDS Growth and Development Strategies<br />

GED Gauteng Enterprise Propellers<br />

GGDS Gauteng Growth and Development Strategy<br />

GIS Geographic Information System<br />

GP Gauteng Province<br />

GPG Gauteng Provincial Government<br />

GRAP General Recognised Accounting Practice<br />

Ha Hectare<br />

HDI Historical Disadvantaged Individuals<br />

HIV Human Immunodeficiency Virus<br />

HOD Head of Department<br />

HR Human Resources<br />

HRD Human Resource Development<br />

ICT Information Communication Technology<br />

IDP Integrated Development Plan<br />

vii


IGRA/-Act Intergovernmental Relations Act<br />

IMCI Integrated Management of Childhood Illness<br />

INEP Integrated Electricity Programme<br />

IT Information Technology<br />

IWEX Industrial Waste Exchange<br />

IWMP Integrated Waste Management Plan<br />

JAC Jacobskop<br />

KM Kilometers<br />

KPA Key Performance Areas<br />

KV Kilo Volts<br />

LDV Light Delivery Vehicles<br />

LED <strong>Local</strong> Economic Development<br />

LG <strong>Local</strong> Government<br />

LGWSETA <strong>Local</strong> Government Water SETA<br />

LM <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

LRAD Land Redistribution for Agricultural Development<br />

Programme<br />

MEC Member of the Executive Committee<br />

MFMA Municipal Finance Management Act<br />

MHS Municipal Health Services<br />

MIG Municipal Infrastructure Grant<br />

MM Municipal Manager<br />

MPCs Multi-purpose Centers<br />

MSA Municipal Systems Act<br />

MSS Municipal Support Services<br />

MVA Mega Volt Ampere<br />

NAN Nanascore<br />

NER National Electricity Regulator<br />

NFPA National Fire Protection Association<br />

NGOs Non-governmental Organisations<br />

NQF National Qualifications Framework<br />

NRS National Regulator Services<br />

NSDP National Spatial Development Perspective<br />

NT National Treasury<br />

NWMS National Waste Management Strategy<br />

O&M Operations and Maintenance<br />

Opex Operational Funding<br />

PC Personal Computer<br />

PD Previously Disadvantaged<br />

PGDS Provincial Growth and Development Strategy<br />

PJEC Principal Job Evaluation Committee<br />

PMS Performance Management System<br />

PMTCT Prevention of Mother to Child Transmission<br />

PMU Project Management Unit<br />

POPs Persistent Organic Pollutants<br />

PS Public Safety<br />

PS & CD Public Safety and Community Development<br />

RBO Relationship by Objective<br />

RDP Redistribution and Development Programme<br />

RW Rand Water<br />

SA South Africa<br />

viii


SALGBC South Africa <strong>Local</strong> Government Bargaining Council<br />

SAM Strategic Alignment Management<br />

SASS South African Scoring System<br />

SATSA Southern Africa Tourism Services Association<br />

SCADA Supervisory Control and Data Acquisition Systems<br />

SDF Spatial Development Framework<br />

SDM Sedibeng District <strong>Municipality</strong><br />

SETA Sector Education and Training Authority<br />

SME’s Small and Micro Enterprises<br />

SMME’s Small, Medium and Micro Enterprises<br />

SMS Short Message System<br />

SRAC Sports, Recreation, Arts and Culture<br />

Stats-Sa Statistics South Africa<br />

STI’s Sexually Transmitted Infections<br />

TB Tuberculosis<br />

TLB Tracker Loader Backhoe<br />

Ur Unemployment rate<br />

VCT Voluntary Counseling and Testing<br />

VDB Vanderbijlpark<br />

VIP Ventilated Improved Pit<br />

WCW’s Water Care Works<br />

WMS Water Management System<br />

WRP Water Resource Plan<br />

WSA Water Services Authority<br />

WSDP Water Services Development Plan<br />

WWTW Waste Water Treatment Works<br />

ix


CHAPTER 1<br />

1. POLICY AND LEGISLATIVE CONTEXT<br />

1.1 Introduction<br />

According to the Constitution of the Republic of South Africa (Section 152 and 153)<br />

local government is in charge of the development process in municipalities, and it is in<br />

charge of municipal planning. The constitutional mandate to relate its management,<br />

budgeting and planning functions to its objectives gives a clear indication of the intended<br />

purpose of municipal integrated development planning. The constitution also demands<br />

local government to improve intergovernmental coordination and cooperation to ensure<br />

integrated development across three spheres of government.<br />

White Paper on <strong>Local</strong> Government gives municipalities responsibility to work with<br />

communities and groups within communities to find sustainable ways to their social,<br />

economic and material needs and improve the quality of their lives.<br />

Municipal Systems Act 32 of 2000 (MSA) defines integrated development planning as<br />

one of the core functions of a municipality in the context of its developmental orientation.<br />

MSA requires the IDP to be strategic and inclusive in nature. The IDP should link,<br />

integrate and coordinate other plans, while taking development proposals into account. It<br />

should be aligned with the municipality’s resources and capacity, while forming policy<br />

framework on which annual budgets are based. The integrated Development Plan must<br />

be compatible with national and provincial development plans and planning<br />

requirements.<br />

1.2 MEC’s Comments<br />

MEC: LOCAL GOVERNMENT’S COMMENTS ON THE EMFULENI LOCAL<br />

MUNICIPALITY INTEGRATED DEVELOPMENT PLAN (IDP) FOR 2008/09.<br />

The Department of <strong>Local</strong> Government (DLG) would like to congratulate the municipality<br />

for completing and submitting its final Council approved Integrated Development Plan<br />

(IDP) for 2008/09 to my office for comments. In addition, the Department would like to<br />

extend its appreciation to the <strong>Municipality</strong> for its attendance, support and participation in<br />

implementing the July-to-July Roadmap.<br />

I would like to duly acknowledge the efforts exerted to ensure that the municipality grows<br />

from strength to strength through consciously improving the process of IDP preparation,<br />

implementation, monitoring and review. While much work has been done to ensure that<br />

as government we plan, budget, and implement development through a coordinated<br />

seamless process; we have over the last four years collectively made strides towards<br />

improved integrated service delivery.<br />

I would like to commend the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> for taking into account and<br />

addressing the issues that were raised as part of the comments on the 2007/8 IDP, and<br />

congratulate the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> for improving its ability to comply with<br />

legislative requirements relating to the 2008/09 IDP.<br />

1


COMMENTS ON THE EMFULENI LOCAL MUNICIPALITY IDP<br />

In terms of Section 32(2) of the Municipal Systems Act (MSA), I have concluded that<br />

there is no issue that requires amendments to the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> for 2008/9<br />

and therefore provide my comments below. The comments are clustered according to<br />

the five Key Performance Areas (KPAs) against which the Municipal Integrated<br />

Development Plan was measured.<br />

1. <strong>Local</strong> Economic Development (LED) and Growth<br />

a) The Vaal 21 is a cross boundary<br />

initiative between the Sedibeng<br />

District <strong>Municipality</strong> (SDM) and<br />

Fezile Dabi District <strong>Municipality</strong><br />

(Free State Province) and is<br />

deemed to be widely and evidently<br />

recognized as a means to promote<br />

regional planning and coordination<br />

with adjoining municipalities. The<br />

National Treasury has allocated an<br />

amount of R250 million to the SDM<br />

from the Neighbourhood<br />

Development Partnership Grant<br />

(NDPG) for precinct development<br />

including the Vaal 21. The ELM is<br />

encouraged to liaise with the SDM<br />

to ascertain that the grant filters<br />

through and subsequently the ELM<br />

benefits from it.<br />

b) The reflection of national and<br />

provincial plans and strategies in<br />

the 2008/09 ELM IDP is a clear<br />

indication of the IDP becoming a<br />

plan of all government. Moreover,<br />

the ELM outlined clear alignment<br />

between the IDP and Sedibeng’s<br />

Growth and Development Strategy<br />

(SGDS). The ELM is encouraged<br />

to continue to utilize the SDM<br />

Inter-governmental Relations (IGR)<br />

structures and the July to July<br />

Road Map to further augment<br />

horizontal and vertical<br />

harmonization and alignment<br />

c) It is encouraging that, both the<br />

CBD’s of Vanderbijlpark and<br />

Vereeniging are to be improved<br />

through the establishment of City<br />

Comments/Responses<br />

ELM and other local municipalities in the<br />

District of Sedibeng are part of all the<br />

structures established (Plenary, Political<br />

Forum, Technical Forum and<br />

Secretariat) to facilitate the realisation of<br />

the Vaal 21 concept. ELM is therefore<br />

working very closely with SDM to ensure<br />

that the grant filters through and that the<br />

municipality benefits from the grant.<br />

ELM is also represented in the District –<br />

wide IGR structure to ensure both<br />

horizontal and vertical harmonization<br />

and alignment.<br />

In terms of CBD renewal private sector<br />

investment is further encouraged<br />

through Urban Development Zone<br />

(UDZ). At the moment UDZ is only<br />

2


d) Improvement Districts (CIDs). The<br />

ELM is applauded for this initiative<br />

and indeed the Civic Precinct<br />

Development should improve the<br />

attractiveness of the CBD and<br />

further enhance private sector<br />

investment.<br />

It is noted that the ELM has been<br />

working closely with Gauteng<br />

Economic Development Agency<br />

(GEDA) to develop an LED strategy<br />

and has consequently set the August<br />

2008 as a deadline for the completion<br />

of the strategy. It is critical that the<br />

LED Strategy be aligned to the SDM<br />

SGDS.<br />

e) Agricultural programmes and<br />

projects like food gardens,<br />

commonages and forming of<br />

partnerships with subsistence and<br />

well-established farmers need to<br />

be fully explored to realise<br />

agricultural potential in the<br />

municipal area. It is noted that the<br />

ELM has vast tracks of land<br />

suitable for agriculture according to<br />

research conducted by Gauteng<br />

Department of Agriculture,<br />

Conservation and Environment<br />

(GDACE). However, currently<br />

there is limited activity undertaken<br />

to explore opportunities pertaining<br />

to this sector. The municipality<br />

encouraged to work closely with<br />

GDACE to explore initiatives that<br />

will assist it tap into this resource,<br />

so as to ensure that the<br />

impoverished and landless<br />

communities benefits from the<br />

initiative.<br />

Service Delivery and Infrastructure<br />

Development<br />

a) The shortage of energy generating<br />

capacity within Eskom is a point of<br />

much concern and the load<br />

Comments/Responses<br />

focusing on Vereeniging but it is the<br />

intention of the municipality to extent it<br />

to Vanderbijlpark as well. An enquiry is<br />

being made with Treasury to ascertain if<br />

this will be possible.<br />

A service provider was eventually<br />

appointed to develop a comprehensive<br />

and holistic LED Strategy for ELM. The<br />

appointment process was finalized in<br />

December ‘08 and service level<br />

agreement entered into in January ’09. It<br />

is expected that the strategy will be<br />

finalized end of May ’09. However the<br />

municipality continues to work closely<br />

with GEDA and other Economic<br />

development departments in the<br />

province.<br />

The study conducted by GDACE on the<br />

agricultural potential in ELM was made<br />

available to our municipality and the<br />

development of this sector will therefore<br />

form part of an LED Strategy to be<br />

finalized in May 09.<br />

<strong>Emfuleni</strong> will cooperate with the<br />

Sedibeng District <strong>Municipality</strong> regarding<br />

alternative energy solutions. These<br />

3


shedding or proposed rationing of<br />

electricity has a huge negative<br />

impact on the local economy and<br />

the morale of the community. The<br />

ELM is encouraged to liaise with<br />

SDM over the usage of renewable<br />

energy and explore the possibility<br />

of exploring alternative energy<br />

sources. The DLG is in the<br />

process of developing an Energy<br />

Strategy, in this regard the ELM is<br />

encouraged to work with the<br />

district in developing an Energy<br />

plan to respond to the challenges<br />

of saving energy and using<br />

alternative sources of energy<br />

b) The ELM is commended for<br />

conducting a land audit as it<br />

presents a tool for future planning<br />

and decision-making. It is<br />

recommended the information from<br />

the land audit be incorporated into<br />

the Geographical Information<br />

System (GIS) and cadastral<br />

system. This will aid the<br />

municipality in managing land<br />

development and strategic<br />

packaging available land for future<br />

development.<br />

c) The hygiene and overcrowding<br />

problems and challenges attributed<br />

to deplorable living conditions in<br />

Kwamasiza Hostel are noted. The<br />

ELM is encouraged to continue to<br />

work with the Department of<br />

Housing to address the issue of<br />

hostel upgrading through the 20<br />

Prioritized Township Programme<br />

(20 PTP). Focus must also be<br />

placed on upgrading of other<br />

Comments/Responses<br />

options are however mostly very<br />

expensive and implementation thereof<br />

will most probably require external<br />

funding. This will however be raised in<br />

discussions with the Sedibeng District<br />

<strong>Municipality</strong>.<br />

At present the Land Audit information as<br />

conducted and subsequently submitted<br />

by Emendo Town Planners is being<br />

verified on official level. The cadastral<br />

base has been checked and<br />

amendments were submitted to Emendo<br />

on 9 February 2009 for rectification.<br />

PSU International was appointed by<br />

Council to assist with the data clean up<br />

process which is driven by the Financial<br />

Services Cluster.<br />

As soon as Emendo has rectified the<br />

above mentioned cadastral base, they<br />

will submit a data base of all Council<br />

owned properties to the municipality,<br />

which information will then be cross<br />

checked with the information received<br />

from PSU International during the data<br />

clean up process. This database will<br />

then form the final Land Audit database<br />

for <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong>.<br />

The clean purified water was installed in<br />

the form of Taps and the toilets were<br />

installed.<br />

The Business Plans were drafted,<br />

served and approved regarding the<br />

Hostels<br />

4


hostels in the area including<br />

Sebokeng Hostel, Boipatong,<br />

Sharpeville and Khayelitsha<br />

Hostels.<br />

2. Institutional Development and<br />

Transformation<br />

a) The ELM is encouraged to develop<br />

systems and processes to attract<br />

and retain personnel with critical<br />

skills. The ELM is urged to develop<br />

both an EEP and Staff Retention<br />

Policy urgently if the milestones<br />

set by the municipality are to be<br />

achieved. The municipality is also<br />

encouraged to urgently address<br />

the issue of inadequate office<br />

space to cater for the 400 vacant<br />

posts budgeted for.<br />

b) The IDP cited that the ELM’s<br />

management cadre is largely male<br />

(77.26%), 40.9% of which are<br />

white, reflecting high gender<br />

imbalances. Based on the current<br />

organogram, critical vacancies<br />

should be filled to address<br />

institutional transformation and<br />

women empowerment solely to<br />

fast-track the process of building<br />

the municipality as a sound<br />

institution premised on excellence.<br />

Comments/Responses<br />

The clean purified water was installed in<br />

the form of Taps and the toilets were<br />

installed.<br />

The Business Plans were drafted,<br />

served and approved regarding the<br />

Hostels.<br />

ELM, with the assistance of Resolve, is<br />

in the process of developing an HR<br />

strategy which will address not only the<br />

attraction of skills but also the HR<br />

policies which will assist in transforming<br />

the institution. As a matter of urgency<br />

the EEP policy, Recruitment and<br />

Placement policies have been drafted.<br />

The consultation process has been<br />

finalised and these policies will serve in<br />

the LLF (<strong>Local</strong> Labour Forum) before<br />

going to Council for approval. Office<br />

space is being looked into.<br />

The retention strategy is indeed critical.<br />

However, such a strategy would require<br />

(as its most important component) a<br />

financial or upgraded remuneration<br />

incentive to attract and retain skills.<br />

However it is common cause that<br />

individual municipalities are barred by<br />

the SALGBC to introduce unilateral<br />

changes to its remuneration grades.<br />

This is the sole competency of<br />

SALGBC.<br />

A functional organogram was approved<br />

by Council in March 2008. The process<br />

of filling critical vacancies in underway.<br />

Most importantly, an Employment Equity<br />

Manager has been appointed and will<br />

start working in March 2009. The<br />

position of Training and Transformation<br />

will be filled by end of February<br />

5


c) The absence of an up-to-date<br />

Skills Development Plan may<br />

worsen service delivery and further<br />

exacerbate staff shortage<br />

challenges that the municipality is<br />

currently grappling with. The ELM<br />

is encouraged to review its<br />

Workplace Skills Development<br />

Plan (WSDP) so as to address the<br />

challenges identified regarding the<br />

shortage of skills.<br />

The ELM has been operating<br />

without any Performance<br />

Management System (PMS) for a<br />

while and has since appointed a<br />

service provider to establish the<br />

PMS. The ELM is advised to<br />

expedite the process and<br />

implement a broader corporate<br />

PMS that will be cascaded to all<br />

levels of employment. In so doing<br />

the municipality is also advised to<br />

liaise and work closely with Trade<br />

Union representatives to avoid<br />

possible disputes over the issue of<br />

incentives.<br />

d) It has been noted that the ELM<br />

seems to be entangled in myriad of<br />

litigation procedures that will have<br />

a negative impact on service<br />

delivery. It is reported in the<br />

2008/9 IDP that 52% of the civil<br />

matters have been settled whilst<br />

48% are still pending. The ELM is<br />

encouraged to speedily and<br />

amicably resolve all these disputes<br />

to ascertain that service delivery<br />

matters assume pre-eminence.<br />

The IDP reveals the use of different<br />

sources of information in the analysis<br />

phase of the municipal status quo.<br />

This does not augur well for service<br />

delivery and may compromise joint<br />

planning and implementation of<br />

projects. It is recommended that the<br />

municipality utilise a single formal data<br />

set (Stats SA) to ascertain congruency<br />

in planning through accurate<br />

projections.<br />

Comments/Responses<br />

The revised WSP was submitted to the<br />

Labour Department in June 2008. The<br />

next WSP to be submitted in June 2009.<br />

Will be informed by the skills audit to be<br />

done internally. The Basetsana Group<br />

assigned to <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

to conduct the skills audit did non<br />

feedback to the <strong>Municipality</strong>, hence the<br />

state of the current WSP.<br />

The PMDS is being cascaded down<br />

from Section 56 employees and it now<br />

includes levels 1 to 5 employees which<br />

form part of management. A booklet<br />

format performance system will be<br />

introduced to lower levels.<br />

We hope to do the assessment of levels<br />

1 to 5 between February and March<br />

2009.<br />

The civil matters currently before the<br />

courts are outside the control of the<br />

municipality due to court processes.<br />

The disciplinary matters have been<br />

greatly reduced. Currently there<br />

are……. Of cases.<br />

Noted.<br />

6


Financial Management and Viability<br />

a) The ELM monthly budget<br />

statement submitted to the<br />

Provincial Treasury on the 31 st of<br />

May 2008 indicates that the<br />

municipality has spent a total of<br />

37% of the capital expenditure.<br />

The ELM is urged to put<br />

mechanisms and processes in<br />

place to ensure that it is able to<br />

spend 100% of its CAPEX budget<br />

in implementing the 2008/09 IDP.<br />

b) The total debt outstanding reflects<br />

an amount of R2,116,765 million<br />

that is currently owed to the<br />

municipality as at 31 May 2008.<br />

The ELM IDP states that the<br />

municipality is robustly engaged in<br />

a process of intensifying a credit<br />

control measures whilst on the<br />

other hand striking a balance with<br />

a provincial government agenda<br />

towards service delivery. I<br />

therefore recommend that the ELM<br />

put measures in place to urgently<br />

address the matter.<br />

c) Municipal Infrastructure Grant<br />

(MIG) fund is a consolidated<br />

conditional grant aimed at<br />

providing South Africans with a<br />

basic level of service to alleviate<br />

poverty through promotion of<br />

infrastructure development and<br />

maximisation of employment<br />

through labour intensive<br />

construction methods. According<br />

to figures from MIG fund, the ELM<br />

was allocated R 92 891 000.00 for<br />

2007/08 and managed to spend R<br />

87 854 000.00, which is 95% of the<br />

total allocation. The municipality is<br />

congratulated and urged to put<br />

mechanisms and processes in<br />

place to ensure 100% expenditure<br />

of the MIG.<br />

Democracy and Good Governance<br />

a) During the IDP Retreat held in<br />

Parys from the 20 to the 22 June<br />

Comments/Responses<br />

There is currently a turn-around strategy<br />

in place to increase capital spending in<br />

the 2008/09 year. The strategy includes<br />

multiple advertising of projects, filling of<br />

vacancies, better communication and<br />

education of user departments.<br />

We currently have PSU running with the<br />

revenue enhancement data cleaning<br />

project which will clean the data and will<br />

improve the payment levels in the future<br />

through ensuring that debt that is<br />

prescribed is written off and where<br />

applicable the debt levied is reliable.<br />

Revenue enhancement project has<br />

been undertaken by the municipality.<br />

All the MIG funds received in 2007/08<br />

were spent. Only a small portion of the<br />

counter-funding was rolled over.<br />

Sustainable collection services have<br />

been implemented in all urban areas.<br />

7


2008 between SDM, ELM and<br />

Ward Committees, the ELM<br />

committed to address the most<br />

pressing needs identified through<br />

the ward planning meetings.<br />

Among the priority needs identified<br />

were, inter alia, road infrastructure<br />

backlogs, contamination of water<br />

resources through sewer spillage,<br />

billing system, theft of electrical<br />

cables and lack of streets lights,<br />

and inefficient and irregular waste<br />

removal services. The ELM is<br />

commended for integrating Ward<br />

Committees into the work of the<br />

Council.<br />

b) The abovementioned<br />

commitments affirm the efficacy of<br />

the ward based planning system<br />

as a means to collectively identify<br />

challenges and jointly address<br />

them with the communities. The<br />

municipality is commended for its<br />

comprehensive ward based<br />

planning process.<br />

The Community Development<br />

Workers (CDW’s) play a significant<br />

role as a vehicle to ensure that<br />

government adequately addresses the<br />

needs of the communities, and the<br />

ELM is encouraged to strengthen<br />

relationships with CDW’s to aid<br />

increase communication with<br />

communities.<br />

Comments/Responses<br />

The current 100 day action plan<br />

provides for continued removal of illegal<br />

dumps in each ward on a planned basis.<br />

The only existing backlogs in terms of<br />

household collection services are in<br />

informal settlement areas and new<br />

areas developed that have no proper<br />

road infrastructure in place. A<br />

systematic and regular removal of illegal<br />

dumps are also applicable for these<br />

areas weekly household.<br />

Noted.<br />

The CDW’s has been in operation at<br />

ELM, working together with the<br />

speaker’s office .They function in all the<br />

identified areas within the municipal<br />

area.<br />

8


1.3 CONCLUSION<br />

In conclusion, the Department would once again like to thank you for the quality work<br />

that has been produced through the IDP. The Department would also like to reiterate the<br />

need for all of government to work together in building a viable local government for<br />

sustainable communities.<br />

Please note that the Department will continue to monitor the implementation of the IDP<br />

through the Service Delivery and Budget Implementation Plan (SDBIP). Both the MSA<br />

and the MFMA states that a municipality must adopt a predetermined process plan for<br />

the review and approval of its IDP. In this regard I look forward to receiving the 2009/10<br />

process plan which we expect to be tabled in the coming months; to assist align the Julyto-July<br />

Roadmap to your processes.<br />

9


CHAPTER 2<br />

2. ANALYSIS PHASE<br />

2.1 Introduction<br />

This chapter describes the geographical area within which <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> is<br />

positioned within the Gauteng Province and the country at large. In addition, this<br />

chapter provides information on demographic profile and the status of service delivery<br />

covering the following areas local economic development, service delivery, financial<br />

issues, institutional issues, demographic figures, spatial development, environmental<br />

issues, information technology, Sports and Recreation, Arts and Culture, libraries, social<br />

development, public safety and all issues service delivery and public administration.<br />

2.1.1 Area Location<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> is one of three local municipalities that constitute the<br />

Sedibeng District <strong>Municipality</strong>. The municipality is situated at the Western-most part of<br />

the District, which covers the entire southern area of the Gauteng province extending<br />

along a 120 kilometres axis from east to west. It covers an area of 987.45 km². The<br />

Vaal River forms the southern boundary of the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> and its<br />

strategic location affords it many opportunities for tourism and other forms of economic<br />

development. <strong>Emfuleni</strong> shares boundaries with Metsimaholo <strong>Local</strong> <strong>Municipality</strong> and<br />

Fezile Dabi District <strong>Municipality</strong> in the Free State to the south , Midvaal <strong>Local</strong><br />

<strong>Municipality</strong> to the east, the City of Johannesburg metropolitan area to the north and<br />

Westonaria and Potchefstroom (in North West Province) <strong>Local</strong> Municipalities to the west.<br />

The municipality is strategically located with access to a well-maintained road network -<br />

N1 national route linking Johannesburg and Bloemfontein, which traverses <strong>Emfuleni</strong>.<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> has two main city/town centres, namely Vereeniging and<br />

Vanderbijlpark within the area and Sasolburg is only 10 kilometres to the south, across<br />

the provincial boundary. It forms the “heartland” of what was formerly known as the Vaal<br />

Triangle, renowned for its contribution to the iron and steel industry in South Africa.<br />

<strong>Emfuleni</strong> also contains approximately six large Peri-urban townships of Evaton,<br />

Sebokeng, Sharpeville, Boipatong, Bophelong and Tshepiso. The latter six areas lack<br />

facilities associated with towns of their size however there been a numbers of Shopping<br />

malls developed in the past few years. The other approximately ten small settlements<br />

tend to be suburban settlements within six kilometres of the above towns; they are<br />

Bonanne, Steel Park, Duncanville, Unitas Park, Arcon Park, Sonlandpark, Waldrift, Rustter-Vaal,<br />

Roshnee and Debonairpark.<br />

10


Map 2.1: Area Location<br />

Demarcation Board: 2001<br />

The municipal area also comprises a number of large residential areas, all of which<br />

require considerable investment in infrastructure and environment upgrading. The<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> is rich in history as it encapsulates the Anglo Boer War,<br />

heritage assets such as the Sharpeville Monument and the liberation struggle<br />

epitomized by the signing of the Constitution of the Republic in 1996 in Sharpeville.<br />

<strong>Emfuleni</strong>’s settlement patterns are largely dictated by the history of the area. The<br />

evidence of San rock engravings near the Vaal River verifies that the San people<br />

originally inhabited <strong>Emfuleni</strong>.<br />

2.2 DEMOGRAPHIC PR<strong>OF</strong>ILE<br />

2.2.1 Population Composition<br />

The racial composition of <strong>Emfuleni</strong> population is indicated in the table below and<br />

geographically most of the African population is concentrated in areas such as<br />

Sebokeng, Evaton, Sharpeville, Boipatong and Bophelong. This illustrates the<br />

entrenched racial divisions within the municipality. These tend also to reflect the socioeconomic<br />

geography of the municipality and the pattern of access to services.<br />

11


Table 2.1: Population Size<br />

Year Population Source<br />

2001 658 422 Stats SA (2001)<br />

2007 650 867 Community Survey 2007<br />

Community Survey: 2007<br />

The Community Survey reveal that ELM population size has slightly decrease from 658<br />

422 in 2001 to 650 867 in 2007.<br />

The Community Survey results do not talk to the age break down as it was the case with<br />

Census 2001.<br />

The DBSA figures will on time to time be reflected into the document as a point of<br />

reference in instances where Community Survey did not cover the matter.<br />

Table 2.2: Demographic Composition<br />

African Coloured Indian/Asian White TOTAL<br />

Male 271 011 3 416 3 010 45 254 322 691<br />

Female 282 296 3 595 2 881 46 959 335 731<br />

TOTAL 553 307 7 011 5 891 92 213 658 422<br />

Source: Stats SA, 2001<br />

NB. The recently released Community Survey results did not cover the demographic<br />

composition of the area. In this instance one has to rely on the 2001 Census results for<br />

planning purpose.<br />

Table 2.3: Migration and population flows<br />

The table below depicts ELM migration and immigration<br />

Main Area Inflow<br />

Outflow<br />

Boipatong -4 885<br />

Bophelong 16 962<br />

Evaton 13 975<br />

Sebokeng 13 570<br />

Sharpeville -3 208<br />

Tshepiso 9 987<br />

Vanderbijlpark -2 390<br />

Vereeniging 6 097<br />

TOTAL 60 632 -10 704<br />

Source: DBSA, 2005<br />

The above table indicates a large population inflow to <strong>Emfuleni</strong> municipal area in<br />

contrast with population little outflow. This may be attributed to Housing development<br />

within <strong>Emfuleni</strong> <strong>Municipality</strong> and our proximity to the City of Joburg as the SA economic<br />

hub.<br />

12


CHAPTER 3<br />

3.1 INSTITUTIONAL ANALYSIS<br />

Section 50 of the Municipal Systems Act underwrites the above-mentioned. Section 51<br />

of the said Act determines the manner in which a local authority must organise its<br />

administration in order to achieve the goals as determined by the above-mentioned<br />

sections of the said two Acts.<br />

Section 51 stipulates as follows:<br />

Organisation of administration:<br />

A municipality must within its administrative and financial capacity establishes and<br />

organise its administration in a manner that would enable the municipality to:-<br />

(a) be responsive to the needs of the local community;<br />

(b) facilitate a culture of public service and accountability amongst staff;<br />

(c) be performance orientated and focused on the objects of local government set<br />

out in section 152 of the Constitution and its developmental duties as required by<br />

section 153 of the Constitution;<br />

(d) ensure that its political structures, political office bearers and managers and other<br />

staff members align their roles and responsibilities with the priorities and<br />

objectives set out in the municipality’s integrated development plan;<br />

respond to changing priorities and circumstances;<br />

(e) perform its functions-<br />

through operationally effective and appropriate administrative units and<br />

mechanisms, including departments and other functional or business<br />

units; and<br />

when necessary, on an decentralised basis;<br />

(f) assign clear responsibilities for the management and co-ordination of these<br />

administrative units and mechanisms;<br />

(g) hold the municipal manager accountable for the overall performance of the<br />

administration;<br />

(h) maximise efficiency of communication and decision-making within the<br />

administration;<br />

(i) involve staff in management decisions as far as practicable; and<br />

(j) provide an equitable, fair, open and non-discriminatory working environment.<br />

3.2 LEGAL SERVICE<br />

3.2.1 Introduction<br />

Legal services mainly gives support to all the clusters in the form of prosecutions and<br />

disciplinary enquiries, drafting and vetting of By-laws and policies, litigation, debt<br />

collection, contract management and legal advise.<br />

3.2.2 Disciplinary Enquiries<br />

The function of discipline in the employment is to ensure that employees contribute<br />

effectively and efficiently to the aims and goals of the institution. It is the employer’s right<br />

to ensure that its employees adhere to reasonable standards of efficiency and conduct.<br />

Furthermore, disciplinary of employees is a corrective and not a punitive measure.<br />

13


The municipality in its endeavour to uphold efficiency and good conduct have conducted<br />

several disciplinary enquiries.<br />

3.2.3 Active Disciplinary hearing as from July to September 2008<br />

ELM legal department has 36 matters, 12 of which are completed, 7 went on appeal and<br />

the balance of 17 is receiving special attention to be addressed.<br />

Charges Outcome/Sanction Comments<br />

Failing to put Matter for settlement negotiations<br />

systems in place underway to be settled by 10/10/08<br />

Insubordinations Matter for settlement negotiations<br />

underway to be settled by 10/10/08<br />

Bribery and Fraud<br />

(traffic Officers)<br />

Awaiting Judgment<br />

Malicious damage<br />

to council property<br />

Remanded Sine Die<br />

Unauthorized use<br />

of council property<br />

Charges withdrawn(lack of evidence) Concluded<br />

Gross negligence Set Down 27-10/08<br />

use of council<br />

resources to run<br />

own business<br />

For hearing<br />

Gross Dishonesty • final warnings<br />

and or Gross<br />

• Matter referred to<br />

misconduct<br />

• Date arranged for Hearing,<br />

• 12 accused<br />

Copper cable Theft Suspension without Pay for 10 days<br />

without pay and no increment for 12<br />

months.<br />

Concluded<br />

Diesel theft Guilt, suspension without pay for 10<br />

days<br />

Concluded<br />

Absenteeism Dismissed<br />

Aggressive Matter did Not sit due to the<br />

behaviour<br />

complainant was not available, it will<br />

Disclosure of<br />

Private Information<br />

continue.<br />

Breach of<br />

Employment<br />

Contract<br />

Awaiting Arbitration date<br />

Theft and<br />

Negligence<br />

Suspension without Pay for 10 days . Concluded<br />

Fraud Dismissal<br />

3.2.4 Drafting and Vetting of By-laws and Policies<br />

The following policies have been drafted and circulated:<br />

• Recruitment and Selection Policy<br />

• Employment Equity Policy<br />

• Grievance Policy<br />

14


• Disciplinary policy<br />

• Anti-fraud and Anti-corruption Strategy<br />

3.2.5 Establishment of the Municipal Code<br />

A municipal code has been established as provided for by Section 15 of the <strong>Local</strong><br />

Government: Municipal Systems Act, Act 32 of 2000. The code is in a leaflet form and<br />

filed in the legal library. (Municipal Code is a schedule of all by-laws of the municipality<br />

grouped in terms of the nature of the by-laws.) The public can have access to the code<br />

and the by-laws and notices were sent out to the public to inform them about the code.<br />

3.2.6 Rationalization of By-laws<br />

On the 14 of September 2007 a meeting was called by the Gauteng Department of <strong>Local</strong><br />

Government where that drafting and promulgation of by-laws were discussed. It was<br />

resolved that the Department will standardize the by-laws for the province, and failure to<br />

adhere to the by-laws will result into serious offence. Consultants have been appointed<br />

by the province to assist municipalities in drafting their by-laws and where drafting or<br />

promulgation has already been done then consultants will comment on those. In<br />

instances whereby peculiar situations exist, then such a municipality will promulgate its<br />

own by-laws with the assistance of the consultants .By end of July 2008 the consultants<br />

will release a we-site and a data base where all the promulgated by –laws of the various<br />

municipalities within Gauteng will be published.<br />

The under-mentioned by-laws were promulgated and are in operation in <strong>Emfuleni</strong> <strong>Local</strong><br />

municipality.<br />

• Water and Sanitation;<br />

• Credit Control and Debt Collection;<br />

• Cemetery and Cremation;<br />

• Standard Street and miscellaneous;<br />

• Aerial system;<br />

• Solid Waste Management;<br />

• Electricity;<br />

• Street and Projection<br />

Drafted by-laws which are under discussion with the various clusters/departments are<br />

the following:<br />

• Traffic;<br />

• Keeping of animals;<br />

• Standing Orders (Revised)<br />

• Prevention of Public Noise<br />

• Prevention of Public Nuisance;<br />

• Fire and Safety Emergency (+ 3 others)<br />

• Ward Committees;<br />

• Advertising;<br />

• Public/Street Trading;<br />

• Swimming and Spa;<br />

• Furnishing of information to the Public;<br />

• Use of community facilities;<br />

15


• Child Care and Old Age Home Services;<br />

• Keeping of Food;<br />

• Keeping of settlement and Accommodation Establishment.<br />

• Financial Disclosure<br />

Gauteng Department of <strong>Local</strong> Government is responsible for drafting and promulgation<br />

costs. Should a peculiar situation exist or arise <strong>Emfuleni</strong> would bear the costs which will<br />

be minimal. There will be constant communication between the Department of <strong>Local</strong><br />

Government, Legal Department and the consultants. The Ward Committees and<br />

community Development Workers (CDW’s) are involved when the by-laws are out for<br />

public comments. The CDW’s were trained on by-laws and the processes leading to<br />

promulgation<br />

3.2.7 Litigation<br />

Litigation may be divided into civil and criminal proceedings either against the municipality<br />

or on behalf of the municipality.<br />

52% of the civil matters have been completed and the 48% are still pending before the<br />

courts of law. Most of the cases have been done internally and this made a savings on<br />

behalf of the municipality.<br />

Challenges<br />

• Suspension of employees for more that three (3) months;<br />

• Non availability of witnesses especially third parties<br />

• Establishing healthy labour relations and EAP (See HR report)<br />

• Legal processes to be undertaken to promulgate by-laws<br />

• Review of the Credit Control and Debt Collection policy and its by-laws as well as the<br />

Standing Orders.<br />

• Take disciplinary action against employees who default on municipal account and<br />

those who have registered a indigents;<br />

• Develop regulations relating to expropriation of properties<br />

• Develop a policy on contract management<br />

• Interdepartmental relationships to avoid unnecessary legal actions against the<br />

municipality.<br />

3.3 HUMAN RESOURCES UNIT ANALYSIS<br />

3.3.1 Introduction<br />

Institutional review cuts across all boarders and impacts on the whole institution. Based<br />

on this assumption the following issues from various departments are highlighted.<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> is firmly committed to make the ethos of Employment Equity<br />

a reality in the institution, through ensuring that all employees are treated equally and<br />

fairly. This would also be complying with the guarantees as stipulated in the Constitution<br />

of the Republic. Employment Equity will ensure that we are able to effectively deliver the<br />

services to our communities, make us more effective and enable us to draw from the<br />

diversity of our employees.<br />

16


3.3.2 Staff Composition<br />

The staff profile as of 1 st October 2008 was standing at 3 242, and will be broken down<br />

in terms race.<br />

Table 3.1: ELM race distribution compared with overall country population<br />

statistics.<br />

Group<br />

Staff<br />

Population (000) 1 %<br />

Complement<br />

Total %<br />

White 335 10,33 4 626 738 9.53<br />

African 2,881 88,86 38 255 165 78.87<br />

Coloured 12 0,37 4 375 527 9.02<br />

Asian 5 0,15 1 244 638 2.57<br />

Disabled 9 0,277<br />

Total 3242 48 502 063 100<br />

Source: ELM employment equity profile, 2008. Community Survey: 2007<br />

90%<br />

Racial Distributions<br />

10%<br />

1%<br />

0%<br />

0%<br />

Figure 3.2 ELMS Racial Distribution<br />

Africans<br />

White<br />

Coloured<br />

Asians<br />

Figure 3.2 depicts the current racial distribution within ELM. The actual figures are as<br />

follows: Africans: 2881; Whites: 335; Coloureds: 12 and Indians: 5 because the Indian<br />

and Coloured complement is so nominal it unfortunately does not account for even 1%.<br />

Coloured equals 0.37% of the total staff complement whilst Indian equals 0.015%.<br />

According to the national demographic we should be targeting 9.02% Coloured<br />

employees and 2.5% Indian employees. It must be noted though that the racial<br />

demographic of <strong>Emfuleni</strong> itself does not comprise a large Coloured and Indian<br />

community. This may be the reason for the above skew. If we are to achieve the national<br />

demographic then ELM would have to search broader and or make a concerted effort in<br />

targeting these sectors of our population to achieve parity.<br />

3.3.3 Performance Management<br />

• The ELM Performance Management System will enforce compliance through<br />

measuring performance and accountability of Senior and Line Managers on<br />

1 Statistics South Africa, Stats in Brief<br />

17


Employment Equity through the submission of quarterly reporting to the<br />

Transformation Forum on EE outputs for each Business Division or Business<br />

Unit. Performance contracts and agreements are concluded and signed by all<br />

S57 employees although one of them resigned end of September 2008.<br />

• The cascading of performance management to level 5 is in various stages of<br />

conclusion and finalization.<br />

• Budget has been approved for 140 licensees on Success Factors.<br />

3.3.4 Recruitment, Selection and Appointments<br />

The ELM is committed to achieve a workforce that will be broadly<br />

• Representative of the South African people and to utilize employment and<br />

personnel management practices that are based on ability, objectivity, fairness and<br />

the need to redress the imbalances of the past.<br />

• Recruitment is not only one of the most important ways in which the organization<br />

meets its human resource capacity requirements; it is also one of the prime<br />

instruments for achieving employment equity. In planning for recruitment, a Human<br />

Resource Plan including (EE plan) must be established and time frames, cost and<br />

staff requirements and employment standards must be determined and validated.<br />

• Selection and consequent appointments must be seen within this ambit of the EE<br />

Act’s definition of suitably qualified (formal qualifications, experience, life skills, prior<br />

learning and potential).<br />

• The ELM Employment Equity and Recruitment and Selection Policy has been<br />

drafted and submitted to the council for approval.<br />

3.3.5 Remuneration and Benefits<br />

Disparities exist between and within certain categories of employees executing the same<br />

complexity of work, performance level and relevant market value. It must be noted that<br />

this is historical and as a result of the amalgamation of 4 councils to form the <strong>Emfuleni</strong><br />

<strong>Local</strong> <strong>Municipality</strong>. Some employees are therefore referred to as Cost to Incumbent<br />

(CTI) as they are paid at ‘peculiar’ salary scales. A salary audit is currently underway<br />

where after we will develop a position on corrective action in consultation with our<br />

unions.<br />

3.4 INFORMATION AND COMMUNICATION TECHNOLOGY<br />

3.4.1 Introduction<br />

All IT Services are rendered to <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> by employees of Sedibeng<br />

District Council on a service level agreement (SLA). A total of nine (8) permanent<br />

employees and (4) four contract appointments are allocated to render the IT Services.<br />

The IT Services rendered to <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> can be divided into the following<br />

categories: Operations, Technical Maintenance, Software Support, Projects and<br />

Administration.<br />

3.4.2 Operations<br />

Staff compliment allocated to this function is: 2 X Operators.<br />

The above staffs are responsible for:<br />

18


• Daily cash updates and backups of servers<br />

• Daily/monthly/yearly operating schedules on Venus system<br />

• Calls logged at the IT. Help desk<br />

o Average 750 calls per month<br />

o IT is experiencing a backlog of 4% on calls logged. This will be caught up<br />

once vacancies have been filled<br />

• Maintaining a data library for backups taken of all servers<br />

• Ensuring that DRP ( Disaster Recovery Plan) procedures are done on daily basis<br />

• Printing of Consumer Accounts ( Water & Electricity, Rates)<br />

o Average of 148,000 accounts per month<br />

3.4.3 Technical<br />

The technical function is responsible for the maintenance on hardware and network<br />

infrastructure. Staff compliment allocated to this function is: 5 X Computer Technicians.<br />

This function involves the following:<br />

• Technical maintenance and installation on hardware and networks that involves<br />

o +/_ 600 PC’s on Network (<strong>Emfuleni</strong>) R51, 000,000.00<br />

o 8 Servers R1, 500,000.00<br />

o 18 Radio Links on Wide Area Network (WAN) R540, 000.00<br />

o 50 networks switches R150, 000.00<br />

o Total Value R 53,190,000.00 replacement cost<br />

• Maintenance on all hardware and installation thereof<br />

• Maintenance and installation of Wide Area Network (WAN) links , <strong>Local</strong> Area<br />

Network (LAN) segments and Radio links<br />

• Programming of cash registers used by libraries, swimming pools.<br />

3.4.4 Software<br />

The software function refers to the system support services and involves the following:<br />

• Maintenance and support on software<br />

• Installation of software<br />

• Controlling access rights of all users to systems<br />

• Legalization of software in use<br />

• Ensuring data security by password controls<br />

• Running of IT. Helpdesk to log calls.<br />

3.4.5 Administration<br />

The administration function is responsible for the following:<br />

• Procurement of Consumables like printer cartridges, toners, memory sticks, etc,<br />

• Procurement of IT related hardware and software.<br />

3.4.6 Challenges<br />

• Training of IT Personnel,<br />

19


• Appointment of skilled staff in vacant positions,<br />

• Ensure good governance and institutional building by:<br />

o Creation of a stable IT governance platform, implementing and defining IT<br />

usage policies, procedures and standards,<br />

o Providing a secure IT Environment by enhancing data security,<br />

developing and implementing DRP (disaster recovery program) and<br />

contingency plans, and legalizing software.<br />

3.5 Communication Unit<br />

3.5.1 Introduction<br />

The <strong>Emfuleni</strong> <strong>Municipality</strong> has adopted a Five year strategic plan which has about eight<br />

(8) focus areas. One of the focus areas is on creating a culture of effective<br />

communication. On 13 March 2008, the <strong>Emfuleni</strong> Council approved its new<br />

organisational structure which also made provision for a bigger communication and<br />

marketing unit. This move signals the importance with which the municipality views<br />

communication and marketing. Therefore, linked to the above the <strong>Municipality</strong> has<br />

moved to appoint a manager to take responsibility for this function with effect from 14<br />

March 2008.<br />

3.5.2 Communication and Marketing strategy<br />

• The municipality does have a communication strategy that still needs to be<br />

reviewed. However, The ELM Communication strategy will be developed<br />

internally but also working with our national and provincial counterparts in<br />

government communication sector.<br />

• It is recommended that the strategy be developed with the assistance of the<br />

Resolve Group.<br />

3.5.3 Media Monitoring and Analysis/media liaison<br />

The terms of reference for media monitoring services have been finalised and awaiting<br />

approval. This service is going to assist the <strong>Municipality</strong> to track coverage of its<br />

performance and programmes by the media and assist in communication planning and<br />

implementation. For the interim period we follow coverage especially in the print media<br />

and respond accordingly to reports that are featured in the media.<br />

3.5.4 Media Policy<br />

The <strong>Emfuleni</strong> <strong>Municipality</strong> does not have a media policy. The non existence of this policy<br />

provides fertile grounds for all manner of unauthorised and sporadic media<br />

engagements by various officials in the <strong>Municipality</strong>. Instances of such activities have<br />

been picked up the by the Communication Unit. The media policy will assist in ensuring<br />

structured engagements with the media as an important role player in the affairs of the<br />

<strong>Municipality</strong>.<br />

3.5.5 Publications<br />

The internal publication is produced on a monthly basis. Our analysis of the internal<br />

publication is that it does not enable the organization to communicate its plans,<br />

programmes and policies effectively in the current form. There is a need that the current<br />

20


newsletter should serve to inform, educate and entertain staff members on whole range<br />

of issues.<br />

The external publication does not exist at the moment. There was an external newsletter<br />

(the Voice of <strong>Emfuleni</strong>) that was circulation in the past but was discontinued for unknown<br />

reasons. We are considering reviving this publication which will provide the municipality<br />

with a platform to communicate with its external stakeholders.<br />

3.5.6 Electronic media (website and intranet)<br />

The <strong>Municipality</strong> does have a vibrant website which provides information on various<br />

issues including structures of the municipality, office bearers, events, important<br />

documents, tourism attractions and vacancies. ELM is optimising the website by<br />

incorporating the news service covering all our important issues. The only challenge in<br />

this regard is resources in terms of staff and equipment e.g. cameras. The <strong>Municipality</strong><br />

will have to work on introducing intranet especially for employees, where they can<br />

access policies, forms and other important tools for performing their duties.<br />

The communication unit will engage all relevant role players including information<br />

technology division and all user departments.<br />

3.5.7 Corporate identity manual<br />

The Communication Unit will be leading a process of developing a corporate identity<br />

manual for the <strong>Municipality</strong>. An organisation as big as <strong>Emfuleni</strong> will have to develop such<br />

a manual to guide departments on how to apply the logo of the <strong>Municipality</strong> in various<br />

applications including but not limited to the following:<br />

• Letterheads<br />

• Greeting cards<br />

• All stationary items<br />

• Use of corporate colors consistently on all promotional and branding material<br />

• Council vehicles<br />

• Uniform<br />

• Office<br />

• Outdoor advertising<br />

External service providers would have to be utilized since the municipality does not have<br />

in-house graphic designer for to perform this function.<br />

3.5.8 Communication forums<br />

The communication unit has embarked on a process of starting internal and external<br />

forums to ensure effective communication. Guidelines adopted by cabinet on local<br />

government communication make these structures a prerequisite for effective<br />

communication especially in relation to external communication. Use of ward committees<br />

and CDWs as important role players in government communications is encouraged.<br />

3.5.9 Capacity problems<br />

The communication unit only has four staff members in its staff establishment. This<br />

makes it difficult to assist a municipality as huge as <strong>Emfuleni</strong> to carry out its tasks.<br />

Critical positions in the new structure would have to be filled as a matter of urgency.<br />

21


3.5.10 Disability Desk<br />

The desk has been established in the executive mayor office. ELM has formed<br />

partnership with at least thirty disability organizations that are operating in <strong>Emfuleni</strong><br />

<strong>Municipality</strong> Jurisdiction. The desk promotes the employment of disability people in all<br />

levels of the municipality.<br />

Challenges<br />

• Unemployment<br />

• Sustainable, accessibility and affordable community facilities and services to<br />

people with disability<br />

• Ensure that all providers of construction projects employ people with disability<br />

• Ensure that disability issues are mainstream in the municipality strategic planning<br />

process<br />

• Establish mechanism to link and liaise with civil society<br />

3.5.11 Gender Desk<br />

The desk has been established in the office of the Executive Mayor. The Desk is<br />

responsible for the following:<br />

• Implementation of the 50/50 percent National resolution<br />

• Eradicating poverty through Economic Empowerment initiatives<br />

• Focus on Government and other stake holders projects and Programmes<br />

• Deepening women’s participation in governance Diversity , tolerance and men’s<br />

role in the <strong>Local</strong> Government Gender Agenda<br />

• The strengthening of the section 79 of the Municipal Act<br />

• Human Rights Mainstreaming as an approach to accelerate Gender Equality<br />

3.5.12 HIV/AIDS Desk<br />

The primary goal of the desk is to reduce the number of new infections and to reduce the<br />

impact of the epidemic on individuals, families and communities.<br />

• Mobile clinic to the value of R60 000 is bought VNG International through<br />

Eindhoven <strong>Municipality</strong> for <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> to be used in Evaton<br />

West.<br />

• There are still negotiating regarding the purchase of another mobile clinic for<br />

Bophelong and semi rural areas of ward 25.<br />

• On the 01 October 2008 ELM established a partnership with Bophelo Impilo<br />

project (PPP), Clinix, Asselo, Mittal Steel and Sedibeng <strong>Municipality</strong>. The project<br />

was piloted at ward 17, 36 and 02 and 45 volunteers are now working.<br />

The following projects are ongoing and funded by Netherlands <strong>Municipality</strong>:<br />

• Training of HIV/AIDS Intersectoral Forum in project management and<br />

communications at Vaal University of Technology<br />

• Pilot project for Intersectoral Forum to establish a one stop shop for HIV and<br />

AIDS.<br />

22


• Training of grade 10 students in Evaton West and Bophelong surrounding on<br />

Communication tools and Empowerment course for behavioral change.<br />

3.9 Challenges<br />

Human Recourses capacity (Appointment of HIV/AIDS workplace coordinator)<br />

Establishment of <strong>Emfuleni</strong> <strong>Local</strong> AIDS Council<br />

Erection of Billboards with HIV/AIDS messages in ELM areas<br />

Commitment of Senior Management from different department of ELM in the fight<br />

against<br />

HIV/AIDS<br />

Main streaming HIV/AIDS<br />

Establishment of Interdepartmental HIV/AIDS Committee<br />

It is difficult for the <strong>Municipality</strong> to access programmes and projects from other sector<br />

departments such as Health, Education, Agriculture etc. (Provincial and National).<br />

23


CHAPTER 4<br />

4.1 SOCIO – ECONOMIC PR<strong>OF</strong>ILE & DEVELOPMENT<br />

4.1.1 Guiding Principles for LED<br />

LED is characterized by the following guiding principles<br />

LED aims at creating favourable locational factors, that is, reducing the cost of doing<br />

business within a locality. This includes the provision of infrastructure, training of<br />

workers, business mindedness and the efficiency of local administration<br />

It aims at promoting business. These can be existing business, start-ups or external<br />

business coming into the area. It is also about promoting and supporting spin-offs and<br />

sub-contracting, attracting investment and considering franchising as a source of new<br />

local business<br />

It aims at making better use of locally available resources and skills and maximizing<br />

available opportunities<br />

It aims at promoting local ownership, community involvement, leadership and jointdecision<br />

making.<br />

Beyond this and in accordance with this policy thrust <strong>Emfuleni</strong> should actively provide<br />

support to local enterprises by linking them up with the relevant provincial and national<br />

agencies in the state tasked with this responsibility in the different economic sectors<br />

4.1.2 Employment<br />

Statistics SA indicates that <strong>Emfuleni</strong> had a workforce of 463 642 economically active<br />

people. It is estimated that 33% of the workforce is employed whilst 30% is unemployed.<br />

The remainder 37% is not economically active, which means that it is not actively<br />

seeking jobs. This means that poverty levels might be high and the dependency ratio is<br />

high within the municipality, which hampers the ability of the population to save and/or<br />

engage in other entrepreneurship activities.<br />

Figure 4.1<br />

37%<br />

Employment Profile<br />

30%<br />

33%<br />

Employed Unemployed Not Economic Active<br />

24


Unemployed - it refers to people who are economic active (between 16 -65 ages) and<br />

currently looking for job opportunity.<br />

Not Economic Active – refers to people who are employable or economic active but not<br />

looking for job opportunity.<br />

The employment pattern is largely attributed to the past economic development that had<br />

been accompanied by the creation of corresponding black labour force reservoirs on the<br />

urban boundaries. The oldest township Evaton was created in the beginning of the 20th<br />

Century. During apartheid Sharpeville, Sebokeng, Bophelong and Boipatong in the<br />

Vanderbijlpark area were established, while Zamdela and Refengotso, near Sasolburg<br />

were only established in the 1970’s. Extensive road systems link the mentioned towns<br />

with the sources of labour, resources, and with the markets within the Greater<br />

Johannesburg area.<br />

Recent data on the distribution of the supply and demand of labour between the towns<br />

and townships of <strong>Emfuleni</strong> show that the three towns with 21.3 per cent of the population<br />

concentrate 35 per cent of the employed. The five main townships with 78.7 per cent of<br />

the labour force have only 65 per cent of the employed, which includes those working in<br />

the towns (63.000), outside <strong>Emfuleni</strong> (17.000) and in the informal sector (28.000).<br />

This means that only one of every seven economical active are employed in the same<br />

township. The disequilibrium becomes enormous when we look at the distribution of<br />

formal economic activities. These are for more than 99 per cent concentrated in the<br />

three towns where only one fifth of the Economically Active Population (EAP) lives.<br />

Detailed information on turnover of registered businesses for the period 1993-98, shows<br />

a strong decline on employment of seven townships from 0.81 to 0.44 percent in post<br />

apartheid South Africa. In the three towns there has been a small shift in economic<br />

activities from Vanderbijlpark to Vereeniging and Meyerton. Nevertheless, most<br />

townships were worse off even in nominal terms. We observe the strongest declines in<br />

Evaton, Sharpeville and Sebokeng with a big concentration of unemployed.<br />

4.1.3. Economic Sector Analysis<br />

4.1.3.1 Primary Sector<br />

The primary economic sector consists of two sub-sectors, namely Agriculture and<br />

Mining. Agriculture's relative contribution to the GGP of <strong>Emfuleni</strong> decreased from 1.7<br />

per cent in 1996 to 1.5 per cent in 2003. The average annual growth rate for the sector<br />

from 1996 to 2003 was 0.6% at constant prices. The agricultural sector offers a<br />

relatively small degree of economic activity in <strong>Emfuleni</strong>. Mining contributes only 0.2<br />

percent to GGP of <strong>Emfuleni</strong>. The contribution of the mining sector to the GGP of<br />

<strong>Emfuleni</strong> declined from 0.5 per cent in 1996 to 0.2 per cent in 2003. The average growth<br />

rate from 1996 to 2003 was -13.0% per annum at constant prices.<br />

4.1.3.2 Manufacturing<br />

<strong>Emfuleni</strong>’s manufacturing sector is largely dominated by metals, metal products, and<br />

machinery and equipment industries. The dominant company is iron and steel and is<br />

considered to be the biggest steel sector agglomeration within the country.<br />

25


The metals and metal products industry has undergone major restructuring in the past<br />

few years, resulting in job shedding. It has been growing at a relatively low 1.2% per<br />

annum. The petrochemical industry is the second major manufacturing sub sector.<br />

Unlike the steel industry, it has been growing at a relatively fast pace between 2000 and<br />

2006.<br />

The relative contribution of Manufacturing towards the GGP of <strong>Emfuleni</strong> decreased<br />

slightly from 39.5 per cent in 1996 to 38.7 per cent in 2003. The manufacturing sector<br />

can be regarded as the dominant economic activity in <strong>Emfuleni</strong>.<br />

In 1998 a total of 8530 registered companies and public institutions were active in the<br />

<strong>Emfuleni</strong> area, of which about 300 (3.5%) are classified as big ones according to the<br />

Ministry of Economic Affairs. All these and more than 90 per cent of the smaller firms<br />

are located in towns. The big firms control the basic metal and metal products<br />

industries, machine industry, chemicals, energy, non-metals, but also banking, retail and<br />

wholesale trade.<br />

Ten giant enterprises dominate the economy of <strong>Emfuleni</strong>, among which three basic<br />

metal industries, two metal products companies, one energy and three financial and<br />

(retail) trade companies (Table 2). They generate more than 40 per cent of the turnover<br />

and more than 30 per cent of the total wage sum of the area. When the Sasolburg area<br />

is included one should add Sasol, the world’s biggest coal based petrochemical<br />

company.<br />

The region is clearly specialized in the core sectors of the South African so-called<br />

mineral energy complex (MEC): iron and steel and nonferrous basic metals, energy, a<br />

strong financial sector and specific for the area, the metal products industry. Most of<br />

these industries are important input providers to the rest of the country and export<br />

markets and some may even be considered as world market role players. Increasing<br />

price competitiveness of these industries and outward orientation had not created<br />

sufficient linkages with other sectors and could therefore not generate sustainable<br />

growth.<br />

<strong>Emfuleni</strong> has a wide range of industrial activities. The industrial activities are recorded in<br />

the next table with their share in the manufacturing sector's GGP contribution.<br />

Table 4.1 Industrial activities, <strong>Emfuleni</strong> (2003)<br />

Sector % share in Manufacturing’s<br />

GGP contribution<br />

2000-2006<br />

growth<br />

rate<br />

Food, beverages and tobacco 2.4% 0.1%<br />

Textiles, clothing and leather goods 0.6% -0.1%<br />

Wood and paper; publishing and<br />

printing<br />

-0.8%<br />

Petroleum products, chemicals, rubber<br />

and plastic<br />

8.0% 3.1%<br />

Other non-metallic mineral products 3.2% 3.0%<br />

Metal, metal products and machinery 75.0% 1.2%<br />

Electrical machinery and apparatus 2.4% 0.4%<br />

Radio, TV, instruments and clocks 0.8%<br />

Transport equipment 2.5% 3.6%<br />

26


Sector % share in Manufacturing’s<br />

GGP contribution<br />

2000-2006<br />

growth<br />

rate<br />

Furniture and other manufacturing 3.2% 0.1%<br />

Manufacturing sector (R’ml) 5 386.4 1.3%<br />

Source: Urban-Eco calculations based on Quantec data, 2006<br />

The table above illustrate that the economy in <strong>Emfuleni</strong> is highly dependant on<br />

manufacturing.<br />

4.1.3.3 Arcelor Mittal Performance<br />

Arcelor Mittal previously known as Mittal Steel. It registered record earnings of R4 541m<br />

(1 019c per share). This is as a result of international steel prices that attained all time<br />

high levels, strong domestic demand growth and the fact that cost escalations were<br />

successfully contained. Growths in the domestic steel sales volume were at 22% in<br />

2004. As of 2000 there has been a very rapid growth within the global market for steel in<br />

as far as supply and demand is concerned with a very close correlation. However it is<br />

projected that in 2007, the demand for steel globally will be fractionally less than the<br />

supply for the same year. The Vanderbijlpark and Long Products plants registered an<br />

increase in their operating profit of 89% and 128% respectively from the previous year<br />

(Mittal Steel, 2005). It does not seem that despite this financial success, more<br />

permanent jobs will be created, instead it could lead to shedding of jobs, but on the other<br />

hand it will definitely create short term jobs and benefit the <strong>Emfuleni</strong> economy in terms of<br />

procurement by local businesses. However, the impact of this still needs to be<br />

determined.<br />

4.1.3.4 Secondary Sector<br />

Secondary economic activities in <strong>Emfuleni</strong> consist of three sub-sectors, namely<br />

Manufacturing, Electricity/Gas/Water and Construction. Their contributions, growth rates<br />

and constituents are discussed.<br />

4.1.3.5 Tertiary Sector<br />

Tertiary sector activities consist of a number of sectors such as Trade, Transport,<br />

Financing, Services (including government services) and Tourism & Entertainment.<br />

Combined, this sector registered a GGP contribution of 50.1% in 1996 to <strong>Emfuleni</strong>.<br />

By 2003, the figure was 52.5%. The Transport and Finances sectors experienced an<br />

above average annual growth between 1996 and 2003 of 8.6% and 4.4% respectively<br />

(constant prices). The average annual growth for the whole <strong>Emfuleni</strong> economy was 3.2%<br />

(constant prices).<br />

For Tourism and Entertainment only the 2003 figure was estimated. This sector<br />

presently contributes only a relatively small amount to the GGP of <strong>Emfuleni</strong>.<br />

Below is a table with Average annual growth (%, Constant 1995 prices) for the year<br />

2003.<br />

27


4.1.3.6 Economic Performance<br />

Table 4.2 GGP and Growth Rates<br />

Area 2006 (constant 2000 prices) Growth Rate (%)<br />

<strong>Emfuleni</strong> <strong>Local</strong> Rand Value (R’m) % contribution 1995-2000 2000-2006<br />

<strong>Municipality</strong> 12 784 77.0% 0.4% 1.8%<br />

Source: Urban-Eco calculations based on Quantec data, 2006<br />

Economic Growth of the municipality had been at a lower pace as compared to the<br />

targets set by the Gauteng Growth and Development Strategy for the district.<br />

Table 4.3 Projected GGP and Growth Rates<br />

Area 2006 (constant 2000 prices) Growth Rate (%)<br />

<strong>Emfuleni</strong> <strong>Local</strong> Rand Value Rand Value 2006-2011 2011-2016<br />

<strong>Municipality</strong> (R’m) 2011 (R’m) 2016<br />

12 784 77.0% 1.1% 1.1%<br />

Source: Urban-Eco calculations based on Quantec data, 2006<br />

It is important to note that economic trends presented above do not accommodate any<br />

unpredictable scenarios. It is based on historical realistic economic trends of the<br />

municipality. The economy of <strong>Emfuleni</strong> is predicted by Urban-Econ to be stagnant for the<br />

next ten years and more.<br />

4.1.3.7 Growth<br />

The <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> consists of two major economic nodes namely<br />

Vereeniging registered a 2.6% GDP and Vanderbijlpark a GDP of 2.2% for 2004 and<br />

Sedibeng 2.5% for 2004. The total GDP for <strong>Emfuleni</strong> in 2003 has been higher than that<br />

of Gauteng and national. It should be noted that while it is indicated that Vereeniging and<br />

Vanderbijlpark are the two main economic nodes, the statistics provided are of that of<br />

the magisterial districts of Vereeniging and Vanderbijlpark, Meyerton for an example is<br />

part of Vereeniging magisterial district. Below is a chart of annual growth rates (GDP-R)<br />

as of 2000 till 2004:<br />

Figure 4.1<br />

Average annual growth<br />

(Constant 2000 Prices)<br />

10.0%<br />

-2.0%<br />

Gross Domestic Product by Region (GDP-R)<br />

8.0%<br />

6.0%<br />

4.0%<br />

2.0%<br />

0.0%<br />

2000 2001 2002 2003 2004<br />

Year<br />

Source: Ricon (Global Insight), 2005<br />

Gauteng<br />

Sedibeng DM<br />

Vereeniging<br />

Vanderbijlpark<br />

28


The <strong>Emfuleni</strong> combined Gross Domestic Product per Region (Current Price R1000) for<br />

2004 was estimated at R23,445,216 and therefore contributed about 4.6% to the<br />

Gauteng GDP-R in 2004 and contributed an estimated 93.8% to the Sedibeng economy<br />

based on GDP-R for the same year.<br />

The table below reflects on the annual personal income per capita as per racial<br />

composition for the year 2004.<br />

Table 4.6<br />

Black White Coloured Asian Total<br />

Gauteng 81,740 271,515 159,015 230,070 130,982<br />

Sedibeng 40,606 147,011 83,156 166,552 58,029<br />

Vereeniging 49,487 161,829 90,870 166,739 72,618<br />

Vanderbijlpark 35,293 128,219 54,250 47,329<br />

The average household income for 2003 in <strong>Emfuleni</strong> was estimated at R3, 400 per<br />

household per month (Slabbert 2003). For 1999, this figure was estimated at R3, 083<br />

per month (Slabbert & Mokoena 1999). The average formal wage per worker was<br />

R4, 643 per worker per month for 2001.<br />

The average wage per formal sector worker increased substantially during the 1990s.<br />

The reduced number of workers in <strong>Emfuleni</strong> therefore earns higher nominal wages on<br />

average.<br />

A reason for this higher average wage per worker can be labour union actions, resulting<br />

in higher wages for their members.<br />

However, as firms are cutting back on labour, fewer workers have employment in<br />

<strong>Emfuleni</strong>. The result of this is that a rather skewed distribution in personal income exists<br />

in <strong>Emfuleni</strong>, showing that a relatively large group of the community earned a relatively<br />

small portion of the total income in 2000 (Slabbert & Mokoena 1999 updated). About 80<br />

percent of the less-affluent households earn 40 percent of the total income in <strong>Emfuleni</strong>.<br />

About 20 percent of the more affluent households earn 60 percent of the total income in<br />

<strong>Emfuleni</strong>. The table below depicts remuneration trends in more detail.<br />

Total remuneration per sector for <strong>Emfuleni</strong><br />

Table 4.7<br />

Sector 2006 (constant 2000 prices) Growth Rate (%)<br />

Rand Value %<br />

% 1995- 2000contribution<br />

contribution 2000 2006<br />

to local to Sedibeng<br />

economy economy<br />

Agriculture 25 549 467 0.2% 41.1% -5.5% -6.1%<br />

Mining 141 748 373 1.1% 67.4% -2.2% -6.9%<br />

Manufacturing 5 386 404 126 42.1% 82.7% 0.2% 1.3%<br />

Electricity/<br />

Gas/Water<br />

381 630 466 3.0% 71.8% 0.6% 0.9%<br />

Construction 373 813 857 2.9% 57.6% -0.5% 3.8%<br />

29


Sector 2006 (constant 2000 prices) Growth Rate (%)<br />

Rand Value %<br />

contribution<br />

to local<br />

economy<br />

%<br />

contribution<br />

to Sedibeng<br />

economy<br />

1995-<br />

2000<br />

2000-<br />

2006<br />

Trade 1 775 855 669 13.9% 70.8% 3.5% 3.3%<br />

Transport 817 481 945 6.4% 75.9% 5.4% 5.1%<br />

Financing 1 264 330 038 9.9% 66.1% 6.1% 5.6%<br />

Community 2 617 169 794 20.% 83.7% -2.0% -0.1%<br />

Services<br />

TOTAL 12 783 983 734 100% 77.0% 0.7% 1.8%<br />

Source: Urban-Eco calculations based on Quantec data, 2006<br />

Table 4.8<br />

Economic sector Employment (number) Per cent<br />

Agriculture 2,904 1.9<br />

Mining 1,230 0.8<br />

Manufacturing 34,122 22.2<br />

Electricity / Gas / Water 2,367 1.5<br />

Construction 7,812 5.1<br />

Trade 25,717 16.7<br />

Transport 7,277 4.7<br />

Financing 13,228 8.6<br />

Services & Other 29,105 18.9<br />

Tourism & Entertainment 2,176 1.4<br />

Private households 17,124 11.1<br />

Undetermined 10,580 6.9<br />

TOTAL 153,657 100.0<br />

Source: Municipal Demarcation Board 2003 and Slabbert & Slabbert 2002a:106 for<br />

calculations of estimates for Tourism & Entertainment. Sources of Income per Economic<br />

Sector<br />

4.1.3.8 The role of informal sector in <strong>Emfuleni</strong><br />

A total of 28 business areas in 9 townships were surveyed in <strong>Emfuleni</strong>, and the target<br />

areas were Bophelong Extensions and Boipatong taxi rank where 115 surveys were<br />

conducted. Of these 88% were informal businesses and 12% were registered small<br />

businesses.<br />

A total of 70 surveys were administered in Adams Road, Old Golden Highway, and<br />

Evaton West Extension 11, comprising 67% informal businesses and 33% formal<br />

businesses. Along Falcon Road, 32 businesses were surveyed of which 72% were<br />

informal and 28% formal.<br />

In Sebokeng, targeted areas comprised of Zones 4, 10, 12, 13, and 7 (formal housing)<br />

with a total of 158 surveys (58% informal businesses and 42% formal). A total of 63<br />

30


surveys were conducted in the Dubula and Seeiso Street areas of Sharpeville (the result<br />

was 100% informal businesses). In Phase 1 of Tshepiso, 41 businesses were surveyed<br />

(97% informal and 3% formal).<br />

In Vanderbijlpark, <strong>Emfuleni</strong>’s industrial area, 68 businesses were surveyed in D.F. Malan<br />

Drive and at the CDB Taxi Rank and The Mall (the result was 100% informal)<br />

Finally a total of 344 businesses were surveyed in 8 locations within Vereeniging, the<br />

central business district (CBD) for <strong>Emfuleni</strong>. These locations included Taxido Junction,<br />

Voortrekker Road, Union Street, Leslie Street, Merimman Avenue, Senator Markslaan,<br />

Market Avenue and Beaconsfield Avenue. These areas were represented by 45%<br />

informal businesses and 55% formal businesses.<br />

4.1.3.9 Informal trading<br />

Street and informal traders fall within the informal economy sector.<br />

This trade normally takes place at strategic points with heavy human traffic - along main<br />

roads, streets, parks, pavements, within shopping centers, and at prominent corners of<br />

streets and roads where traders are visible to pedestrians and motorists. The traders use<br />

different structures, including mats, gunny bags, tables, racks, wheel barrows,<br />

handcarts, and bicycle seats to display their goods. An advanced but insignificant group<br />

of the traders construct temporary shades with stands for displaying their goods.<br />

4.1.3.10 Challenges<br />

The greatest challenge facing street and informal traders in <strong>Emfuleni</strong> is with regards to<br />

site of operation. Most of the spaces traders occupy, especially in the townships, are<br />

considered illegal since the spaces have not been set aside for trade. There are various<br />

conflicts relating to their sites of operation.<br />

A major conflict often arises when the vendors are required to move in order to give way<br />

for planned development. Sometimes traders find themselves in conflict with formal shop<br />

owners and landlords who contend that the traders infringe on their businesses and/or<br />

premises. In the townships in particular, street and informal traders are also<br />

disadvantaged with regard to security, transport and municipal services. A secure<br />

working environment is a pre-requisite for any type of business. Security is a major<br />

concern for many people engaged in economic activities on streets. A study of cities in<br />

South Africa has noted that an insecure environment results in loss of customers,<br />

frightens tourists, cripples business, reduces incomes, and generally interferes with<br />

trading.<br />

Most vendors find it difficult to transport their commodities from their homes and markets<br />

to their trading sites.<br />

This is because most public transport systems do not cover the areas where vendors<br />

live, and in cases where they do, transport becomes very costly to vendors. This forces<br />

vendors to use an alternative transport. Water and sanitation is not easily accessible to<br />

vendors and consumers. This is especially true with “car-washing” businesses that has<br />

become very popular in the townships.<br />

31


Some of the initiatives that LED Departments has embarked upon to try to address some<br />

of the above-mentioned challenges include:<br />

• The development of a comprehensive and user-friendly waiting list template for new<br />

applicants.<br />

• Identify and demarcate new stands to be allocated to applicants in the waiting list.<br />

• Develop and regularly update Data- base of informal traders that will contain<br />

information about the type of goods and/ or services that they offer, their demarcated<br />

stands as well as their locations. This will assist council to identify criminals who<br />

sometimes hide behind informal trading.<br />

• Establishment of Informal trading committees in all areas where informal trading<br />

operates. Whereas, this might be a challenge to achieve in the short to medium term,<br />

in the long run the benefits will be huge for council in terms of proper management of<br />

this sector and its growth.<br />

• Removal of illegal traders<br />

• Identification of a special place for traders (mostly women) who are running “minisalons<br />

in the CBD’s.<br />

4.1.3.11 Challenges for informal trading<br />

• There is a need to provide training to informal traders to enable them to manage their<br />

businesses properly and to grow their businesses. This training will also have to<br />

continually include training on municipal By-laws.<br />

• Storage facilities (Stalls must be erected) for the hawkers to store their goods after<br />

their trading hours<br />

• Ablution facilities are required because the public toilets that are used are not<br />

properly managed and are inadequate because of the growing numbers of the<br />

hawkers in the Vanderbijlpark CBD.<br />

• A smart card system to be introduced to outsmart the current permit system usage. A<br />

user-friendly smart –card system will enable informal traders to pay their rentals at<br />

the banks even during Saturdays so that they do not have to wait for office hours<br />

before they pay for their rentals.<br />

• Declare informal trading sections in the townships as business centers and provision<br />

of basic municipal services in and around those areas.<br />

4.1.3.12 Business development, retention and growth<br />

Business retention and expansion is a municipal-based economic development strategy<br />

with a focus on “taking care of, nurturing and supporting” businesses already existing in<br />

the municipality. Business Retention, growth and expansion works to improve the<br />

competitiveness of local businesses by identifying and addressing their needs and<br />

concerns and building on business development opportunities. This is crucial to the<br />

sustained viability of communities since businesses that stay competitive are more likely<br />

to remain and expand in the community.<br />

32


4.1.3.13 Strategy for business retention and growth<br />

Urban Development Zone Tax Incentive (UDZ). This is a national government sponsored<br />

programme to encourage business to stay within demarcated municipal areas.<br />

The following are projects that LED Department is conducting within demarcated<br />

Vereeniging area.<br />

• To continuously sensitize all qualifying business within demarcated area in<br />

Vereeniging. These businesses are within the urban development zone so they<br />

therefore play a leading role in the CBD renewal programme.<br />

• Monitoring of qualified Erf owners in the Urban Development Zone until March 2014<br />

when the programme will be closing.<br />

• Annual monitoring of businesses within the demarcated areas to check issues of<br />

compliance. As part of CBD renewal, businesses are supposed to be renovated and<br />

later be reimbursed by the state, hence monitoring becomes crucial.<br />

The Regeneration of Vanderbijlpark CBD<br />

This project is undertaken with the view of ensuring that businesses located in<br />

Vanderbiljpark are sustainable and they grow in order to assist in employment creation<br />

and poverty alleviation. The following are key projects in that regard.<br />

• To conduct a traffic impact assessment study and to formulate new projects based<br />

on the findings of the study. (Provision was made on the Capital Budget for the<br />

above-mentioned project.)<br />

4.1.3.14 Poverty alleviation in the townships<br />

The following are relieve or poverty alleviation projects earmarked for communities living<br />

in the previously disadvantaged areas.<br />

4.1.3.14.1 Hydro-phonics Revival<br />

• Identify beneficiaries for 3 Hydro-phonics. These hydro-phonics are situated in<br />

Sebokeng Zone 7, 10 and Tshepiso. Their conditions are unsatisfactory however<br />

the ELM has come up with a plan to revitalize them.<br />

• Amalgamate all three projects into one project. Poor soil conditions in Tshepiso is<br />

one of the factors to amalgamate.<br />

4.1.3.14.2 Co-operatives Development Strategy<br />

1. Compile a comprehensive Co-operative database<br />

2. Organize co-operatives training sessions public stakeholder participation<br />

3. Establish local co-operatives body.<br />

4. Customize National Co-operatives Strategy into <strong>Emfuleni</strong>’s context.<br />

4.1.3.14.3 Communal farming – Livestock<br />

1. Identify Council Plots and farms to place the livestock<br />

33


4.1.3.14.4 Poverty Alleviation Project at Vereeniging Clinic<br />

1. Identify beneficiaries<br />

2. Develop a community garden<br />

3. Assist Sewing project with application for funds and resources<br />

Home food stead gardens<br />

1. Develop gardens at Vereeniging Clinic and Evaton West<br />

4.1.3.14.5 SWOT analysis<br />

INTERNAL<br />

Strength Weaknesses<br />

Steel & manufacturing industry<br />

Historical tourism<br />

Vaal river<br />

Economically active population<br />

Proximity to JHB<br />

7 th<br />

High unemployment rate<br />

Large uneducated population<br />

Low professional workforce<br />

Disintegrated settlements<br />

High poverty levels<br />

GVA contributor in the country Lack of coherence on policies and<br />

strategies<br />

EXTERNAL<br />

Opportunity Threat<br />

Gauteng Global City Region concept Poor policy and strategic alignment<br />

Sedibeng Growth & Developmentwithin<br />

the district and the province<br />

Strategy<br />

Lack of appropriate skills<br />

Industrial expansion<br />

Lack of labour intensive methods of<br />

Beneficiation of steel industry production<br />

Proximity to metros<br />

FDI trends biased towards the east<br />

Historical & environmental tourism<br />

In land port<br />

Gauteng industrial hub<br />

and other south American countries<br />

4.1.3.14.6 Constraints in Economic Growth<br />

Lack of common economic data set has proved to be problematic and unavailability of<br />

such information has a detrimental effect on <strong>Local</strong> Economic Development. Economic<br />

growth has been slower than population growth which has resulted in a decrease in<br />

average standard of living.<br />

The level of socio-economic disparity between population groups is high with pockets of<br />

severe poverty to be found.<br />

Owing to its relevant distance away from the Gauteng Core, the municipality has to<br />

compete harder with more centrally located areas for new investment.<br />

Economic growth areas are not directed towards Historically Disadvantaged Areas<br />

(Sebokeng, Boipatong, Bophelong, Sharpeville, etc).<br />

34


CHAPTER 5<br />

5.1 ELECTRICITY<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> provides municipal services directly to the community of<br />

<strong>Emfuleni</strong>. The <strong>Municipality</strong> is licensed to provide electricity mainly in the Vanderbijlpark,<br />

Bophelong, Boipatong, Ironsyde, Eatonsyde, Roshnee, Rust ter Vaal and Vereeniging<br />

areas whilst Eskom has been licensed to provide electricity in the remaining areas.<br />

Free basic electricity (FBE) was provided to approximately 9 000 consumers, on<br />

average, per month (4 500 by the municipality and 4 500 by Eskom) within the <strong>Emfuleni</strong><br />

municipal area. Free Basic Electricity of 50kWh/month is provided to registered<br />

indigents. Eskom invoices the <strong>Municipality</strong> on a monthly basis for all Free Basic<br />

Electricity issued by them in accordance with a supply agreement.<br />

5.1.1 Achievements<br />

During 2007/08 projects to the amount of approximately R18m (for the electricity<br />

network) and R3.3m (for public lighting) were approved by the Council and executed by<br />

the Electricity Department to improve and sustain the delivery services to the community.<br />

The projects that were executed and either completed 100% or rolled over partially to the<br />

2008/09 financial year were as follows:<br />

• Upgrading of 11kV networks R5 500 000<br />

• Replacement of vandalized overhead copper distribution lines (approximately 30<br />

000m) with insulated bundle conductor (R3 500 000)<br />

• Drafting of electricity infrastructure master plan R600 000<br />

• Reinstatement of low voltage network in Riverbend Gardens R1 400 000<br />

• New electricity connections and unforeseen network expansions (R2 700 000)<br />

• Upgrading of rural 11kV network R377 000<br />

• Repair/replacement of various 11kV cables R3 300 000<br />

• Professional fees for project design R730 000<br />

• Installation of high mast lighting R3 300 000<br />

All of the above expenditure was funded by <strong>Emfuleni</strong>, inclusive of an amount of<br />

approximately R4 000 000 which was part of the Restructuring Grant.<br />

Electricity purchases for the 2007/08 financial year amounted to R408 000 000 for 2 235<br />

801 000kWh.<br />

This was an increase in energy purchases of approximately 0,5% on that for 2006/07. A<br />

reduction in consumption has also been experienced since the advent of load shedding<br />

by Eskom. The electricity is sold to industrial/commercial/agricultural and domestic<br />

customers.<br />

Approximately 78% of the electricity is sold to industrial and commercial customers and<br />

the remaining 22% is sold to domestic and agricultural customers and for the<br />

municipality’s own use. Energy losses during this financial year amounted to<br />

approximately 10,6%.<br />

The effective delivery of services by the Electricity Department was continuously<br />

hampered by the continuing flood of theft of electricity infrastructure.<br />

35


Valuable time and money has to be directed on a daily basis to rectify problems caused<br />

by this theft. Theft on live networks often leads to secondary damages of which the<br />

repair cost has to fund from the existing maintenance budgets.<br />

5.1.2 Level of Services<br />

There is no backlog in the provision of service connections (electricity) to all proclaimed<br />

and developed areas. Applications for electricity connections are processed as they are<br />

received and the necessary connection fees paid. All electricity customers receive a full<br />

service but it is differentiated in terms of connection size in relation to connection fees<br />

paid. A large percentage of customers are metered via prepaid meters, which facilitates<br />

the management of usage by customers. The level of service (20ampere connections)<br />

funded by DME via the electrification funding is the cause of much equipment failure due<br />

to overloading, a fact which was even more experienced during the past financial year<br />

when a number of transformers failed due to continuous overloading. It is felt that DME<br />

should increase its funding per connection to allow a connection size of at least 40<br />

ampere to prevent overloading problems.<br />

5.1.3 Services backlog<br />

Due to the lack of financial resources over the past number of years a backlog in repair<br />

and maintenance as well as refurbishment and network expansion has built up. This<br />

backlog can only be addressed by sufficient capital investment into the electricity<br />

infrastructure. It is difficult to quantify this backlog as the master plan study to determine<br />

the extent thereof has at yet been completed. Requirements for the 2008/09 financial<br />

year however indicate a requirement of approximately R60m.<br />

Between Eskom and the <strong>Municipality</strong> there is 100% coverage of the area as far as the<br />

provision of electricity is concerned. There are however some informal settlements<br />

where no services are provided as these dwellings are placed on unproclaimed land.<br />

There is still a backlog in the provision of public lighting on some through roads and in<br />

some of the previously disadvantaged areas. The extent of this has not yet been<br />

determined as no funds were provided to draft a public lighting master plan.<br />

5.1.4 Infrastructure<br />

Although the municipality has been able to assist all developers and applicants by<br />

providing electricity, the low level of investment in the upgrading/refurbishment/<br />

expansion of the electricity infrastructure has led to a situation that new developments<br />

can no longer be accommodated without major capital injections. It is therefore<br />

absolutely essential that the municipality direct more of the surplus generated by the sale<br />

of electricity to the capital requirements of the electricity function. It is also our<br />

experience that there is a boom in the development of vacant land as well as the<br />

densification of existing developments, which is placing a huge demand on the provision<br />

of electricity and most probably other services as well. The electricity infrastructure will<br />

not be able to handle the increasing demand for electricity and the expansion,<br />

refurbishment, upgrading thereof must start without further delay.<br />

In order to accommodate new developments the developers are required to assist with<br />

the funding for network expansions.<br />

36


Good news is that the provision of more capital for infrastructure development/upgrading<br />

has been increased for the 2008/09 financial year.<br />

Daily maintenance on infrastructure as well as the reinstatement of preventative<br />

maintenance was also continued.<br />

The implementation of load shedding, upon request by Eskom, led to much interruption<br />

of scheduled work and customer dissatisfaction. The load shedding schedules were<br />

however discussed with and agreed to by the <strong>Municipality</strong>’s largest consumers of<br />

electricity, the schedules were communicated to the community via he local news media<br />

and the <strong>Municipality</strong>’s website. The interruption and switching back of loading however<br />

led to overloading problems and even damage to infrastructure equipment.<br />

5.1.5 Challenges<br />

In order to ensure the sustainability of the provision of electricity to all the municipality’s<br />

customers it essential that<br />

• Sufficient capital is made available annually for network maintenance, upgrading<br />

and expansions.<br />

• Continuation of preventative maintenance<br />

• Finalise the master plan for the development of the electricity infrastructure<br />

• Meet the demand for electricity by developers.<br />

• The vacant positions are filled without delays.<br />

• Reduce the number of complaints regarding non functioning street- and high<br />

mast lights.<br />

• Finalise the assessment of the electricity function in terms of section 78(3) of the<br />

Municipal Systems act.<br />

• Embark on and finalise the financial and operational ring fencing of the electricity<br />

function.<br />

• Continue meaningful participation in the creation of the Regional Electricity<br />

Distributors (RED4).<br />

37


5.1.6 Electricity Backlogs<br />

2.3.4<br />

Electricity<br />

Backlogs<br />

Backlogs to<br />

be eliminated<br />

(No.<br />

Households<br />

Not<br />

Receiving<br />

Minimum<br />

Standard of<br />

Service)<br />

(This figure<br />

depends on<br />

the definition<br />

of “Backlog”.<br />

The stands<br />

indicated<br />

here have<br />

been<br />

identified but<br />

building of<br />

houses still<br />

has to<br />

commence)<br />

Backlogs to<br />

be eliminated<br />

(Percentage -<br />

Households<br />

identified as<br />

backlogs /<br />

total<br />

Households<br />

in<br />

<strong>Municipality</strong><br />

Spending on<br />

New<br />

infrastructure<br />

to Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Spending on<br />

Renewal of<br />

Existing<br />

Required<br />

30 June 2007<br />

Budgeted<br />

Actual<br />

Required<br />

30 June 2008<br />

Budgeted<br />

21 353 0 0 2487 0 0<br />

R102.2m 0 0<br />

2487/196480<br />

1.2%<br />

2487*R7000<br />

=R17,409m<br />

R59.9m R9.652m R5.6m R4,669m<br />

R4,286m 0<br />

R18,35m<br />

Actual<br />

R58m<br />

38


Infrastructure<br />

to Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Total<br />

Spending to<br />

Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Spending on<br />

Maintenance<br />

to Ensure No<br />

New<br />

Backlogs<br />

Created<br />

(Rand 000)<br />

R162.1m R9.652m R5.6m R64,099m R22,639m R5,8m<br />

R10.8m R10.8 R8.82m R10,283m R10,283m R9,214m<br />

Percentage distribution of households by type of energy/fuel used for cooking<br />

Table 5.1<br />

Census 2001 Community<br />

Survey 2007<br />

Electricity 81.3 92.2<br />

Gas 1.1 0.8<br />

Paraffin 13.9 6.2<br />

Wood 0.6 0.3<br />

Coal 2.8 0.4<br />

Animal dung 0.2 0.0<br />

Solar 0.1 0.0<br />

Other 0.1 0.0<br />

total<br />

Source: Community Survey, 2007<br />

100 100<br />

Table 7.18 Indicates that electricity use for cooking has increased from 81.3 in 2001 to<br />

92.2 in 2007.Parafin use for cooking has decreased from 13.9 in 2001 to 6.2 in 2007,<br />

and also a decreased use of coal for cooking from 2.8 in 2001 to 0.4 in 2007.<br />

5.2 Electrical Infrastructure<br />

5.2.1 Substations<br />

Table 7.19<br />

Primary substations (88/33/22kV) 34<br />

Secondary substations (11kV) 627<br />

Mini-substations 460<br />

Total 1121<br />

Source : ELM Electricity Dept, 2008<br />

39


5.2.2 Cables<br />

Table 7.20<br />

88/22kV 63 177m<br />

11/6,6kV 787 080m<br />

Source: ELM Electricity Dept, 2008<br />

5.2.3 Overhead power lines<br />

Table 7.21<br />

88/22kV 113 285m<br />

11/6,6kV 204 583m<br />

Source: ELM Electricity Dept, 2008<br />

5.2.4 Transformers<br />

Table 7.22<br />

88/3 Source : ELM Electricity Dept, 2008<br />

3/22kV<br />

11/6,6kV/400V 1 970<br />

Source: ELM Electricity Dept, 2008<br />

5.2.5 Lights<br />

Table 7.23<br />

Streetlights 24 500<br />

High masts 564<br />

Source: ELM Electricity Dept, 2008<br />

5.2.6 Growth in Demand versus Network Capacity<br />

The demand for more electricity by new as well as existing customers is placing an<br />

unbearable strain on the existing infrastructure.<br />

Insufficient capital is available to ensure timeous upgrading/expansion of the<br />

infrastructure and the new/proposed developers are therefore requested to invest large<br />

sums of capital on behalf of the <strong>Municipality</strong> to ensure that they will be properly served.<br />

The evident shortage of generating capacity within Eskom is also a point of much<br />

concern as the load shedding or proposed rationing of electricity has a huge negative<br />

impact on the local economy and the morale of the community.<br />

The ratio of electricity consumed by residential compared to the combined consumption<br />

of business and industrial is estimated to be the following:<br />

Table 7.25<br />

Area Residential<br />

Business and<br />

Industrial<br />

<strong>Emfuleni</strong> 22% 78%<br />

Source: ELM Electricity Dept, 2008<br />

82<br />

40


5.2.7 Electricity Priority Areas<br />

• Improve demand management for electricity in the region<br />

• Plan for effective, efficient and sustainable infrastructure development for the<br />

provision of electricity<br />

• Alternative energy use for cooking<br />

• Provide homes with access to electricity<br />

• Adequate public lighting to the whole community<br />

5.2.8 Load Shedding<br />

The whole country, including the <strong>Emfuleni</strong> jurisdiction, in the recent past, has<br />

experienced unabated levels of load shedding. Load shedding has been brought about<br />

by a shortage of generation supply capacity and is a last resort measure to prevent a<br />

collapse of the national electricity supply system. This has caused major disruptions in<br />

the homes, businesses and the places of employment. Interventions are needed to<br />

minimize the risk of load shedding until the new peaking plant and base load electricity<br />

generating capacity being built comes online<br />

41


CHAPTER 6<br />

6.1 ROADS AND STORMWATER<br />

The core function of the Roads and Stormwater Department is to ensure the safety of<br />

human life and properties, as well as ensuring infrastructure for economic development<br />

through the provision of a functional roads, stormwater and road traffic sign network<br />

within <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong>.<br />

In order to provide these services various engineering and municipal disciplines needs to<br />

be performed. The operations of this Department can be divided into two main<br />

categories namely, Construction and Planning.<br />

Planning :<br />

Planning and administration is done by Managers and Technicians. No planning<br />

section exists in the Department and operational as well as planning issues must<br />

be addressed by the same staff.<br />

Over and above the normal construction and budget planning has to enforce<br />

proper planning of developments with compliance to Bylaws in the area. This is<br />

achieved by evaluating Town Planning applications, services agreements, site<br />

development plans, engineering drawings and building plans.<br />

Furthermore, the Department evaluates complaints from public and politicians<br />

and subsequently uses this information to identify new projects and prioritize<br />

maintenance operations.<br />

The Department is growing into a full fletched department slowly but surely<br />

splitting maintenance(operational) and planning issues.<br />

Maintenance :<br />

The Roads and Stormwater Section has three (3) maintenance Depots where is<br />

situated in Vanderbijlpark, Vereeniging and Sebokeng.<br />

Cumulatively they must maintain 1 411km of tarred roads, 1 031km gravel roads,<br />

462km stormwater pipes, 194km open channels, 11 155 catch pit units, 144<br />

041m 2 road markings and 4 408 road signs in order to provide a functional roads<br />

and stormwater network.<br />

Due to backlogs and personnel constraints, maintenance teams are mainly<br />

involved with corrective maintenance with a small portion of preventative<br />

maintenance.<br />

6.1.2 Achievements :<br />

OPEX<br />

ANNUAL ACHIEVED<br />

Performance Indicator<br />

Planned<br />

2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009<br />

m2 of tar roads<br />

rehabilitated<br />

2,716 2,608 4,959 11,646 6,595 13,088<br />

42


number of potholes<br />

repaired<br />

37,601 35,605 30,212 34,787 40,329 81,268<br />

km of Streets swept 243 89 8 0 615 935<br />

Km tar roads resealed 0 0 55 76 55 60<br />

Km gravel roads graded 235 194 282 242 340 410<br />

Km gravel Roads Rip,<br />

Shape & Rec<br />

35 134 108 179 148 276<br />

Km Gravel Roads regraveled<br />

37 35 32 163 66 257<br />

Nr of signs (re) placed 1,077 941 1,030<br />

m2 road marking<br />

painted<br />

8,382 3,648 35,000<br />

Nr of street names<br />

replaced / reinst<br />

601 712 602<br />

Meters barriers replaced<br />

/ impl<br />

524 510 604<br />

Number of catch pits to<br />

be cleaned<br />

5,499 5,171 5,000<br />

m of pipes to be cleaned 5,000 21,923 40,000<br />

Number of catch pits &<br />

manholes to be build<br />

258 282 370<br />

km of concrete channels<br />

to be cleaned.<br />

11 29 27<br />

km of gravel channels to<br />

be cleaned<br />

9 31 25<br />

Expenditure<br />

R<br />

85,740,14<br />

8<br />

R<br />

86,027,38<br />

8<br />

R<br />

139,927,199<br />

6.1.3 CAPEX<br />

Performance Indicator<br />

Roads and Stormwater Master Plan Completed<br />

Resealing of Existing roads - Lama Way<br />

(Multiyear R 9,000,000)*<br />

Cradock Road Section 3 Phase 2 (Tender<br />

72/205)<br />

Completed<br />

Completed<br />

Bophelong Ext 11, 12 &17 Stormwater phase 1 Completed<br />

Kader Asmal Rd in Bophlong Completed<br />

Amatola Rd in Boipatong Completed<br />

Dr Nkomo St, Delfos Link, Boipatong Completed<br />

Qamata Rd, Bophelong Completed<br />

Labor Intensive Construction of Gravel<br />

roads(Friedman/George & Hally Road –<br />

Mantevrede)<br />

Bapedi Street Completed<br />

Completed R<br />

503,490.00<br />

ANNUAL ACHIEVED<br />

2006/2007 2007/2008<br />

R<br />

R<br />

650,000 -<br />

R<br />

R<br />

6,000,000 -<br />

R<br />

R<br />

2,418,192 -<br />

R<br />

R<br />

-<br />

3,295,514<br />

R<br />

R<br />

1,670,000 501,000<br />

R<br />

R<br />

1,120,000 336,000<br />

R<br />

R<br />

538,000 372,000<br />

R<br />

R<br />

1,226,810 2,673,190<br />

R<br />

-<br />

R<br />

2,871,510<br />

R<br />

4,873,625<br />

43


Pavement Management System Tar Roads Completed<br />

Bophelong Ext 17 Stormwater<br />

Completed<br />

R<br />

-<br />

R<br />

-<br />

R<br />

14,126,492<br />

R<br />

600,000<br />

R<br />

1,040,000.<br />

00<br />

R<br />

16,562,83<br />

9<br />

6.1.4 Challenges :<br />

Description Problem/Challenge Proposal<br />

Turnaround time for filling Get HR support and delegate to DMM and<br />

vacancies is literarily years Manager level and lower.<br />

Need to get trainee technicians into the system at<br />

least one a year to ensure that Sen. Eng<br />

Capacity Building<br />

Technicians can be replaced with capable staff<br />

that is familiar with the <strong>Local</strong> Government<br />

Environment<br />

Council is serving 160,000 units at this stage and<br />

Additional Housing developments in process of establishing is<br />

Developments Approved by 110,000.<br />

Council<br />

Resource component will need to double in the<br />

next 5 to 10 years<br />

Human Capital<br />

Discrepancies in salaries<br />

Proper consultation<br />

departments.<br />

from HR with relevant<br />

Post levels on approved<br />

organigram is not in line with<br />

the Bargaining Council and<br />

SALGA’s levels<br />

Fille<br />

Apples needs to be compared to apples. Asst<br />

managers is on managers levels in certain<br />

departments, Stand alone managers compared to<br />

managers that have 100 and more staff members.<br />

Tech staff. Drivers, Operators, Team Leaders etc.<br />

Office Space<br />

Short Term<br />

Old outdated<br />

equipment<br />

Retention of<br />

Human Capital<br />

Total Posts 938<br />

Not sufficient space available<br />

for 2 X Asst Managers, 2 x<br />

Tech Asst,1 x Sen. Eng Tech,<br />

1 x Clerk<br />

Still vehicles outstanding from<br />

Ren 1. No vehicles received to<br />

date on Ren 2.<br />

Due to the huge shortage in<br />

the industry, technical staff get<br />

paid better in the private sector<br />

and we need to be able to<br />

compete to retain staff as will<br />

cause a collapse i.e. service<br />

delivery<br />

2 Critical<br />

Vacancies<br />

08/09<br />

45<br />

Vacant<br />

Posts<br />

648<br />

The 5 th floor be allocated on the interim to the<br />

Roads Dept and the office occupants be<br />

relocated to the 4 th floor<br />

Fast track procurement process to ensure award<br />

takes place three months from closure of tender<br />

date.<br />

Salaries or additional scares skills allowances<br />

must be implemented for Engineers,<br />

Technologist, Technicians etc.<br />

44


Traffic<br />

Engineering<br />

Section<br />

Operator/Driver/<br />

Team leader<br />

competency<br />

Finance<br />

Lack-off<br />

Competency Levels is low<br />

Procurement process is slow<br />

Late or Non payment of<br />

suppliers<br />

Medium term commitment<br />

Attitude<br />

Scheduled Meetings<br />

Lack of holistic approach<br />

Year end/start of Procurement<br />

Was provided on the organogram, but was<br />

removed. Provision will have to be made in future<br />

revisions.<br />

Proper testing to be done during recruitment<br />

process<br />

Need to improve administrative system. Systems<br />

and procedures need to be agreed upon and<br />

implanted. Must be measured in SDBIP’s of<br />

Finance<br />

The lack to honor contracts with contractors i.e.<br />

payment turnaround times. Policy and<br />

procedures. Must be measured in SDBIP’s of<br />

Finance<br />

Need to commit funding for three years so<br />

departments can properly plan implementation of<br />

CAPEX and major OPEX projects. Planning<br />

equals implementation.<br />

Please think out of the box, but still in the<br />

legislative framework. Praise when we need to<br />

praise.<br />

Schedules must be given for the whole financial<br />

year for Bid Spec Meetings dates and Bid<br />

Adjudication meetings dates. This will enable<br />

departments to plan to a deadline.<br />

Tell me what is my total kitty i.e.. the budget that I<br />

will need then the manager can apportionate<br />

appropriately for critical vacancies, equipment<br />

and plant, material etc. (fleet cost)<br />

There is a tendency that work is coming to a<br />

standstill i.e. Spec Meetings and conversion of<br />

requisition to orders from May onwards and then<br />

also deep into the new financial year.<br />

Budget Approval Vote numbers to be supplied in time.<br />

Flexibility<br />

6.1.5 Capex Progress 08/09<br />

Time to react to interventions or request that was<br />

not in the approved budget is too slow. Policy<br />

and procedure need to be implemented.<br />

It should be noted that most of the identified projects under Roads and<br />

Stormwater are still under construction.<br />

SDBIP CAPEX (Grant Funding MIG) Roll-Overs 07/08<br />

IDP<br />

Alignment Ward<br />

R&S 09<br />

R&S14<br />

R&S 40 &<br />

41<br />

6 &<br />

25 &3<br />

5, 7 &<br />

23<br />

Measurable Objective/ Output<br />

Project<br />

Bophelong Ext 11, 12 &17<br />

Stormwater Phase 2<br />

Labor Intensive Construction of<br />

Gravel roads(Friedman/George &<br />

Hally Road – Mantevrede)<br />

Annual Target<br />

R 8,536,986<br />

R 550,000<br />

45


R&S 25 37 Mpande Street (Zone7) R 528,333<br />

R&S 26 36<br />

19<br />

Maboza Street (Street 5 Zone 12) R 985,424<br />

R&S 32 &<br />

43<br />

Lind Road R 3,000,000<br />

R&S 24 41 Street 1 in Zone 3 R 1,368,600<br />

R&S 80 3<br />

Installation of Stormwater pipe in<br />

Mamelodi St in Boipatong<br />

R 600,000<br />

R&S 03 30 Stormwater Canal in Zone 16 R 2,360,000<br />

R&S 10 33<br />

Pipe Installation Zone 12<br />

Presbyterian Church<br />

R 500,000<br />

R&S 15 12<br />

Sharpeville Stormwater reticulation<br />

Mareka St<br />

R 2,100,000<br />

R&S 21<br />

18 &<br />

37<br />

Gamdor Rd side drains R 750,000<br />

R&S<br />

29 &<br />

38<br />

Bapedi Street R 500,000<br />

TOTAL CAPEX EXPENDITURE R 21,779,343<br />

IDP<br />

Alignment<br />

Ward<br />

Measurable Objective/ Output<br />

Project<br />

Annual Target<br />

R$S 1 Suikerbos River Embankment repair R 300,000<br />

R&S 16 5<br />

Sullivan St Stormwater @ Stand<br />

1279<br />

R 800,000<br />

R&S 18 5 Schoeman St Stormwater System R 500,000<br />

R&S 36 5<br />

Schoeman, Beethoven & Delius<br />

intersection upgrade<br />

R 525,000<br />

TOTAL CAPEX EXPENDITURE R 2,125,000<br />

46


6.1.7 SDBIP CAPEX (Grant Funding MIG) Projects 08/09<br />

IDP Alignment Ward<br />

Measurable Objective/<br />

Output Project<br />

R&S 63 38<br />

Zone 6 ext 3 roads & sw<br />

system Phase 1<br />

R&S 31 40 & 41<br />

Ring Road in Zone 3<br />

(Phase 2)<br />

TOTAL CAPEX EXPENDITURE<br />

6.1.8 SDBIP CAPEX (Grant Funding MIG) Projects 08/09<br />

IDP Alignment Ward<br />

Measurable Objective/<br />

Output Project<br />

Agricultural Holding 63<br />

R&S 60 7 & 25<br />

in Ardenworld S/w<br />

Drainage<br />

R&S 78 6<br />

Thomas Nkobi St<br />

Bophelong x 9<br />

Residensia Road Zone<br />

R&S 52 40 & 38 6 Ext 4(Access Road<br />

Residentia Station)<br />

R&S 41 6,7 & 25<br />

Upgrading of gravel<br />

roads<br />

Office Accommodation<br />

R&S 160 8, 10 & 23<br />

for Head Office and<br />

Centralized<br />

Vanderbijlpark depot<br />

R&S 245 1<br />

Kilpriver/Assegai<br />

Corridor<br />

R&S 246 1<br />

Gen Hertzog Corridor<br />

from Nile to Mariboe<br />

Mantevrede Master<br />

R&S 247 5,6, 7 & 25<br />

Plan Roads and<br />

Stormwater<br />

Implementation<br />

R&S 248 1<br />

Gen Hertzog/Nile<br />

Intersection Upgrade<br />

R&S 249 6 & 8<br />

Delfos Golden Highway<br />

Traffic Lights<br />

Bus and Taxi Lay by’s<br />

R&S 250 1-43<br />

on Class 3 Arterials<br />

R&S 251 9, 12, 13 & 14<br />

R&S 252 10, 21& 22<br />

R&S 36 5<br />

Rossini Blvd Corridor<br />

and Service Road<br />

Faraday Blvd Corridor<br />

and Service Road<br />

Schoeman, Beethoven<br />

and Delius intersection<br />

upgrade Phase 2<br />

Annual Target<br />

R<br />

3,913,000<br />

R<br />

2,145,000<br />

R<br />

6,058,000<br />

Annual Target<br />

R<br />

507,500<br />

R<br />

4,176,000<br />

R<br />

770,000<br />

R<br />

3,000,000<br />

R<br />

2,000,000<br />

R<br />

2,750,000<br />

R<br />

2,750,000<br />

R<br />

3,500,000<br />

R<br />

2,250,000<br />

R<br />

625,000<br />

R<br />

750,000<br />

R<br />

250,000<br />

R<br />

150,000<br />

R<br />

500,000<br />

47


R&S 39 5<br />

R&S 286 38<br />

R&S 287 38<br />

R&S 288 38<br />

TOTAL CAPEX EXPENDITURE<br />

(See quarterly SDBIP’s for detail)<br />

Frikkie Meyer, Verdi and<br />

Macowan St<br />

intersection<br />

Zithulele (S) Seb Zone 7<br />

Mpande St<br />

Zithulele (S) Seb Zone 7<br />

Nguna St<br />

6.1.9 Interventions Planned for 08/09<br />

Maxeka (S) Seb Zone 7<br />

Street U<br />

R<br />

525,000<br />

R<br />

782,000<br />

R<br />

566,950<br />

R<br />

1,720,400<br />

R<br />

27,572,850<br />

Gravel Road Interventions:<br />

Depot Area Description<br />

8 x 6m<br />

Time Frame Cost<br />

Sebokeng<br />

3 Tippers, 2 x Graders,<br />

2 x Water Bowsers, 2 x Roller<br />

Compactors<br />

R8,984,000<br />

6 x 6m Full year starting from<br />

Vanderbijlapark<br />

Mid September, latest<br />

October 2008.<br />

3 Tippers, 1 x Graders,<br />

1 x H/D Tractor, 1 x Track<br />

R5,668,030<br />

Excavator<br />

5 x 6m<br />

Vereeniging<br />

3 Tippers, 2 x Graders,<br />

1 x Water Bowsers, 1 x Roller<br />

Compactors, 1 x Track<br />

Excavator<br />

R4,208,530<br />

Total R18,860,560<br />

48


Tar Road Interventions:<br />

Depot Area Description Time Frame Cost<br />

Existing Teams: 3 x Patching Full year starting from<br />

(18 people EPWP) Vehicles &<br />

Equipment<br />

July to end Feb. 09. Will<br />

be replaced by new<br />

R859,950<br />

Sebokeng<br />

batch.<br />

6 x 6m 3 Tippers, 1 x Graders, Full year staring from<br />

1 x H/D Tractor, 1 x Track<br />

Excavator<br />

November 2008. R1,515,150<br />

Sub Total R2,375,100<br />

Existing Teams: 3 x Patching Full year starting from<br />

(18 people EPWP) Vehicles &<br />

Equipment<br />

July to end Feb. 09. Will<br />

be replaced by new<br />

R859,950<br />

Vanderbijlpark<br />

Additional Teams: 1 x<br />

batch.<br />

Full year staring from<br />

patching, 3 street sweeping<br />

(41 people) Vehicles &<br />

Equipment<br />

October 2008<br />

R1,494,675<br />

Sub Total R2,354,625<br />

Existing Teams: 3 x Patching Full year starting from<br />

(18 people EPWP) Vehicles &<br />

Equipment<br />

July to end Feb. 09. Will<br />

be replaced by new<br />

R1,146,600<br />

Vereeniging<br />

Additional Teams: 4 x<br />

batch.<br />

Full year staring from<br />

patching, 3 street sweeping<br />

(56 people) Vehicles &<br />

Equipment<br />

October 2008<br />

R2,293,200<br />

Sub Total R3,439,800<br />

Total R8,169,525<br />

The aim on the tar roads side is to basically have one or two teams per depot area,<br />

dedicated to addressing complaints alone.<br />

The aim is to have a turnaround time of two days after the day the complaint was<br />

lodge.<br />

Roads that can’t be fixed with pothole patching will either go on for reconstruction or<br />

rehabilitation via external and specialist contractors. This will help to change the<br />

perspective of Council in the community’s eyes.<br />

If a road reported via a complaint requires major work it will be identified to be placed<br />

on the reseal program for the next financial year.<br />

Stormwater Interventions:<br />

Depot Area Description Time Frame Cost<br />

Sebokeng 1 x Track Excavator &<br />

Own<br />

Lowbed<br />

Vanderbijlapark 1 x Track Excavator &<br />

Lowbed to be hired<br />

Started Mid October<br />

2008<br />

Equipment<br />

R360,000<br />

Vereeniging<br />

1 x Track Excavator &<br />

Lowbed to be hired<br />

R360,000<br />

49


ELM<br />

6 x 6m 3 Tippers and one FEL<br />

to be hired to remove silt from<br />

side of channels<br />

Commenced in Mid<br />

Jan 2009 as and when<br />

required<br />

R2,400,000<br />

Total R3,120,000<br />

Road Marking Interventions :<br />

Depot Area Description Time Frame Cost<br />

ELM Additional 10 people to assist<br />

existing teams<br />

External contractor to be<br />

July 2008 to June 2009<br />

R180,400<br />

ELM<br />

appointed to address ± 300 km<br />

of road markings (Lane<br />

Markings, Stop and Yield and<br />

symbols)<br />

In progress<br />

R2,400,000<br />

Total R2,580,400<br />

6.1.10 Capex short & medium term needs (Backlogs CAPEX)<br />

PROGRAM<br />

DESCRIPTION<br />

ANNUAL FUNDING REQUIRED<br />

50<br />

SOURC<br />

E <strong>OF</strong><br />

FUNDS<br />

2007/2008 2009/2010 2010/2011 2011/2012 2012/2013<br />

Stormwater Drainage<br />

R22,716,891<br />

R 507,500<br />

R13,724,000<br />

-<br />

R28,600,000<br />

R 4,000,000<br />

R53,000,000<br />

R 6,75,000<br />

R52,000,000<br />

R 1,700,000<br />

MIG<br />

ELM<br />

Tarred Roads R 8,027,357 R13,777,000 R 4,699,500 R56,627,576 R14,530,000 MIG<br />

R 4,795,000 R 6,612,500 R12,558,030 R55,313,147 R16,198,513 ELM<br />

Office Accommodation R 2,000,000 R 2,000,000 - - - ELM<br />

Priority Township<br />

Program<br />

- - R404,925,000 R404,925,000 -<br />

To be<br />

sourced<br />

Governments Millennium<br />

Goals<br />

R519,057,100 R520,719,600 R466,650,600<br />

To be<br />

sourced<br />

Master Plan R13,025,000 R19,825,000 R17,650,000 R5,750,000 - ELM<br />

- R 2,026,200 - - - MIG<br />

Siyakha(Roads around R 7,245,350 R15,258,775 R14,017,375 - - ELM<br />

schools)<br />

- - - R27,369,325 R19,018,565<br />

To be<br />

sourced<br />

PTP Gautrans - - - R52,975,925 R51,401,465<br />

To be<br />

sourced<br />

R30,744,338 R29,527,200 R33,269,500 R162,603,501 R117,931,465 MIG<br />

Sub Total Funding<br />

R27,572,850 R43,696,275 R48,245,405 R67,813,147 R17,898,513 ELM<br />

Required<br />

- - R923,982,100 R1,005,989,850 R537,070,630<br />

To be<br />

sourced<br />

Total Funding Required R58,317,188 R73,223,475 R1,005,497,005 R1,236,406,498 R672,900,608<br />

(See detail capital program attached)<br />

The target to reach this is getting more difficult each year as the cost for construction<br />

is increasing by between 24 – 45 % per annum.<br />

Council tariffs are increased by VPIX or government guidelines that realize the fact<br />

that you can do less with a rand to rand comparison unless the OPEX and CAPEX<br />

budgets are increased dramatically.


This is not only experienced on the capital side, but also on the material required for<br />

roads & stormwater maintenance that is increasing also by between 20 – 30 %.<br />

MIG Funds<br />

MIG allocation and counter funding for 2008/09 was R99 564 400,00.<br />

The expenditure by the end of April 2009 was standing at R29 511 423,00.<br />

6.2 Infrastructure<br />

The following inventory of services needs to be maintained by this Department.<br />

� Tar Roads 1 411km<br />

� Gravel Roads 1 031km<br />

� Road Marking 144 041m 2<br />

� Traffic Signs 13 275 no<br />

� Stormwater pipes 462km<br />

� Open Channels 194km<br />

� Catchpits 11 155 no<br />

The additional housing schemes that is approved by Council is going to have a<br />

huge impact on maintenance ability of this Department.<br />

The Organogram of this Department will have to be adjusted once these housing<br />

schemes is implemented.<br />

The Department is not capacitated to do maintenance in these areas without<br />

additional resources.<br />

� Developments approved by Council :<br />

� Tshepiso North Extension 3<br />

� Tshepiso Extension 1<br />

� New Village (Sebokeng Extension 27) Evaton North<br />

� Tshepiso Proper<br />

� Sebokeng Extension 24<br />

� Soderwater (Sebokeng Extension 25 and 26)<br />

� Boiketlong / Quaggasfontein (Lethabong Proper and Extension 1,<br />

2 and 3)<br />

� Evaton Small Farms<br />

� Rietkuil<br />

� Sebokeng Extension 21 (Westside Park)<br />

� Tshepiso Extension 4<br />

� Doornkuil(cross border)<br />

� Uitvlugt(cross border)<br />

� Arconpark Ext 10<br />

� Arconpark Ext 11<br />

� Bedworthpark Ext 4,5,6 & 8<br />

� Bophelong Ext 19 (Chris Hani) & 24<br />

� Goosebay Canyon<br />

� Golden Gardens<br />

� Eagles Nest<br />

51


� SE.3 Ext.1<br />

� SE.5<br />

� SE.8 Ext 1 & 2<br />

� SE.9<br />

� Riverspray<br />

� SW.7<br />

� Duncanville Ext 4<br />

� Powerville Park Ext 2, 4, 5 & 6<br />

� Sondlandpark Ext 1, 5, 6, 8 & 10<br />

� Evaton West Ext 5 & 6<br />

� Tshepong<br />

� Evaton Regeneration<br />

� Bonane Ext 2<br />

� Unitaspark Ext 5, 10, 13, 14 & 16<br />

� Vaaloewer(Nonyana)<br />

� Peacehaven Ext 7<br />

The Council is serving around 160,000 units at this stage and the units that will be added<br />

to our area in the next 5 – 10 years will be 122,828, this excludes the 100,000 units from<br />

Johannesburg that will drain to our area i.e. sewer.<br />

6.2.1 Potholes<br />

The lifespan of roads is expected to last for at least ±10 years. The conditions of roads in<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> are in a bad state. The resealing has not been done as<br />

prescribed by pavement management system; hence the deterioration has taken its tall.<br />

There is an urgent need to improve all roads within the municipality.<br />

Six patching teams have taken on, an Expanded Public Works Programme (EPWP).<br />

The impact is that the programme will be reduced by 60%i.e. what has been<br />

programmed for 5 years will then be completed in 3 years provided the teams are kept<br />

continuously. The resealing programme has to be kept up with so that the development<br />

of new potholes is prevented.<br />

6.2.2 Gravel Road<br />

The major cause of deterioration of gravel roads is the sleep gradient with lack of<br />

drainage system. Gravel needs to be imported and be placed on the road again because<br />

it gets washed away by rain.<br />

6.2.3 Road Traffic Signs<br />

The road traffic signs and markings are not 100% compliant with the Road Traffic Act of<br />

1996. In most cases areas that affected are the newly developed areas.<br />

There is an urgent need to provide these newly developed areas with signs that are<br />

compliant with the Act and improve roads signs and markings of other places within the<br />

municipality. In addition, new developed areas had not been provided with street names<br />

boards and this is also essential.<br />

52


6.2.4 Services backlog<br />

Rail<br />

There are two commuter rail lines situated in the western part, running north-south,<br />

linking Vereeniging and Vanderbijlpark with Johannesburg and Germiston. No<br />

extensions to the existing commuter rail system and services are foreseen at this stage;<br />

however the upgrading of stations and development of intermodal transport facilities<br />

should be commenced with.<br />

6.2.5 Linkage and Road and Rail Networks Priority Areas:<br />

• Road networks need to be defined and developed in line with function (mobility,<br />

activity, public).<br />

• The railway service should represent the core service around which public transport<br />

is provided.<br />

• Railway infrastructure presents an opportunity for transit orientated development<br />

which essentially means that the layout and design of land uses around the railway<br />

stations are all orientated towards promoting the utilization of the railway system.<br />

• There are implications for detailed land use planning in the vicinity of the existing two<br />

commuter rail lines in the district.<br />

• Upgrading of stations and development of intermodal transport facilities should be<br />

commenced with.<br />

53


CHAPTER 7<br />

7.1 COMMUNITY DEVELOPMENT<br />

7.1.1 Public Health<br />

The function includes the provision of a comprehensive Environmental Health Services<br />

to ensure that an efficient and effective environmental health services is rendered to<br />

enable the community to live in a healthy and hazard free environment.<br />

Challenges<br />

Construction of clinics at Johan Deo, Evaton West and Bophelong Extension, Zone 17<br />

and Boitumelo.<br />

7.1.2 Social Development<br />

Four townships placed in a 20 Prioritised Township Programme (PTP) will benefit from<br />

the R58.09 million put aside by provincial treasury for development of ECDs, Services<br />

for the Elderly and Child headed families. The implementation within <strong>Emfuleni</strong> municipal<br />

area focuses on:<br />

• Stand 1993, Boipatong<br />

• Stand 5050 Ext 10, Bophelong<br />

• Stand 70 Zone 10 Ext 3 Sebokeng, (Bongani Day Care Centre for Elderly)<br />

• Stand 62 Johan Deo Sebokeng<br />

• Stand 23204 Zone 13 Sebokeng (Age in Action Old Age Home), 2008/09<br />

• Stand 8910 Sharpeville (behind old TB clinic)<br />

Each ECD catering for 120 children, will be based on a single model allowing for each<br />

child to be cared for in a secure and caring environment, assisting development of<br />

appropriate knowledge, skills and behaviours. Services provided will include physical<br />

care, stimulation programmes, and three meals per day for the children, and support and<br />

advice to parents on ECD. Infrastructure requirements for each site include: Kitchen and<br />

pantry, ablution facilities, Laundry and sluice, sickbay, indoor and outdoor play areas, in<br />

accord with approved norms and standards. Staffing for each facility will consist of 10<br />

caregivers, and 10 administration and support staff. Day Care for the Aged, a further<br />

priority for the Department requires the provision of social, recreational and health<br />

services for the Elderly, on a daily basis within a supervised and protected environment.<br />

Number of Old Age homes within the municipal Area<br />

Table 7.1<br />

NAME <strong>OF</strong> THE ORGANISATION Number of beneficiaries<br />

Vukuzenzele old age home 30<br />

Age in Action Old Age Home 12<br />

Bongani Day Care for the Aged 40<br />

Vaal Echoes of Love Centre 7<br />

Avondrus Old Age Home 76<br />

Jeugland Old Age Home 116<br />

Huis Siesta 151<br />

Total 432<br />

54


<strong>Emfuleni</strong> has a total of 56020 elderly persons (60-85+) of which 31356 are female and<br />

24664 are male persons. The total % of elderly persons in <strong>Emfuleni</strong> in old age homes<br />

are: 0, 77%. Not all the old age homes are listed, which will obviously increase the<br />

percentage. In addition means older persons are still living with their families.<br />

7.1.3 Home Based Care Centres in <strong>Emfuleni</strong><br />

Table 8.2<br />

ORGANIZATION BENEFICIARY<br />

Community Research and Development Centre 10 Care givers,33 EPWP,430<br />

Beneficiaries<br />

Emthonjeni Awareness Centre 10 Care givers,50 EPWP,1600<br />

Beneficiaries<br />

Vaal Aids Home Based Care/Enduduzweni Drop 10 Care givers,33 EPWP,430<br />

Centre<br />

Beneficiaries<br />

Dirang Ka Kagiso 3 Care givers,20 EPWP,360 Beneficiaries<br />

Doulos Ministries 10 Care givers,25 EPWP,350<br />

Beneficiaries<br />

Ikeletse ka Kopano 10 Care givers,33 EPWP,430<br />

Beneficiaries<br />

ASEDI Bophelong Development Centre 10 Care givers,22 EPWP,320<br />

Beneficiaries<br />

Ngqobile Women’s Group 10 Care givers,22 EPWP,320<br />

Beneficiaries<br />

The SA Red Cross Society Vaal Branch Drop in 10 Care givers,24 EPWP,340<br />

centre<br />

Beneficiaries<br />

Group of Mercy 10 Care givers,20 EPWP,300<br />

Beneficiaries<br />

Botshabelong Child Care and Drop in centre 10 Care givers,23 EPWP,330<br />

Beneficiaries<br />

Johandeo Home Based Care 10 Care givers,23 EPWP,330<br />

Beneficiaries<br />

Kopano Ke Matla 10 Care givers,23 EPWP,330<br />

Beneficiaries<br />

Bambanani Support Group 10 Care givers,20 EPWP,300<br />

Beneficiaries<br />

We Are Not Alone Care Givers 10 Care givers,25 EPWP,350<br />

Beneficiaries<br />

Sharpeville Day Care 10 Care givers,23 EPWP,330<br />

Beneficiaries<br />

BANA BA BAHODIMO 10 Care givers,22 EPWP,320<br />

Beneficiaries<br />

THAROLLO 10 Care givers,28 EPWP,380<br />

Beneficiaries<br />

ASIBAVIKELE CHBC 10 Care givers,20 EPWP,300<br />

Beneficiaries<br />

7.1.4 HIV and AIDS<br />

The effect of HIV and AIDS must also be taken into consideration in as far as the supply<br />

of labour or EAP is concerned because the decline in the working age cohort (people<br />

55


etween the ages 15 to 64) as a percentage of the total population could be the result of<br />

the impact of Aids on the population. Further studies of the impact of HIV and AIDS on<br />

the population growth and economic development will need to be done.<br />

High HIV and Aids Scenario<br />

Table 7.3<br />

High HIV/Aids<br />

Main 2001 2006 2007 2008 2009 2010<br />

Boipatong 16,865 11,738 10,858 10,044 9,291 8,595<br />

Bophelong 37,775 55,504 59,667 64,142 68,953 74,124<br />

Evaton 143,153 155,260 157,025 158,810 160,616 162,442<br />

Sebokeng 222,073 228,838 229,071 229,304 229,538 229,772<br />

Sharpeville 41,020 35,502 34,313 33,164 32,054 30,981<br />

Tshepiso 22,953 48,211 55,684 64,315 74,284 85,798<br />

Vanderbijlpark 80,266 73,565 71,926 70,323 68,756 67,224<br />

Vereeniging<br />

Total<br />

73,328 77,908 78,468 79,032 79,600 80,172<br />

658,533 692,512 696,053 699,612 703,189 706,784<br />

Source: DBSA, 2006<br />

7.1.5 HIV and AIDS Youth Awareness<br />

HIV and AIDS it’s a world’s problem, but statistics show that within the Southern Africa<br />

the pandemic has taken its tall over people. Out of an estimated 40 million infected<br />

women and children in the world, 70% are living in the sub-Saharan Africa. South Africa<br />

forms part of the sub-Saharan Africa and so is Gauteng as well as <strong>Emfuleni</strong>. As a result<br />

of these shocking statistics, <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> in conjunction with Sedibeng<br />

District <strong>Municipality</strong> and VNG working together with Stop Aids Now collaborated and<br />

agreed on implementing measures that are geared to reducing and combating the<br />

spread of this pandemic.<br />

The initiative is aimed at promoting all issues that are related to professional<br />

administration and handling of the HIV/AIDS. Amongst others issues like prevention,<br />

awareness, treatment, counselling, care of orphan, vulnerable children and so on. Other<br />

issues that would be addressed also include service delivery. Specific services become<br />

prevalent when people are infected with HIV and have fully developed AIDS.<br />

The initiative would be benefiting the youth in such a way that the youth itself would be<br />

directly involved in developing the youth policy on HIV and AIDS as well as on<br />

programmes such as de-stigmatisation and awareness, promoting safer sex behaviour,<br />

distribution of condoms, posters and so on. NGOs and Private sectors would also lend a<br />

hand in the implementation of this initiative.<br />

56


CHAPTER 8<br />

8.1 EDUCATION<br />

8.1.1 Educational Infrastructure<br />

A number of school buildings are in poor working conditions, some have poor road<br />

access. Access to adequate water and sanitation in some schools does not reach<br />

minimum requirements. The following schools are identified as 20 PTP projects for<br />

improvement on the existing infrastructure:<br />

Table 8.4<br />

Sharpeville Bophelong Sebokeng<br />

o Lehlasedi Primary - o Bophelong Secondary - o Fadimeha Primary - Repairs<br />

Refurbishment<br />

New School<br />

o Fundulwazi Primary - Refurbishment<br />

o Seliba Primary - o Mquniswa Primary - o Iphahlolleng Intermediary - Repairs<br />

Refurbishment<br />

Fencing<br />

o Qhoweng Primary - Refurbishment<br />

o Thutolore School –<br />

o Sazakhela Primary - New School<br />

Secondary -<br />

o Setlaboja Primary - Repair<br />

Refurbishment<br />

o Sebokeng Secondary - New School<br />

o Itsose Primary -<br />

o Tshidiso Primary - Refurbishment<br />

Refurbishment<br />

o Setlabija Primary - Repair<br />

o Thuto-Tiro Comprehensive -<br />

Refurbishment<br />

o Sebokeng Technical High - Repairs<br />

o Phepane Primary - Fencing<br />

o Tshitsho Primary - Repairs<br />

o Tjabatsatsi Primary Refurbishment<br />

8.1.2 Education Institution<br />

Table 8.5<br />

Description 2001 %<br />

None 69405 27.1<br />

Pre - school 9 587 3.75<br />

School 158 090 61.89<br />

College 6353 2.49<br />

University of Technology<br />

(formerly called Technikons) 6962<br />

2.7<br />

University 3250 1.27<br />

Adult education 1273 0.5<br />

Other 505 0.2<br />

Total<br />

Source: Stats SA 2001<br />

255 425 100<br />

8.1.3 The Status of Youth<br />

The table below depicts estimated youth population in <strong>Emfuleni</strong> Municipal area. The<br />

highest youth aged group according to stats SA 2001 is between the age of 20 and 24,<br />

57


this is basically 29% of the whole youth population and the lowest age group is between<br />

30 and 34 which is 11% of the estimated population.<br />

Age groups<br />

Table 8.5<br />

Description 2001 %<br />

15-19 65 037 25.08<br />

20-24 71 493 27.58<br />

25-29 66 919 25.81<br />

30-34 55 812 21.52<br />

Total 259 261 100<br />

Source: Stats SA 2001<br />

Youth Forums<br />

8.1.4 <strong>Emfuleni</strong>’s report on the establishment of <strong>Local</strong> Youth Units<br />

The process of establishing <strong>Local</strong> Youth Units started during the youth month (June<br />

2008).This process was driven by the district municipality since the local municipalities<br />

did not have a youth policy and there was no budget for the youth month.<br />

Youth Summit was held in June 2008 at Vaal University of Technology, the summit<br />

involved all the municipalities and their youth formations. This initiative was facilitated by<br />

the district municipality and all the three local municipalities were stakeholders. About<br />

250 young people debated robustly on the type of youth policy to be implemented.<br />

The resolutions of that youth summit were then taken for adoption firstly by the district<br />

municipality. This did not mean that if the district municipality accepts these resolutions<br />

then it will be a one size fits all for the local municipalities.<br />

Sedibeng District <strong>Municipality</strong> and <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> have in their position draft<br />

youth development policies which are just waiting for adoption by the respective<br />

councils.<br />

There seems to be problems when it comes to the institutional arrangements of these<br />

units. Firstly there are budgetary constrains since the council’s financial year began on<br />

the 01 st July and there were no funds allocated for the employments of this proposed<br />

structure:<br />

• Youth Development Manager (Job level 02/03)<br />

• Youth Coordinator in the office of the Executive Mayor (Job level 06)<br />

• Youth Coordinator at Social Development (Job level 06)<br />

• Administrative officers (Job level 09)<br />

• Youth Workers (foot soldiers)<br />

Equally there is no section 80 on Youth Development and there was a proposal that<br />

there be one which will consist of (07) councillors of which four should represent the<br />

majority party. This committee will discuss reports prepared by the youth development<br />

manager and recommend to mayoral committee for final decision.<br />

58


After all this has been established a youth council will be appointed from youth<br />

formations representative of all sectors.<br />

Currently the YAC’s are the most vibrant implementers of youth development since they<br />

are guided by Umsobomvu and they have a clear mandate. The district has only four<br />

YAC’s and this number need to be increased to six. They also need to be expanded<br />

from existing pilot project to be permanent institutions.<br />

The NYP (National Youth Policy 2008- 2013) clearly states that youth development<br />

practitioners need not necessarily be under the age of 35.<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> wishes to have an empowered youth able to realize full<br />

potential and understand their role and responsibilities in making meaningful contribution<br />

to the development of a non racial prosperous South Africa.<br />

<strong>Emfuleni</strong> does not have a structure in place to deal with youth issues. There are at least<br />

over 50 youth organisations that are operating within <strong>Emfuleni</strong>. Social Development in<br />

Gauteng Province has established Youth Forum within the district which addresses<br />

youth developmental issues. A proper link has not been established yet with this<br />

initiative in terms of the functions and responsibilities as well as contributions expected<br />

from <strong>Emfuleni</strong>.<br />

8.1.5 Youth Expectations<br />

Youth development should be a priority in <strong>Emfuleni</strong><br />

<strong>Emfuleni</strong> should develop a youth friendly recruitment strategy<br />

Implementation of 100 learnerships (Skills Development Plan)<br />

Sports Development Strategy<br />

Entrepreneurs Development Strategy (LED)<br />

Capacitate libraries to be youth information centres<br />

8.1.6 Youth Advisory Centres<br />

The decision of the District to establish Youth Advisory Centres was without any doubt<br />

on of the most progressive undertakings in the quest for youth development in the entire<br />

region. These centres will propel and inject a renewed hope and dream for a better<br />

future for the young people of this district. The Youth Centres are partnered with<br />

Umsobomvu Youth Fund which is thrust with the responsibility of locating young people<br />

in the mainstream of the economy by providing:<br />

• employment opportunities,<br />

• increase the skills base,<br />

• inculcating and financing entrepreneurship innovations,<br />

• Career guidance & Counselling, and<br />

• Equipping young people with the necessary life skills & tools in order to become<br />

contributing citizens.<br />

The centres have to live to these expectations as inform diaries by providing information<br />

based on the five (5) key streams. In the recent months since the launch of the Youth<br />

Advisory Centres there has been an influx of young people in these centres and as we<br />

engage with them, it became very clear of the challenges of lower levels of formal<br />

59


education, almost non-existent market related technical & vocational skills and that they<br />

have a gloomy future prospects of the region to create opportunities for a better life.<br />

However, the encouraging part is their optimism and faith in the ability of some parts of<br />

the country to present such opportunities. The national spatial development orchestrated<br />

by the erstwhile regime which promoted economic migration at the expense of family life<br />

which resulted to untold hardships & estrangements. South Africa’s democracy is<br />

founded on principle of freedoms as espoused in the Bill of Rights but however the<br />

skewed economic development in favour of other regions does nothing to promote equal<br />

opportunities, rather negates freedom of choice and perpetuates survivalists` tendencies<br />

and exploitation among other undesired consequences.<br />

The Centre made the following findings as a result of the beneficiary profiles that were<br />

created which are completed by young people at the centre. From a sample of (3200)<br />

walk-ins and outreach promotes in the past four (4) months in the area of Boipatong,<br />

Tshepiso & Sharpeville, we were able to make these findings amongst other challenges<br />

confronting young people:-<br />

• The Youth Advisory Centres operates in an economically depressed environment,<br />

• women and mainly young women are frequent visitors of the centre,<br />

• that these visitors are mainly unemployed,<br />

• they have low levels of formal education,<br />

• they lack the relevant labour market orientated skills,<br />

• they lack the necessary business knowledge, and<br />

• lack self-worth.<br />

Young people by their nature are the future of any country and in our district, continue to<br />

be the majority; hence they should be in the centre of development. Therefore these<br />

findings are indicative of a bleak future which requires a prompt intervention.<br />

Umsobomvu Youth Fund has identified the following sectors as preferences;-<br />

• Tourism<br />

• Information, Communication and Technology (ICT)<br />

• Manufacturing<br />

• Construction<br />

• Agro- processing<br />

These sectors are seen as opportunity for growth of the country’s economy and which<br />

should be pursued as enterprises.<br />

8.1.7 Services rendered<br />

Activity Bophelong<br />

Over-counter<br />

information<br />

provision (Walkins)<br />

YAC<br />

1715 Beneficiaries were<br />

provided with<br />

information and<br />

required services and<br />

support.<br />

Boitshepiville<br />

YAC<br />

1096 Beneficiaries got<br />

information on products and<br />

services offered by the YAC<br />

Point.<br />

Sebokeng YAC<br />

None<br />

60


Information<br />

provision in the<br />

communities<br />

(outreach)<br />

Career<br />

Counselling.<br />

3700 Beneficiaries<br />

information and support<br />

from YAC Points.<br />

97 Beneficiaries from<br />

the walk ins have<br />

developed career plans.<br />

Life Skills. 365 Beneficiaries are<br />

guided in marking<br />

informed decisions<br />

about their career and<br />

personal lives.<br />

Entrepreneurship 97 Beneficiaries are<br />

guided and support in<br />

fixing exit opportunities.<br />

Job Preparation /<br />

Employment<br />

workshop<br />

Basic Computer<br />

Training<br />

60 Beneficiaries are<br />

guided in preparing for<br />

the world of work, e.g.<br />

compiling of CV’s &<br />

conducts oneself on<br />

interviews.<br />

96 Beneficiaries are<br />

trained on basic<br />

computer skills and<br />

supported for livelihood<br />

opportunities.<br />

514 Young people got<br />

information on how to access<br />

opportunities & received<br />

knowledge about product &<br />

services.<br />

53 Beneficiaries are guided in<br />

making informed decisions<br />

about their career and<br />

personal lives.<br />

118 Beneficiaries are provided<br />

informed on responsible living<br />

and to being contributing<br />

citizens, e.g. Goal setting,<br />

volunteerism etc.<br />

86 Beneficiaries are referred<br />

to be Products of the Fund<br />

and External sources of<br />

support for entrepreneurship<br />

development & funding.<br />

423 Beneficiaries are guided<br />

in preparing for the world of<br />

work, e.g. compiling CV’s and<br />

conducts oneself on<br />

interviews.<br />

54 Beneficiaries are provided<br />

with computer training as a<br />

means of access opportunities<br />

through ICT.<br />

Bophelong Boitshepiville<br />

YAC<br />

YAC<br />

Intervention/Activities No of No of<br />

beneficiaries beneficiaries<br />

Career counselling 89 49<br />

Bursary information 76 97<br />

Job placement 10 423<br />

CV writing & Interview preparation 06 113<br />

Life skill classes (personal<br />

development)<br />

45<br />

Business entrepreneurship 11 110<br />

Basic computer skills 94 54<br />

Learnerships and employment<br />

referrals<br />

45<br />

Say card 98 238<br />

Life skills sessions (HIV/AIDS<br />

118<br />

prevention and teenage pregnancy) 365<br />

Business mentoring 36<br />

Sebokeng<br />

YAC<br />

No of<br />

beneficiaries<br />

194 Outreach<br />

programme<br />

57 Career<br />

Guidance<br />

39 Schools<br />

Debating and<br />

Public Speaking<br />

131 South African<br />

Youth Cards<br />

61


Information and referrals about our<br />

service and product<br />

225<br />

Home affairs referrals (ID, birth<br />

certificate, passports)<br />

231<br />

SASSA Referrals (social security<br />

grants)<br />

57<br />

Arts and culture (dance, poetry and<br />

drama)<br />

20<br />

Sports (free bee) 18<br />

Youth desk sports tournament<br />

meeting<br />

9<br />

Inter-Departmental meeting 6<br />

Khensani-Life Line Birthday party 48<br />

Boipatong Operation Restore<br />

Dignity Launch<br />

82<br />

Business consultation 18<br />

Thuto-Lore Secondary School 85<br />

Big Exco Sedibeng District<br />

<strong>Municipality</strong><br />

30<br />

Road Shows (Umsobomvu mobile<br />

YAC)<br />

126<br />

8.2.2 Youth Priority Areas<br />

• Conscientize the youth about the Growth and Development Strategy (GDS) of the<br />

District<br />

• Mainstreaming young development.<br />

• Young people have to develop business concerns and skills in these sectors<br />

• Prioritise preferred streams for the district.<br />

• Locate work opportunities for young people.<br />

• More information and support to beneficiaries at the Boipatong YAC.<br />

• Buy in from participants<br />

• Internet access for young people in the youth advisory centres<br />

• Convert Yak’s into one stop shop centres<br />

8.2.3 Public Safety<br />

The main objective is to render fire fighting, rescue services as well as other related<br />

emergency functions. Amongst other duties the section deals with conducting fire safety<br />

inspections at industry and commerce, evaluation of building plans, provide fire safety<br />

advisory services, liaise with developers in term of fire safety measures, conduct risk<br />

analysis in area of jurisdiction, conduct fire investigation to assist legal system, increase<br />

effectiveness and efficiency of fire fighting in the whole area, the procurement of the fire<br />

engine has also reduced the response time, etc.<br />

Other priority crimes at <strong>Emfuleni</strong> varies depending on a specific area. But generally<br />

house breakings in residential areas, bus robbery, car hi-jacking, assault GBH, rape,<br />

theft and common assault are amongst the most common crimes.<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> has a crime prevention strategy in place which is part of the<br />

community safety plan of Sedibeng District <strong>Municipality</strong>.<br />

62


8.2.4 TRAFFIC (LAW ENFORCEMENT)<br />

8.2.4.1 Traffic and Security<br />

Fire arms are still to be procured. Suppliers are unwilling to give quotations due to the<br />

new Fire Arms Control Act that has come into effect in 2005.<br />

A report was submitted to Council for the replacement of 134 redundant fire arms and<br />

the accreditation of <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> to be accredited as an official institution<br />

to possess fire arms and to control a fire arm register. Funds budgeted for this purpose<br />

has been withdrawn.<br />

Transfer of the licensing function to local municipalities has not taken place. A political<br />

decision needs to be taken speedily regarding this matter. The transfer of the function<br />

will benefit the SDM as well as the <strong>Local</strong> Council as it will unburden the SDM of<br />

operational matters and allow SDM to perform a coordination function. The locals will<br />

benefit in terms of service delivery at grassroots level and additional revenue.<br />

8.2.4.2 FIRE & RESCUE SERVICES<br />

The main objective is to render fire fighting, rescue services as well as other related<br />

emergency functions. Amongst other duties the section deals with conducting fire safety<br />

inspections at industry and commerce, evaluation of building plans, provide fire safety<br />

advisory services, liaise with developers in term of fire safety measures, conduct risk<br />

analysis in area of jurisdiction, conduct fire investigation to assist legal system, increase<br />

effectiveness and efficiency of fire fighting in the whole area, the procurement of the fire<br />

engine has also reduced the response time etc.<br />

8.2.4.3 Fire Brigade & Rescue Services<br />

Main objectives of Fire Brigade & Rescue Services are:<br />

• Fire Brigade services<br />

• Rescue services<br />

• The division of tasks can be functionally divided into the following categories:<br />

Operational Services<br />

• Rendering of fire fighting duties<br />

• Rendering of rescue services<br />

• Rendering of other related emergency functions<br />

Operational services imply the actual performing of tasks at the scenes of existing<br />

emergencies<br />

8.2.4.4 Safety and Training Services<br />

Rendering of fire safety services:<br />

Apply relevant legislation concerning fire safety<br />

Evaluation of building plans<br />

Conducting fire safety inspections at industry and commerce<br />

63


Provide fire safety advisory services<br />

Liaise with developers in terms of fire safety measures<br />

Conduct risk analysis in area of jurisdiction<br />

Conduct fire investigations to assist legal system<br />

8.2.4.5 Provide Training<br />

In house training on a continuous basis is taking place every Monday, Tuesday<br />

Wednesday and Friday and is done by Station Officers Training.<br />

64


CHAPTER 9<br />

9.1 INFRASTRUCTURE AND SERVICE DELIVERY<br />

9.1.1 PROPERTY SECTION<br />

9.1.1.2 Overview<br />

The Property Section’s vision is the effective facilitation of Development<br />

applications and the effective and efficient managing of Council fixed assets.<br />

In order to achieve the above the Property Section must:<br />

- Respond to applicants/developers professionals and governmental<br />

departments within an acceptable timeframe and submit applications to<br />

the relevant Committees without unreasonable delays.<br />

- Deliver an effective service to the public by providing the necessary<br />

information and guidelines in terms of relevant legislation, procedures and<br />

policies within an acceptable timeframe and without unreasonable delays.<br />

- Promote economic development by means of effective and responsive<br />

service delivery.<br />

9.2 SITUATION ANALYSIS<br />

9.2.1 Moratorium on the Sale of Land<br />

A moratorium on the sale of Municipal property until December 2007 was requested by<br />

the Gauteng Department of Housing during 2006. The moratorium was accepted by<br />

Council in December 2006 with certain exceptions like the sale of road reserves and<br />

properties required by state organs. A further report was submitted and approved by the<br />

Mayoral Committee to exclude transactions which were already entertained prior to the<br />

moratorium like tenders which were already advertised but not administratively finalized.<br />

The tenders which were advertised but never finalized and awarded was submitted to<br />

the procurement Section during September 2007 for submission to the Bid Adjudication<br />

Committee for consideration. These applications have not yet been entertained and the<br />

matter is being discussed with the Procurement Section again.<br />

The issue of uplifting of the moratorium has been discussed with the Gauteng<br />

Department of Housing and the Gauteng Department of Housing confirmed that Councils<br />

must use their own discretion on imposing moratoriums on the sale of Council property.<br />

The most important factor should be the retaining of vast pieces of land for the purpose<br />

of future housing developments.<br />

The sale of individual stands, zoned for specific purposes will not have a negative effect<br />

on future housing developments.<br />

65


9.2.2 Existing Activities<br />

A disposal policy has been approved in February 2008. The previous disposal policy<br />

was amended in order to be aligned with the Supply Chain Management Policy and the<br />

provisions of the Municipal Management Finance Act.<br />

At present land is still being leased to applicants on an ad hoc basis. The registration of<br />

servitudes are proceeding in the light there of that it is a necessity for providing of certain<br />

basic services like electricity and water by entities like Rand Water Board and Eskom.<br />

Applications for acquiring vacant land (for lease or sale) represents 80% of the Property<br />

Sections activities. The other 20% contains of lease of buildings (approximately 5%,<br />

registration of servitudes 5%, legal work 5% and other administrative work (capturing of<br />

data 5%.)<br />

The transfer of businesses in former disadvantage areas, which qualifies in terms of the<br />

Conversion Act is in process.<br />

Other activities which will be discussed under key challenges are:<br />

- Land Audit<br />

- Development of a data base for agreements and property transactions.<br />

9.2.3 Achievements<br />

9.2.4 Finalization of Land Policy<br />

The Policy was approved and is implemented on a continuous basis.<br />

Finalization of Policy on Security Access Restrictions: Policy was approved by Council in<br />

February 2008. Existing applications are revised at present.<br />

Incorporation of Land Audit into GIS<br />

Land Audit information was given to Open Spatial solutions. Reports were created for<br />

updating of information like lease agreements, servitudes, owner information etc. All<br />

lease agreement and servitude information is updated on the GIS system at present.<br />

9.2.5 Verification of Land Audit<br />

Verification of Land Audit information with Emendo, the consultant firm, which were<br />

appointed to finalize the Land Audit, is in the process. Two lists have been verified with<br />

Emendo. Approximately 800 properties were verified but due to challenges as discussed<br />

below, the verification process will progress very slow.<br />

9.2.6 Transfer of Businesses in former Disadvantage Areas<br />

The transfer of businesses, crèches and churches in former disadvantage areas, which<br />

qualifies in terms of the Conversion Act is in process.<br />

The Department of Housing has scrutinized 50 applications which qualifies and will<br />

advertise these in the first week of December to invite interest parties as well as possible<br />

objectors to respond.<br />

66


Further applications of which the files are lost will be submitted to the Department of<br />

Housing in December 2008, after a list of these have been received from the Evaton<br />

Business group.<br />

9.2.7 Key Challenges<br />

9.2.8 Land Audit Challenges<br />

A land audit has been completed during 2006. The Land Audit verification process is an<br />

on-going process which will go on hand in hand with the GIS updating process.<br />

The Land Audit information was based on information obtained from the Land Surveyor<br />

General and the Deeds Office which information is not always correct. Another factor<br />

which contributes to the discrepancies in information , is the fact that Township registers<br />

in several disadvantage areas have not yet been opened. These properties is shown as<br />

farm portions on the Land Audit information but is in actual fact divided in numerous<br />

different stands which have not yet been registered at the Deeds Office.<br />

Discrepancies in the information, which Council have and the information , which were<br />

submitted by Emendo have been identified. These discrepancies have been submitted<br />

to Emendo and Emendo is in the process to correct.<br />

The Financial Department has embarked on a data clean up process and the PSU<br />

company was appointed to assist.<br />

According to information from the Data Clean up meetings driven by the Financial<br />

Services Cluster, a much more comprehensive database on ownership as well as land<br />

uses and zonings have been compiled which can be utilised as database for Council<br />

owned properties.<br />

During October 2008 the Land Audit information as well as information on lists of all<br />

Council owned buildings, drafted by officials of the property section, were submitted to<br />

PSU International who were appointed by Council to assist with the data clean up<br />

process.<br />

9.3 Challenges on Developing a Data Base<br />

The QUIDITY company was involved in providing a software program which suits the<br />

needs of the property section. Several meetings were held in order to develop a program<br />

for the updating of data (lease agreement data and progress on property transactions).<br />

No progress has however been made and the property section is still capturing all data<br />

electronically on spread sheets.<br />

The development of a proper system is a key challenge due thereto that a system will<br />

provide linkages between all activities and will simplify the process of immediate access<br />

to information.<br />

67


9.3.1 Challenges on Transfer of Businesses/Crèches/Churches<br />

A number of files were lost when the Lekoa City Council amalgamated with the Western<br />

Vaal Metropolitan Substructure. The information on these businesses, crèches and<br />

churches will have to be obtained from the public/ applicants who can proof that the<br />

properties were allocated to them before 1 January 1989.<br />

The scope of the applications, which qualifies, needs to be understood by interest<br />

parties. Only allocations of vacant land which were developed by the person to whom it<br />

was allocated will be entertained.<br />

The process will be administrated by the Department of Provincial Housing and and<br />

adjudications and allocations will be done by the Department.<br />

Number of Properties<br />

The table indicates the number of properties which vest with the different categories of<br />

Land Owners. Please note that table 7.1 and 7.2 might not be entirely accurate since<br />

land audit is a n on going process which will go hand in hand with the GIS updating<br />

process.<br />

Table: 9.1<br />

Category Private Mining Parastatal <strong>Local</strong> State No Total<br />

Government Owned details<br />

Erven 131 512 210 9 982 639 30 143<br />

669<br />

041<br />

Parks - - - 888 - - 888<br />

Small<br />

Holdings<br />

3 606 - - 410 7 - - 3 613<br />

Parent<br />

Farms<br />

57 - 5 8 - - 70<br />

Farms<br />

Portions<br />

1 660 - 167 91 88 - 2006<br />

Total 136 512 382 10 976 727 30 149<br />

991<br />

618<br />

Percentage 91% 0.5% 0.5% 7% 1% 0% 100%<br />

Source: Land Audit Report, 2006<br />

The total number of properties within the municipality calculates to 149 618 units of<br />

which the majority (96%) is located within the urban area, while 2% vests with small<br />

holdings and the remainder is farms and farms portions. The majority (92%) of land<br />

parcels is privately owned. The lack of land on the side of the municipality will hamper or<br />

slow development substantially. There is a large number (9982) of stands which vests<br />

with the municipality.<br />

The reason for such high numbers is that township registers have been opened in<br />

certain historically disadvantaged areas which delay the process of transfers to house<br />

occupants.<br />

68


9.3.2 Extent of Land Ownership in hectors<br />

Table 7.2<br />

Category Private Mining Parastatal <strong>Local</strong><br />

Government<br />

State<br />

Owned<br />

No<br />

details<br />

69<br />

Total<br />

Erven 10 629 275 47 1 728 369 7.0 13 055<br />

Parks - - - 1 392 - - 1 392<br />

Small<br />

Holdings<br />

9 265 - - 12 - - 9 277<br />

Parent<br />

Farms<br />

80 901 - 1 510 164 - - 82 575<br />

Farms<br />

Portions<br />

67 618 - 4 243 2 403 3 064 - 77 328<br />

Total 168 413 275 5 800 5 699 3 433 7.0 183<br />

627<br />

Percentage 91,2% 0,14% 3,15% 3,10% 1,86% 0% 100%<br />

Source: Land Audit Report, 2006<br />

The majority of land within the municipality is owned privately (92%). Of the total extend<br />

of the municipality, 8% of the land is urban, while 5% is small holdings and 87% is farm<br />

land.<br />

This valuable information on land audit present a great tool for both future planning and<br />

decision-making. The information forms part of the asset registry to be used for inventory<br />

control.<br />

In this way, land is easily identified for economic, social and housing development for<br />

infill and integration.<br />

9.4 Housing<br />

The latest release by statistic SA Community Survey reveal that <strong>Emfuleni</strong> Households<br />

have increased from 187 044 in 2001 to 196 480 in 2007.<br />

9.4 1 Formal (Townships)<br />

Table 7.3<br />

Sharpeville 6 531<br />

Bophelong 12 823<br />

Boipatong 2 012<br />

Sebokeng 35 829<br />

Evaton 26 764<br />

Evaton Small Farms 10 613<br />

Boitumelo 3 645<br />

Zone 24 481<br />

Kanana 1 250<br />

Polokong 2 021<br />

Eatonside 1 750<br />

Ironsyde 1 100


Evaton West 13 309<br />

Evaton North 2 451<br />

Lake Side proper 1 500<br />

Lake Side Ext 4 380<br />

TOTAL 122 459<br />

Source: ELM Housing, 2007<br />

9.4.2 Informal Settlement<br />

Table 7.4<br />

Sharpeville 1 298<br />

Bophelong 591<br />

Boipatong 601<br />

Sebokeng Zone 7 230<br />

Zone 17 155<br />

Quaggasstroom & Boiketling 2 000<br />

New Village 569<br />

Cape Gate (Tshepiso) 384<br />

Chris Hani 591<br />

Ironsyde Industrial 457<br />

Polomiet (Tshepiso) 324<br />

Sonderwater 1 216<br />

Tshepisong Taxi Rank (Tshepiso) 675<br />

Winnies Park 217<br />

Vaaloewer 50<br />

Barrage 50<br />

TOTAL 9 408<br />

Source: ELM Housing, 2007<br />

NB: the number of formal housing does not include Vanderbijlpark and Vereeniging<br />

Percentage distribution of households by type of main dwelling.<br />

Table 7.5<br />

Census Community<br />

2001 Survey 2007<br />

House or brick structure on a separate stand or yard 70.6 70.4<br />

Traditional dwelling/hurt/structure made of traditional<br />

materials<br />

1.4 0.5<br />

Flat in block of flats 3.7 4.2<br />

Town/cluster/semi detached house (Simplex, duplex and triplex) 2.3 2.0<br />

House/flat/room in back yard<br />

Informal dwelling/shack<br />

4.3 5.5<br />

In back yard 7.3 8.6<br />

Not in backyard e.g. in an informal/squatter settlement 9.2 6.3<br />

Room/flat let not in backyard but on a shared property 0.9 0.8<br />

Caravan or tent 0.1 0.1<br />

Private ship/Boat 0.2 -<br />

Workers hostel (bed/room) - 1.4<br />

other - 0.2<br />

Total<br />

Source: Community Survey, 2007<br />

100 100<br />

70


Table 7.5 indicates that there has been a slight increase on the house or brick structure<br />

on a separate stand or yard, from 70.6 in 2001 to 70.4 in 2007. There has been an<br />

increase in the number of informal dwelling/shack from 7.3 in 2001 to 8.6 in 2007.<br />

Percentage distribution of households’ tenure status<br />

Table 7.6<br />

Census<br />

2001<br />

Community<br />

Survey<br />

2007<br />

Owned and fully paid off 34.9 38.7<br />

Owned but not yet paid off 21.6 14.9<br />

Rented 24.0 21.1<br />

Occupied rent-free 19.6 23.8<br />

Other - 1.6<br />

Total 100 100<br />

Source: Community Survey, 2007<br />

Table 7.6 indicates that there has been generally an increase on tenure status of<br />

ownership and fully paid off from 34.9 in 2001 to 38.7 in 2007 but a decrease in rented<br />

accommodation from 24.0 in 2001 to 21.1 in 2007.<br />

9.5 Hostels<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> has five areas that have hostels, which are under the direct<br />

and indirect management of the <strong>Municipality</strong>. These are the following hostels:<br />

• Sebokeng Hostel<br />

• Boipatong Hostel<br />

• Sharpeville Hostel<br />

• Khayelitsha Hostel<br />

• Kwa-Masiza Hostel<br />

9.5.1 Sebokeng Hostel<br />

This hostel is owned by the <strong>Municipality</strong> with a units total of 2 780 and currently<br />

emergency repairs work is under way and the project was delayed due to hostel 1 and 2<br />

residents who had a problem with the last development in Phase 1 . Phase 1 is<br />

proceeding as planned in ward 2 where they are busy with foundations. There would be<br />

66 units upon completion under phase 1. Also 66 more units would be constructed in<br />

ward 17 and a contractor has been appointed already. Both the Province and the<br />

<strong>Municipality</strong> are engaging with residents about this huge development taking place.<br />

9.5.2 Boipatong Hostel<br />

The hostel is owned by the <strong>Municipality</strong> and emergency repairs are in progress at the<br />

hostel. The Work being done related to repair of leakages sewer pipes, etc. The hostel<br />

has 263 units, all these units will be demolished to make way for new development.<br />

There is a process towards the development of this Hostel by the Province jointly with<br />

the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong>.<br />

71


9.5.3 Sharpeville Hostel<br />

Sharpeville hostel is also owned by <strong>Municipality</strong> and it has been occupied by the<br />

families. Some work was done in the area, but residents have raised a concern about<br />

the quality of work done in the area by the contractor. Funding has been approved for<br />

the development of this hostel by the national housing department.<br />

9.5.4 Khayelitsha Hostel<br />

Residents who are in this hostel would be relocated to Sebokeng hostel. There after<br />

this hostel would be demolished. There are less than 16 residents in this hostel, mainly<br />

individuals.<br />

9.5.5 Kwa-Masiza Hostel<br />

The hostel is privately owned and problems experienced in the area have now affected<br />

Council’s service delivery programme within the hostel. There is a huge problem<br />

regarding health and hygiene, attributed to deplorable living conditions within this hostel.<br />

The issue of great concern is; there are thousands more people staying in the hostel,<br />

which could soon be a Council problem. Currently, the owners owe the Council millions<br />

of rand on arrears and this may lead to the <strong>Municipality</strong> taking over the management of<br />

this hostel. The council has taken a decision to expropriate the hostel. The process is<br />

underway and the legal department is dealing with it .It is suggested that when the<br />

expropriation process is completed, the hostel will be renovated and turned into family<br />

units. Those that qualify for housing subsidy and employed will be able to acquire their<br />

own flats in the property.<br />

9.5.6 Old Vereeniging Hospital<br />

The hospital is owned by the provincial department of public works and has since been<br />

illegally occupied by thousands of people. Due to the worst conditions of this hostel, a<br />

R100 000 grant has been made available by the Gauteng Department of Housing. The<br />

grant is for a feasibility study in the Hostel to determine its future. The Lekoa consulting<br />

engineers has been appointed to conduct the feasibility study. There is a land in<br />

Tshepiso ext 4 that has been earmarked for relocation of the residence pending the<br />

results of the feasibility study. The property itself might be used for variety of other things<br />

such as school, business etc<br />

9.6 Urban Renewal/Evaton Renewal (project)<br />

The Evaton area, in view of it is historical significance, huge services backlogs,<br />

imbalanced social- and economic opportunities, housing backlogs and land restitution<br />

process was identified and declared as an Urban Renewal project.<br />

In 2004,Evaton was chosen as one of the townships that required regeneration. Evaton<br />

has been selected by the provincial government mainly because it symbolizes the reality<br />

of black townships with low economic activities, disjointed spatial plan and deteriorated<br />

municipal services.<br />

The initial years of Evaton renewal dealt with collating information and dealing with<br />

planning issues. This was deliberate to make sure that subsequent work is well<br />

structured and driven from a solid technical and informed base.<br />

72


The 2008/09 progress report has updated on the actualization of business plan for the<br />

Evaton renewal project.<br />

The scope of Evaton renewal is defined by the following areas:<br />

• Intergrated planning and development<br />

• Rationalizing land use<br />

• Managing open space and densifying in –fills<br />

• Creating well structured road networks and effective local transport routes<br />

• Adequate and decent houses<br />

• Adequate social infrastructure<br />

• Redeveloping and upgrading dilapidated infrastructure<br />

• Preserving local charactaristics<br />

• Enhancing townscapes<br />

The development framework for Evaton emphasises 5 precincts that enable structured<br />

development. These are:<br />

• Western precinct<br />

• Eastern precinct<br />

• Government and sport precinct<br />

• Heritage Precinct<br />

• Overarching precinct<br />

9.6.1 Progress Report on Evaton Renewal<br />

9.6.1.2 Summary of Project Achievements to date<br />

9.6.1.3 Planning & Institutional Issues<br />

a) Environmental impact assessment Draft report released to all I & APs<br />

(Interested and affected parties)<br />

b) <strong>Local</strong> Spatial Development Framework completed and approved by<br />

council on the 6 th of December 2007.<br />

c) Land use survey completed.<br />

d) Market survey completed.<br />

e) Aerial mapping completed.<br />

f) Precinct plans for Government & Sports, West and East precincts were<br />

completed and approved by council on the 6 th of December 2007.<br />

g) The Model of the entire Evaton development was completed ahead of the<br />

Business Partnership Dinner which was held on the 8 th of May 2008 at<br />

Moyos Restaurant.<br />

h) Business Plan for period 2008 – 2011 encompassing detailed precinct<br />

planning was finalized.<br />

i) Funding agreement JSG has been achieved. A copy of the ERP Business<br />

Plan for 2008 to 2011 has also been submitted to ABSA.<br />

j) NDPG application for additional funding has been submitted.<br />

k) Established partnerships with funders and developers.<br />

l) Strong buy-in & partnership by the three spheres of government (<strong>Local</strong>,<br />

District & Provincial).<br />

73


m) A better understanding and partnership with community of Evaton (a<br />

number of events, public, meetings etc helped achieve this).<br />

9.6.1.4 Housing<br />

a) Land owned by council has now been released for development. Approval<br />

for this was granted on the 6 th of December 2007.<br />

b) Land acquisition through land release has been initiated and to date 18<br />

have been registered and 10 of them have been paid for.<br />

c) Willing sellers (land release) have signed power of attorney to allow<br />

transfer process and commencement of subdivision process.<br />

d) Approval processes meeting with <strong>Emfuleni</strong> was held to ensure that<br />

approvals on all submissions are prioritized.<br />

e) Of 19 stands submitted to <strong>Emfuleni</strong> for sub-division approvals, 6 have<br />

been approved so far and awaiting SG approval on 4 of the 6.<br />

9.6.1.5 Technical aspects<br />

i) Bulk water and sewer master plan completed.<br />

ii) Storm Water and Flood Master Plan are almost complete. Preliminary<br />

report available.<br />

iii) Electrical Network Development Master Plan almost complete.<br />

iv) Plans have been approved for the construction of the Mafatsane<br />

Government and Sport complex and construction is now underway.<br />

v) Planning work for Housing Densification i.e. site evaluation, sub-divisions<br />

& rezoning survey process, Geotech and NHBRC enrollment process are<br />

ongoing.<br />

vi) Planning work show houses, housing upgrades & TRV’s done and plan<br />

submitted. Awaiting NHBRC approval. Sites handed over to contractor.<br />

vii) Application for exemption of EIA requirement for brick making have been<br />

achieved.<br />

9.6.1.6 Construction<br />

i) Completed construction of Union roads, Falcon road, Eagle road,<br />

Selbourne Road & Evaton road completed. Adams road currently at 99%.<br />

ii) 30 km grading of gravel roads is 100% completed within budget.<br />

iii) Housing upgrade & TRV’s – Site handed over to contractor.<br />

iv) Tshepo Themba – final site handover and completion certificate issued by<br />

the architect.<br />

9.6.1.7 Communication<br />

i) ERP website is now live.<br />

ii) Evaton Newsletter publication is now in circulation.<br />

iii) Business Partnership dinner to woo business people into investing in<br />

Evaton was held on the 8 th of May 2008.<br />

iv) Evaton brand developed and approved for use by the EDF.<br />

v) Social Facilitation – there are ongoing meetings and discussions with the<br />

EDF and the Evaton community.<br />

vi) Evaton community blitz was held on the 23 rd of August 2008. The purpose<br />

of the blitz forms part of the ongoing objectives to raise the profile of the<br />

74


ERP and enlighten the Evaton community of the developmental<br />

programmes with a special emphasis on Housing and Land release.<br />

9.6.1.8 <strong>Local</strong> Economic Development<br />

i) Compilation of LED Strategy document is in progress.<br />

ii) Two Hydroponic and organic gardening project sites successfully<br />

implemented and continue to grow.<br />

iii) A labour desk and business desk for registration of SMME’s and the<br />

unemployed have been set up.<br />

iv) Waste Management – plan for dustbin rollout was completed and<br />

approved by DOH. Phase 1 and 2 rollout totaling 13,223 bins is complete.<br />

v) Grass cutting project for 2008 has been wrapped up.<br />

9.6.1.9 Summary of Project Current Activities<br />

i) Planning & design for phase 2 roads.<br />

ii) Tender stage for Roads Paving in progress.<br />

iii) Additional work on roads – Adams road street lighting & paving is in<br />

progress.<br />

iv) Overarching Environmental impact assessment is ongoing and is set to<br />

be completed by end of October 2008.<br />

v) NHBRC enrolment.<br />

vi) Phase 1 housing upgrade/construction & refurbishments in the<br />

overarching precinct.<br />

vii) Planning and design work for other precincts.<br />

viii) Land acquisition from municipality & private owners, registration &<br />

transfers.<br />

ix) Beneficiary registration & administration.<br />

x) Land restitution (confirmation of restorable & non-restorable).<br />

xi) Bulk water and sewer infrastructure upgrade.<br />

xii) Phase 3 dustbin rollout (9210 dustbins).<br />

xiii) Finalize procurement of 4 refuse removal trucks.<br />

9.7 Twenty Prioritised Township Programme (20 ptp)<br />

Old townships established before 1994 and are regarded as township excluded by<br />

design. The citizens in these townships are locked into poverty traps reinforced by:<br />

• Shortage of local jobs<br />

• Insufficient transport access to employment opportunities<br />

• Lack of social networks<br />

• Lack of educational qualification and skills<br />

• Culture of poverty<br />

Common characteristics of areas excluded by design<br />

• Apartheid townships<br />

• High poverty and crime<br />

• Formal engineering infrastructure installed but decayed and in need of rehabilitation /<br />

upgrading<br />

• Mainly formal housing stock but also informal housing component.<br />

75


• Need for substantial improvement in maintenance and operating efficiency<br />

• Low in internal economic opportunities<br />

• Low education and skills level of resident population<br />

• The level of services available is disproportional to the needs of resident population<br />

The projects within the 20 PTP will be implemented in Sharpeville, Sebokeng, Boipatong<br />

and Bophelong. The 20 PTP supports the Gauteng Growth and Development Strategy<br />

and the Accelerated and Shared Growth Initiative for South Africa (Asgi-SA). The<br />

following are a list of directives based on 20 PTP:<br />

• Beautifying the townships<br />

• Providing decent schools<br />

• Providing clinics<br />

• Providing sport and recreational facilities<br />

• Providing lighting<br />

- Streets<br />

- All formal houses<br />

• Providing adequate storm water drainage systems<br />

• Roll out of MPCC’s<br />

• Providing libraries<br />

• Providing taxi ranks<br />

• All roads in these townships to be tarred by 2009<br />

• Each area has a vibrant commercial and transport hub<br />

The four (4) townships that have been identified in <strong>Emfuleni</strong> as part of the 20 PTP are:<br />

Boipatong (Wards 3, & 8), Bophelong (Wards 6, 7 & 23), Sharpeville (Wards 12, 13, 14<br />

& 22), and Sebokeng (Wards 2, 17, 30, 31, 32, 33, 34, 35 & 36).<br />

9.7.1 The Status Quo Report:<br />

9.7.2 Sharpeville<br />

Already 20PTP projects have been identified that aims to beautify the Sharpeville<br />

township by focusing on some of the open public spaces that require immediate<br />

aesthetic improvements.14 Projects have been identified with an estimated budget of<br />

R13 100 000.The projects varies from beautifying Entrances and several areas with<br />

specific street names where parks will be established.<br />

The George Thabe precinct and the Sharpeville human rights precinct have also been<br />

identified as the main developmental ventures in Sharpeville with great tourist potential.<br />

There are challenges that the status quo report identified that faces each project site<br />

9.7.3 Boipatong<br />

11 20PTP projects have been identified with an estimated budget of R 6 800 000.The<br />

aim is also to beautify the Boipatong township by focusing on some of the open public<br />

spaces that require immediate aesthetic improvements. The projects varies from<br />

beautifying entrances, Community hall, intersections, Soccer field, pavements, multipurpose<br />

centre, cemetery and parks. There are challenges that the status quo report<br />

identified that faces each project site.<br />

76


9.7.4 Bophelong<br />

9 20PTP Projects have been identified for Bophelong with an estimated budget of<br />

R8 025 00, Also with the aim to beautify the Bophelong township by focusing on some of<br />

the open public spaces that require immediate aesthetic improvements. The projects<br />

varies from beautifying entrances, intersection, clinic, disability centre, community library,<br />

Seeiso primary school, park, sport stadium ,soccer field, community hall and a park.<br />

There are challenges that the status quo report identified that faces each project site<br />

9.7.5 Sebokeng<br />

9 20PTP projects have also been identified for Sebokeng with an estimated budget of<br />

R8 600 000,<br />

Also with the aim to beautify the Sebokeng township by focusing on some of the open<br />

public spaces that require immediate aesthetic improvements. The projects varies from<br />

beautifying entrances, parks, multi-purpose centre, library, sports centre and sports field.<br />

There are challenges that the status quo report identified that faces each project site.<br />

9.8 Neighbourhood Development (Partnership Grant)<br />

9.8.1 A brief look at Sharpeville<br />

9.8.2 A case study<br />

Sharpeville is one of the oldest in the Vaal. It was established in 1935 as a relocation of<br />

black people from Top Location which was considered to close to Vereeniging town<br />

centre. Presently Sharpeville has a population of 41 000 people. The area is<br />

characterized by old municipal built homes at the centre with newly built dwellings on the<br />

periphery. The biggest challenge facing the residents of the area is unemployment. The<br />

2001 Census figures show that 7,160 people were employed while 10705 were<br />

unemployed and 11666 were not economically active. Household income statistics also<br />

show that 28,644 households had no income whatsoever. The age profile of the area<br />

also shows a large concentration of young people in the area. The need to create<br />

employment and economic opportunities in Sharpeville is critical to avoid a social<br />

collapse. The current 60% unemployment level must be addressed by investing in<br />

economic node within the area. The Sharpeville precinct, Seeiso Street corridor and<br />

Sharpeville Dam area present the best opportunities to stimulate economic activity. The<br />

relatively good infrastructure of the area should also be used as a platform upon which<br />

this economic regeneration can be built.<br />

In Sharpeville, the Sedibeng District <strong>Municipality</strong> and <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> own<br />

and manage a number of public facilities in close proximity to each other. These include:<br />

6000 seater George Thabe Stadium and environs which includes a cricket pitch and<br />

other dilapidated sport facilities;<br />

• A vacant ‘circle';<br />

• A burnt down Sharpeville Hall but with strong foundations and significant heritage<br />

potential;<br />

77


• A library and community centre;<br />

• Retail facilities on council land;<br />

• The Sharpeville Monument and exhibition centre.<br />

In the proximity of these facilities are very old and heritage churches, schools and clinics<br />

and nearby is the Sharpeville Dam along which the ELM also owns land. The Sharpeville<br />

Police Station which adjoins the monument is in the process of being decommissioned<br />

and transferred to the SDM for heritage or community facilities.<br />

It is the intention of the SDM in co-operation with the ELM to consider the development<br />

of the following precinct projects for 2010 and beyond:<br />

• George Thabe Stadium and environs into a multi-purpose sport and recreation<br />

facility, including upgrading George Thabe Stadium so that it meets at least PSL<br />

requirements;<br />

• The Sharpeville exhibition and monument into an iconic and professionally run<br />

exhibition centre including possibly the Sharpeville Police Station;<br />

• The Sharpeville Hall into an arts, culture and cinema complex. The Sharpeville Dam<br />

into a recreational facility; and<br />

• Seeiso Street that runs from the monument to the dam into a mixed use 'high street'<br />

or boulevard.<br />

Since these facilities are in close proximity it is proposed to take a precinct approach and<br />

seek a development partner who would develop a plan for the entire area although<br />

different projects may be undertaken with different funding and time-frames. The projects<br />

relating to the exhibition centre should be finished by 2010 and the George Thabe<br />

Stadium ideally so. Projects around the churches, dam and Seeiso Street could have a<br />

longer time-frame. However, for the different projects to be successful they should be<br />

guided by a long term urban design framework and there would need to be improved<br />

urban management for the entire area. The Sedibeng District <strong>Municipality</strong> is seeking to<br />

secure funding from the National Treasury's Neighbourhood Partnership Grant as well<br />

as provincial funds for certain projects within the precinct if not for a comprehensive<br />

regeneration plan. These assets are all owned by the Sedibeng and <strong>Emfuleni</strong> <strong>Local</strong><br />

<strong>Municipality</strong> and are in the immediate vicinity where 69 people were killed in 1960 and<br />

which symbolized a turning point in the South African struggle for human rights.<br />

The project is also aimed at ensuring that communities from Boipatong and Tshepiso<br />

also benefit. The project is will thus contribute to rejuvenating the entire Urban fabric of<br />

the Vaal area. The project falls within the Gauteng Top 20 Townships Programme run by<br />

Provincial Housing<br />

• Seeiso taxi route<br />

Within the township (3km Vereeniging from CBD)<br />

• Sharpeville Precinct development<br />

Within the township (3km Vereeniging from CBD)<br />

• Educational Infrastructure<br />

The following schools are identified as 20 PTP projects for improvement on the<br />

existing infrastructure:<br />

• Lehlasedi Primary Refurbishment<br />

78


• Seliba Primary Refurbishment<br />

• Thutolore School – Secondary Refurbishment<br />

• Itsose Primary Refurbishment<br />

9.8.3 Human Settlement<br />

Larger subsidized housing developments is continuing to establish on the periphery / or<br />

as natural extensions to Historically Disadvantaged Areas.<br />

There is lack of innovative and integrated housing developments which makes provision<br />

in accommodating different socio-economic sectors of our community linked to different<br />

housing typologies. The total housing backlog for <strong>Emfuleni</strong> is estimated at 42 894 units.<br />

9.8.4 Informal Settlements<br />

Informal residential settlements can be defined as settlements that do not have any<br />

formal town-planning structure and have limited to no access to basic engineering<br />

services such as water, sewerage and electricity. Basic shelter structures within these<br />

settlements are mostly shacks. The areas that are formalised are as follows: Total of 17<br />

Informal Settlements with 8872 structures of which 5 Informal settlements (Cape Gate,<br />

Ironsyde Industry, Old Vereeniging Hospital, Soul City and Tshepiso Taxi Rank) are in<br />

process of being formalise<br />

79


CHAPTER 10<br />

10.1 Water and sanitation services<br />

10.1.1 Metsi-a-Lekoa<br />

Metsi utilises immovable and movable assets of the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> for the<br />

distribution of potable water, collection and conveyance of wastewater and the treatment<br />

of waste water. In addition to these functions Mets-a-Lekoa is responsible for the<br />

maintenance of the water services system and all costs associated with all the assets<br />

including maintenance, insurance, licensing and running costs.<br />

The water system consists of pipe networks, 10 low level reservoirs, and a small potable<br />

water treatment plant. The sanitation system consists of gravity pipelines and 48<br />

sewage pump stations and their pumping mains. The wastewater treatment system<br />

consists of three wastewater treatment works. The largest of the wastewater treatment<br />

works being operated is the Sebokeng water treatment facility with a capacity of<br />

116Ml/day.<br />

In addition to the above, Metsi-a-Lekoa has a Planning section and provides a proactive<br />

customer care service.<br />

Free Basic Water<br />

Every household at <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> receives 6 kilolitres of free basic water<br />

each month. However, people who have registered as indigents receive free basic water.<br />

10.2 Achievements<br />

During the 2007/8 financial year the following major projects were undertaken:<br />

Project Name Project Cost Description<br />

Quaggasfontein water<br />

and sewer<br />

Repair, Upgrade<br />

Maintenance WCW's<br />

(Short Term) in the<br />

whole of <strong>Emfuleni</strong> Area<br />

Repair, Upgrade<br />

Maintenance of Sewer<br />

System P/S (Short<br />

Term) in the whole of<br />

<strong>Emfuleni</strong> Area<br />

Bulk water to<br />

Sonderwater<br />

R 43,000,000 Installation of new bulk water and<br />

sanitation infra-structure. Part of R145m<br />

project<br />

R 24,000,000 Repair and upgrade of Waste Water<br />

Treatment Works, Leeuwkuil and<br />

Rietspruit<br />

R 6,500,000 Rehabilitation pump stations<br />

R586,400.00 Provision of bulk water to new<br />

development of 1200 stands<br />

Water Demand R10,500,000 Water awareness, water demand<br />

installations and water meters<br />

TOTAL R 84,586,400<br />

80


10.3 Backlogs in Service Delivery<br />

There are no backlogs in the supply of potable water. The only additional water<br />

connections that have been provided were to cope with growth in informal settlements.<br />

By providing water connections in new housing development don’t eliminate any<br />

backlogs in the supply of potable water since the beneficiaries of these houses are<br />

relocated from informal settlements were they had access to the minimum service.<br />

The provision of a basic level of sanitation service, i.e. VIP’s, is not acceptable to the<br />

communities living in informal settlements and it is not practical and sometimes<br />

impossible to provide a higher level of sanitation service in these settlements. The<br />

sanitation backlogs in the informal settlements can therefore not be eliminated.<br />

Provision of new housing developments does, unlike in the case of water service<br />

delivery, eliminate backlogs in service delivery in sanitation. Hence 400 of the 11,500<br />

sanitation backlog were eliminated with the Thepiso housing development.<br />

Sewage buckets have been eliminated in 2003 and the municipality is not delivering<br />

such service since that date. Any people still using sewage buckets are doing so at their<br />

own free will and disposal is most probably done illegally.<br />

A major concern in service delivery is the 63 500 households living in shacks in the<br />

backyards of big stands in mainly Evaton. These households make use of unimproved<br />

pit latrines and, if allowed by the owner of the stand, obtain water from the owner’s<br />

house. Since this is on private property the <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> can not provide<br />

any kind of service, except for the main service networks available on the boundary of<br />

these stands, to these backyard shack dwellers.<br />

10.4 Standard of Service<br />

Sewage pump stations needs additional funding to keep operational till the long term<br />

Sedibeng regional Sanitation Scheme of R1.2b are operational. Rietspruit and Leeuwkuil<br />

wastewater treatment works has been upgraded and rehabilitated to attain compliance<br />

with the environmental and legal requirements. Upgrading of these started in 2007 and<br />

are planned for completion December 2008.<br />

Low water pressure in the water supply system in Palm Springs has been a problem for<br />

a number of years and was partially resolved in 2006/7 by the installation of an<br />

additional ring feed. However the problem will only be eliminated with the installation of<br />

a separate Rand Water supply dedicated for Palm Springs during the 2007/8 financial<br />

year.<br />

10.5 Municipal Spending on Service Delivery Infrastructure<br />

Ample funds in the form of grants (MIG, DWAF and Restructuring Grant) and new<br />

housing developments (funded by the Department of Housing) are available to spend on<br />

the provision of new infrastructure. However funds for the systematic replacement of<br />

existing water networks, water meters and other related infrastructure elements and for<br />

the systematic cleaning of the sewer networks are not being made available. Although<br />

the effect of this on the standard of service delivery is not visible at this stage, the<br />

delaying of these systematic replacement and maintenance actions could have<br />

catastrophic effects in the near future.<br />

81


Only 63% of the Operations Units approved post have been filled. This results in a lack<br />

of proper management, supervision and maintenance of the water and sanitation service<br />

delivery infrastructure.<br />

Due to “cash flow problems” the availability of funds allocated on the operational budget<br />

is a major problem in paying suppliers of material and services required for service<br />

delivery.<br />

10.5.1 RELATING BACKLOGS TO MUNICIPAL SPENDING ON SERVICES<br />

10.5.2 Water Backlogs<br />

2.3.1 Water<br />

Backlogs<br />

Water<br />

Backlogs (6Kl<br />

per month)<br />

Backlogs to be<br />

eliminated (No.<br />

Households Not<br />

Receiving<br />

Minimum<br />

Standard of<br />

Service)<br />

Backlogs to be<br />

eliminated<br />

(Percentage -<br />

Households<br />

identified as<br />

backlogs / total<br />

Households in<br />

<strong>Municipality</strong>)<br />

Spending on<br />

New<br />

infrastructure to<br />

Eliminate<br />

Backlogs (Rand<br />

000)<br />

Required<br />

30 June 2007<br />

Budgeted<br />

Actual<br />

Required<br />

30 June 2008<br />

Budgeted<br />

Actual<br />

0 0 0 50 500000 500000<br />

0.01 0 0 50 500000 500000<br />

24000000 24000000 24000000 30000000 30000000 30000000<br />

82


Spending on<br />

Renewal of<br />

Existing<br />

Infrastructure to<br />

Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Spending on<br />

Maintenance to<br />

Ensure No New<br />

Backlogs<br />

Created (Rand<br />

000)<br />

10.6 Sanitation<br />

25000000 25000000 25000000 35000000 35000000 35000000<br />

0 0 0 50 500000 0<br />

50000000 5000000 5000000 50000000 5000000 5000000<br />

Basic sanitation standards are determined for improving quality of life, to meet basic<br />

health requirements and to protect water resources from pollution. There is currently a<br />

moratorium on development along the Vaal River imposed by Rand Water due inter-alia<br />

to the lack of adequate sanitation infrastructure. Polluted rivers hamper the attraction of<br />

tourists for water tourism of which the main attractions are the Vaal River and Klip River<br />

and as a result compromise developments along their banks. Infrastructure in some<br />

areas is more than 100 years old. The district was gaining bad publicity for spillage of<br />

raw sewage and the discharge of non-compliant effluent in the Vaal River. This<br />

phenomenon created a negative impact on the health and safety of residents and<br />

restricted the potential of the region to grow and attract investors and tourists. The<br />

problem of raw sewage spillages and discharge of non-complaint effluent has been a<br />

significant problem for the Vaal River and its environs for many years. The residents<br />

along the vaal river have taken the municipality to court over these problems and the<br />

court case is currently underway. The areas affected by this problem include<br />

Vereeniging and Vanderbijlpark.<br />

An investigation into the causes of the spillages was undertaken and remedial action<br />

was immediately embarked upon. This remedial action essentially involved the<br />

refurbishment of the existing infrastructure.<br />

However during the course of the investigation it soon became apparent that these<br />

emergency interim remedial measures would not be adequate to satisfy the longer term<br />

needs and development of the area, as the existing infrastructure was found to be very<br />

old and unreliable, with a strong possibility of further large scale failures in the future.<br />

As a result further investigation was carried out to determine the best possible long term<br />

solution. Several case studies were considered which has ultimately led to the<br />

recommendation of a proposal which will eliminate pumping stations and involve the<br />

construction approximately 100 km of new gravity sewer lines and a new 75 Ml/d Waste<br />

Water Treatment Works (DWAF, 2007).<br />

83


10.6.1 Access to sanitation<br />

AREA<br />

Total<br />

Stands<br />

Full borne<br />

supply<br />

Self<br />

supply<br />

SEWER<br />

Basic<br />

supply<br />

No service<br />

Residential<br />

Urban<br />

Residential Rural<br />

141000 140000 0<br />

(Agricultural and<br />

Farms)<br />

5250 5250<br />

Industries 1500 1500<br />

Informal<br />

Settlements<br />

11200 11200<br />

TOTAL 158950 141500 5250 0 11200<br />

10.7 Sewer Works<br />

With the exception of the Sebokeng waste water treatment works, those of Rietspruit<br />

and Leeuwkuil are, at times, unable to cope with large volumes of sewage.<br />

Waste Water<br />

treatment works<br />

Catchments Details<br />

Rietspruit Vanderbijlpark, Boipatong 23Mℓ/d. Discharges into the<br />

Rietspruit and Vaal River (below<br />

the Barrage)<br />

Leeuwkuil Vereeniging, Sharpeville, 32Mℓ/d. Capacity discharges into<br />

Tshepiso<br />

the Vaal River.<br />

Sebokeng Sebokeng, Evaton, Palm 119Mℓ/d. Capacity discharges<br />

Spring, Orange Farm and<br />

areas of Johannesburg<br />

into the Rietspruit.<br />

Source: NWU, 2007 (Gouws, et al 2007)<br />

10.7.1 Sanitation Backlogs<br />

2.3.2<br />

Sanitation<br />

Backlogs<br />

Backlogs to<br />

be eliminated<br />

(No.<br />

Households<br />

Not<br />

Receiving<br />

Minimum<br />

Standard of<br />

Service)<br />

Required<br />

30 June 2007<br />

Budgeted<br />

Required<br />

Budgeted<br />

30 June 2008<br />

Required<br />

Budgeted<br />

11500 0 0 11500 0 0<br />

84


Backlogs to<br />

be eliminated<br />

(Percentage -<br />

Households<br />

identified as<br />

backlogs /<br />

total<br />

Households<br />

in<br />

<strong>Municipality</strong>)<br />

Spending on<br />

New<br />

infrastructure<br />

to Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Spending on<br />

Renewal of<br />

Existing<br />

Infrastructure<br />

to Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Total<br />

Spending to<br />

Eliminate<br />

Backlogs<br />

(Rand 000)<br />

Spending on<br />

Maintenance<br />

to Ensure No<br />

New<br />

Backlogs<br />

Created<br />

(Rand 000)<br />

6.3% 0 0 6.3% 0 0<br />

24000000 24000000 24000000 30000000 30000000 30000000<br />

25000000 25000000 25000000 35000000 35000000 35000000<br />

2500000 2500000 2500000 2500000 2500000 2500000<br />

50000000 5000000 5000000 50000000 5000000 5000000<br />

85


CHAPTER 11<br />

11.1 WASTE AND LANDFILL MANAGEMENT<br />

Level and standard of services including backlogs and challenges of Services<br />

All formal housing areas are currently being provided with a sustainable weekly<br />

household collection service, providing services to 143 214 households.<br />

The only backlog in the provision of sustainable household collection services is to the<br />

informal housing areas of council. The backlogs to informal households are 30 777<br />

(Stats SA Households 2007) and nothing was addressed in the financial year due to bad<br />

or no roads available to service communities on a sustainable weekly basis.<br />

Removal of illegal dumps is now being done on a continuous roster to include all wards<br />

and an average turn around time of 4 to 5 weeks per week.<br />

Due to the impact of replacing vehicles program the backlogs to service delivery to<br />

especially household collection decreased from 65 % backlogs registered per week to<br />

45% registered at 30 June 2008.<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> has an integrated waste management plan which is the<br />

same as Sedibeng. The plan is pending Council approval.<br />

11.1.2 Infrastructure<br />

None of the operational Landfill sites are permitted for operations and final closure<br />

processes. Approved MIG funding provided for the procedures to be put in place are<br />

being executed on all landfill sites in multi years projects explained above.<br />

The total of business plans submitted and are pending, will also focus on upgrades and<br />

new establishments in terms of mini dump / transfer stations and landfill sites for the<br />

following 3 years.<br />

Challenges<br />

In order to ensure the sustainability of the provision of waste and landfill to all the<br />

municipality’s residents it essential that<br />

• Sufficient capital is made available for infrastructure upgrading and new<br />

expansions.<br />

• Implement the Landfill gas to energy project.<br />

• Establish a composting facility to reduce the garden waste stream.<br />

• Finalize the master plan for the development of the Waste and Cemeteries<br />

infrastructure<br />

• Meet the demand for waste services by developers.<br />

• The recruitment process is streamlined to ensure that vacant positions are filled<br />

without delays.<br />

• The procurement or supply chain processes be fine tuned to ensure that projects<br />

can be implemented within the year that they were budgeted for.<br />

86


• That staff be trained to understand their role within the whole supply chain of<br />

providing waste and cemeteries and other services to improve service delivery to<br />

and communication with the customers / residents.<br />

• Reduce the number of complaints regarding waste collection and illegal dumps.<br />

• If approved by Council, change over from a bag system of collection to<br />

implement a formal 240 litre container service for the entire <strong>Emfuleni</strong> area for the<br />

next 3 financial years.<br />

11.1.3 Refuse Removal Backlogs<br />

2.3.3 Refuse<br />

Removal<br />

Backlogs<br />

Backlogs to be<br />

eliminated (No.<br />

Households Not<br />

Receiving Minimum<br />

Standard of<br />

Service)<br />

Backlogs to be<br />

eliminated<br />

(Percentage -<br />

Households<br />

identified as<br />

backlogs / total<br />

Households in<br />

<strong>Municipality</strong>)<br />

Spending on New<br />

infrastructure to<br />

Eliminate Backlogs<br />

(Rand 000)<br />

Spending on<br />

Renewal of Existing<br />

Infrastructure to<br />

Eliminate Backlogs<br />

(Rand 000)<br />

Total Spending to<br />

Eliminate Backlogs<br />

(Rand 000)<br />

Spending on<br />

Maintenance to<br />

Ensure No New<br />

Backlogs Created<br />

(Rand 000)<br />

Required<br />

21,500<br />

households<br />

11.1.4 Other legislative issues<br />

30 June 2007<br />

Budgeted<br />

Required<br />

Budgeted<br />

3,159,917 3,152,800 R0<br />

14,54% 0 0 17,69%<br />

5,650,000 1,042,485 661,595 1,619,500<br />

23,104,657 22,704,657 20,923,111 11,107,000<br />

28,754,657 23,747,142 21,584,706 12,726,500<br />

193,396 193,396 104,953 262,840<br />

30 June 2008<br />

Required<br />

30 777<br />

households<br />

Budgeted<br />

87<br />

R0<br />

0 0<br />

300,490 675,480<br />

2,142,311 4,312,019<br />

2,442,801 4987,499,<br />

100,719 262,840<br />

• In terms of legislation, Sedibeng (for and behalf of the District and the <strong>Local</strong><br />

Council’s) compiled the first Draft Integrated Waste Management Strategy.


Restructuring Grant funding (R1, 000,000) was also obtained to amend the existing<br />

draft Integrated Waste Strategy (to include issues of the new Waste Bill promulgated<br />

in 2007). A Section 77 / 78 procedure to enable Council to proceed with the ring<br />

fencing and appointment of SMMEs will also be dealt with during the<br />

2007/2008/2009/2010 financial years.<br />

• None of the current operational transfer stations / mini dumps (4 in Vereeniging) is<br />

licensed for operations. The IDP did mention this issue since 2003/2004 and<br />

although an application was submitted to MIG for funding, the results are still<br />

pending. The licence and operation requirements will also result in urgent upgrading<br />

of infrastructure and may also include the appointment of a contractor(s) to operate<br />

the sites in terms of the minimum requirements.<br />

11.1 5 Recycling initiatives<br />

• Recycling: Only Boitshepi Landfill site have 350 re-claimers that are currently<br />

working on the site on an informal basis<br />

• Palm Springs Landfill Site has 200 reclaimers supported by <strong>Emfuleni</strong> <strong>Local</strong><br />

<strong>Municipality</strong> using a five tonne truck which was purchased through Bontle– ke –<br />

Botho fund. The other areas which are recycling at <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

include Zone 7 Sebokeng, Polokong, Wayside park, Evaton West, Vereeniging CBD,<br />

Tshepiso, Zone 16, Three Rivers, Bophelong and Zone 14 shopping complex.<br />

• A second truck launched on 11 September 2008 is being utilized for Southern zones<br />

of <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong>.<br />

11.1.6 Summary of Total Volumes of Recyclable Materials<br />

All waste collected for recycling, are from household, business, schools, offices etc. All<br />

the collected recyclable materials are collected and sold to the companies for the remanufacturing<br />

of re-usable materials and also generate income for the unemployed<br />

families.<br />

Table: Summary of Recyclable Materials<br />

Reclaiming initiatives from Palm<br />

Springs Landfill site<br />

Description<br />

of material<br />

collected<br />

Average monthly<br />

m² of material<br />

collected<br />

Reclaiming initiatives: Bontle Ke<br />

Botho projects<br />

Description of<br />

material<br />

collected<br />

Average monthly<br />

m² of material<br />

collected<br />

Plastic 138.6 Plastic 127.6<br />

Coke Bottles 226.2 Coke Bottles 139<br />

Milk Bottles 182.6 Milk Bottles 132.8<br />

Hard Plastic 41.2 Hard Plastic 56.2<br />

White Paper 10.6 White Paper 17.6<br />

Card Box 94.8 Card Box 196.8<br />

Scrap Metal 68.4 Scrap Metal<br />

Glass 34 Glass 9.8<br />

88


11.1.7 Extending services to new areas<br />

In terms of sustainable weekly household services, it is foreseen that the following areas<br />

will be included for sustainable service delivery for the 2008/2009 financial year.<br />

• Sebokeng Region partial service delivery to:<br />

• Sonderwater 963 Stands<br />

• Tshepong 963 Stands<br />

• New village 250 Stands<br />

• Lethabong 6,402 Stands<br />

Vanderbijlpark region partial service delivery to:<br />

• Tshepiso ext. 4 4,597 Stands<br />

• S.E.5. 1,751 Stands<br />

• Flora Gardens – Eagles Nest 698 Stands<br />

• CE5 384 Stands<br />

• CE7 2,521 Stands<br />

• Sylviavale / Mantevrede SW7 226 Stands<br />

• SE8 1,300 Stands<br />

• Chris Hani 1 195 Stands<br />

The new services will be incorporated in the respective areas mentioned above in the<br />

2007/2008, 2008/2009 and 2009/2010 financial years as and how the developments are<br />

transferred to owners.<br />

11.2 Other initiatives<br />

On average, the Boitshepi Landfill site handles 25,000 to 30,000 tons of waste disposed<br />

of per month from mainly Vanderbijlpark, Bophelong, Boipatong, Tshepiso, Sharpeville<br />

and Bedworthpark areas.<br />

It is estimated that the available airspace will run out in two years, whilst it can take up to<br />

4 years before a new landfill site will be in place. In a nutshell, it simply means that<br />

Council will have to export and pay for disposal of refuse at other sites (outside the<br />

borders of this Council) if initiatives is not put in place during this financial year to<br />

conserve as much of airspace as possible.<br />

Steps already implemented: All of the refuse from Sebokeng have now been re-routed<br />

to be disposed of at the Palm Springs site and most of the refuse from the Vereeniging<br />

region are now disposed of at the Waldrift Landfill site.<br />

Steps to be implemented as a critical and priority need: Lumpy greens including<br />

trees, branches, and garden waste disposed of by garden services is in the region of<br />

8,500 cubic meters for Vanderbijlpark and 10,000 cubic meters for the Vereeniging<br />

region that is disposed of on Boitshepi and Waldrift on a monthly basis. This does not<br />

include on average 50% of garden waste contained in bags and put out for collection by<br />

residents in the aforementioned areas.<br />

89


All of the greens need to be taken out of the waste stream to be shredded and to make<br />

compost out of and by doing that, the necessary capacity to dispose of refuse can be<br />

extended until the new landfill site is operational. Apart from this critical issue, this<br />

project can enhance job creation and empower SMME’s to start with own businesses.<br />

As the final product is marketable, Council can for example also source in some of the<br />

composted material to be used in the final cover processes of rehabilitation needed on<br />

landfill sites. A report pertaining to this issue will however be submitted to Council by<br />

January 2007.<br />

For this purpose, the need to purchase a combination wood chipper / tyre shredding<br />

machine is seen as essential that can also be utilized to dispose of tyres from industry<br />

and businesses of which there are no other alternative available at present.<br />

11.3 Cleaner Production<br />

Apart from the recycling initiatives mentioned above, DEAT is conducting an Industrial<br />

exchange pilot programme to reduce industrial waste that puts pressure on our landfill<br />

site.<br />

Private contractors dealing directly with Hospitals and medical practices are handling all<br />

medical and sharp related waste. Private contractors transporting hazardous waste<br />

collected from Industries to landfill sites are licensed.<br />

11.4 Waste Disposal<br />

Illegal waste dumping occurs throughout the area.<br />

Natural Environment Issues<br />

� Issues of environmental planning, integrated waste management and pollution<br />

abatement must be addressed as essential ingredients of <strong>Emfuleni</strong>’s<br />

sustainable development as there are direct correlations between these issues<br />

and the economic growth of <strong>Emfuleni</strong>.<br />

� For the successful control of air pollution a number of essential requirements<br />

must be met. The first requirement is to make essential resources, manpower,<br />

available. Training of officials to implement the Act is also a priority.<br />

� The second requirement is a clear picture of the locality, nature and magnitude<br />

of the sources of air pollution and t heir relative significance.<br />

� The third requirement is an understanding of the particular conditions in the<br />

area of <strong>Emfuleni</strong>, which may influence the implementation of the Act.<br />

� Management of landfill sites & transfer stations under capacity<br />

� No landfill site nor the Vereeniging mini dump/transfer stations permitted for<br />

operations<br />

� Transfer stations infrastructure in a poor condition<br />

� No landfill capacity - develop new landfill site<br />

� No mini dump transfer station for Vanderbijlpark / Boipatong & Sharpeville<br />

� Phases 1 and 2 of Waldrift not re-habilitated<br />

� Kwaggastroom, Sharpeville and Zone 20 (borrow pits) closed but not rehabilitated.<br />

� Eradicate illegal dumping<br />

� Pollution (Land, Air and Noise)<br />

90


11.5 Operation Restore Dignity<br />

The Municipal Manager and Executive Mayor introduced Restore Dignity concept. The<br />

project aimed at cleaning the illegal dumping within communities.<br />

The project took place at the following areas:<br />

• Boipatong<br />

• Sharpeville<br />

• Bophelong<br />

• Sebokeng<br />

• Rust-ter-Vaal<br />

The project had a moral support of the members of the communities, councillors and<br />

officials from the council.<br />

During November 2008 ,the mayor ,officials and few councillors embarked on a cleaning<br />

campaign. The Mayor visited the Boitumelo community. The event was well attended<br />

and a cleaning process was embarked on thereafter.<br />

11.6 Challenges<br />

The challenges from the Department relating to the current and consequent 2 outer<br />

years are the following:<br />

• Increased capacity - to address backlogs of sustainable household collection<br />

services (weekly basis)<br />

• Implement and execute all ward based identified projects.<br />

• Reduce illegal dumping<br />

• Capacitate and implement programs to reduce waste streams with re-claiming<br />

initiatives.<br />

• Enhance training of non skilled staff and deal with disciplinary procedures within<br />

the Department.<br />

• Find capital funding (±R35,000,000) to roll out the 240 litre bin system to the rest<br />

of the areas in <strong>Emfuleni</strong> (excluding Evaton region).<br />

• Renew last of existing old fleet.<br />

11.7 Cemeteries<br />

Cemetery management is divided into active and closed cemeteries.<br />

The management of active cemeteries were outsourced to Lekoa Cemeteries (the<br />

service provider), who have entered into Contractual agreement with <strong>Emfuleni</strong> <strong>Local</strong><br />

<strong>Municipality</strong>, which is responsible for administration, operations and maintenance for the<br />

following active cemeteries as follows:<br />

• Sharpeville-Phelindaba<br />

• Vanderbijlpark<br />

• Jacobskop 1& 2, Roshnee<br />

• Rust-ter-Vaal.<br />

91


The burials are conducted on a 7 day week basis from Monday to Sunday. The burial<br />

capacity is gradually getting fuller day by day and to date no land has been identified for<br />

the purpose of establishment new cemetery (current MIG business plan pending). As an<br />

interim measure, the burial capacity for Sharpeville -Phelindaba was extended to<br />

increase with an approximate life span of up to 2 to 3 years.<br />

Current burial space in the Vanderbijlpark cemeteries is reaching full capacity but with<br />

extensions earmarked, additional burial space can be increased with approximate 4 to 5<br />

years for this specific region.<br />

Council is responsible for the maintenance of inactive cemeteries as follows:<br />

• Evaton<br />

• Sharpeville-Vuka<br />

• Vereeniging<br />

• Boipatong<br />

Due to lack of existing infrastructure and insufficient funds, closed cemeteries are<br />

currently being maintained through EPWP programs.<br />

45 Persons were appointed as a special clean up and grass cutting exercise for the third<br />

and fourth quarters of the 2007/2008 financial year. There is a noticeable lot of<br />

vandalism by community on three cemeteries that were fenced recently.<br />

11.8 Environmental Health and Management<br />

Water pollution<br />

The stretch of the river within the boundaries of today’s <strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong>, was<br />

described as a cesspool of toxic waste water. As the hardest working river in South<br />

Africa, thousands of tonnes of industrial and sewage annually flowed into the Vaal River<br />

Barrage catchment area. The catchment is situated largely in Gauteng, one of the<br />

country’s most populated provinces. Economically Gauteng is also the most active<br />

region. Ever-increasing population and a consistently high rate of industrial activity<br />

created conditions conducive to environmental degradation in a riverine region, which at<br />

the start of the twentieth century had been a popular tourist venue for visitors from<br />

Johannesburg. Although no contingency measures were outlined for groundwater<br />

pollution prevention in <strong>Emfuleni</strong>, there are comprehensive measures in place to prevent<br />

surface water pollution. Surface water pollution contingency measures include the<br />

following:<br />

• Standby pumps<br />

• Emergency overflow storage dams at critical pump stations<br />

• Service agreement in place to provide certain technical assistance<br />

• Telemetry system in place at critical pump station<br />

• Manned critical pump stations<br />

92


Changes in climate conditions are generally believed to have an adverse impact on<br />

Service Delivery. The extent of the negative impact is still not clear.<br />

93


CHAPTER 12<br />

12.1 ELM Financial Position<br />

Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

5000000000001 EMFULENI MUNICIPAL COUNCIL ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001000000 EXPENDITURE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001010000 EMPLOYEE/COUNCILLORS RELATED COST ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001020000 EMPLOYEE SALARIES AND ALLOWANCES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001020001 ACTING ALLOWANCE 488,988<br />

2,563,309<br />

3,226,378<br />

3,659,836<br />

3,771,025<br />

3,033,274<br />

3,067,446<br />

3,282,160<br />

5000001020002 BASIC SALARIES 178,050,610<br />

217,694,046<br />

231,354,257<br />

302,354,390<br />

290,241,837<br />

369,137,961<br />

417,125,896<br />

471,352,263<br />

5000001020003 HOUSING ASSISTANCE 19 19,670 670 18 18,000 000 13 13,455 455 ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001020004 HOUSING SUBSIDY 2,789,735<br />

2,952,232<br />

3,750,706<br />

4,147,698<br />

4,147,698<br />

4,954,485<br />

5,598,568<br />

6,326,382<br />

5000001020005 INDUSTRAIL COUNCIL LEVY 76,418<br />

91,002<br />

95,103<br />

100,218<br />

100,473<br />

115,505<br />

130,520<br />

147,488<br />

5000001020006 LEAVE BONUS 14,250,856<br />

15,756,648<br />

17,961,789<br />

23,734,901<br />

23,734,901<br />

23,588,353<br />

26,654,839<br />

30,119,968<br />

5000001020007 OVERTIME 16,073,113<br />

20,329,233<br />

25,864,493<br />

26,096,716<br />

28,800,009<br />

34,202,713<br />

36,473,147<br />

39,343,541<br />

5000001020008 PROVISION FOR SALARY INCREASE 2,408,488<br />

2,517,463<br />

906,951<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001020009 REDEMPTION <strong>OF</strong> LEAVE 9,006,531<br />

0<br />

4,253,397<br />

1,842,614<br />

2,691,468<br />

3,694,782<br />

3,992,939<br />

4,303,206<br />

5000001020010 STANDBY ALLOWANCE 1,186,867<br />

1,849,638<br />

2,358,725<br />

2,675,403<br />

3,004,439<br />

3,160,746<br />

3,359,572<br />

3,560,205<br />

5000001020011 TELEPHONE ALLOWANCE 347,512<br />

626,942<br />

676,984<br />

1,628,241<br />

1,545,541<br />

1,870,456<br />

3,093,697<br />

3,365,217<br />

5000001020012 TRANSPORT ALLOWANCE 15,572,970<br />

18,750,531<br />

19,349,123<br />

23,906,038<br />

22,720,548<br />

22,202,145<br />

25,088,424<br />

28,349,919<br />

5000001020013 U.I.F 1,811,879<br />

2,186,343<br />

2,354,779<br />

2,535,441<br />

2,536,899<br />

2,606,208<br />

2,939,438<br />

3,321,565<br />

5000001020014 SALARY DISPARITIES ‐<br />

‐<br />

‐<br />

5,000,000<br />

8,202,000<br />

5,000,000<br />

‐<br />

‐<br />

5000001029990 SUB‐TOTAL EMPLOYEE SALARIES & ALLOW 242,155,151<br />

285,335,385<br />

312,166,141<br />

397,681,495<br />

391,524,487<br />

473,566,628<br />

527,524,487<br />

593,471,912<br />

5000001030000 EMPLOYEE SOCIAL CONTRIBUTIONS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001030001 GROUP INSURANCE 5,585,749<br />

6,711,880<br />

7,683,259<br />

8,194,779<br />

8,817,414<br />

10,223,543<br />

11,539,511<br />

13,037,244<br />

5000001030002 MEDICAL FUND 16,105,554<br />

17,484,565<br />

19,807,031<br />

17,570,937<br />

17,570,938<br />

20,478,122<br />

23,116,433<br />

26,116,839<br />

5000001030003 PENSIONFUND 36,084,748<br />

41,458,294<br />

45,091,142<br />

49,858,010<br />

50,032,389<br />

57,979,468<br />

65,450,562<br />

73,946,895<br />

5000001039990 SUB‐TOTAL EMPLOYEE SOCIAL CONTR 57,776,051<br />

65,654,740<br />

72,581,433<br />

75,623,727<br />

76,420,741<br />

88,681,133<br />

100,106,506<br />

113,100,978<br />

5000001040000 RENUMERATION <strong>OF</strong> COUNCILLORS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001040001 ALOWANCE COUNCILLORS 7,925,820<br />

13,419,667<br />

11,445,089<br />

12,485,284<br />

12,485,284<br />

14,351,632<br />

16,217,345<br />

18,325,600<br />

5000001040002 MEDICAL FUND COUNCILLORS 387,439<br />

29,917<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001040003 <strong>OF</strong>FICE ALLOWANCE COUNCILORS 126,310<br />

(38,227)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001040004 PENSIONFUND COUNCILORS 1,120,761<br />

654,842<br />

1,620,090<br />

1,768,261<br />

1,768,261<br />

2,420,622<br />

2,735,303<br />

3,090,893<br />

5000001040005 TELEPHONE ALLOWANCE COUNCILLORS 709,643<br />

764,800<br />

857,771<br />

1,337,559<br />

1,337,560<br />

1,069,699<br />

1,208,759<br />

1,365,898<br />

5000001040006 TRANSPORT ALLOWANCE COUNCILLORS 1,979,365<br />

4,775,610<br />

4,375,647<br />

5,019,705<br />

5,013,805<br />

5,212,728<br />

5,890,383<br />

6,656,133<br />

5000001040007 HOUSING ALLOWANCE COUNCILLORS 502,523<br />

41,433<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001040008 PROVISION FOR ALLAW INCREASE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001049990 SUB‐TOTAL RENUMERATION <strong>OF</strong> COUNCILLORS 12,751,861<br />

19,648,043<br />

18,298,598<br />

20,610,810<br />

20,604,910<br />

23,054,682<br />

26,051,791<br />

29,438,523<br />

5000001049995 TOTAL EMPLOYEE/COUNCILLORS COST 312,683,062<br />

370,638,167<br />

403,043,692<br />

493,916,032<br />

488,550,138<br />

585,302,443<br />

653,682,783<br />

736,011,414<br />

5000001050000 GENERAL EXPENDITURE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060000 GENERAL EXPEND ‐ DEPARTMENTS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060001 AUDIT FEES 835 835,691 691 44,411,524 411 524 66,037,221 037 221 33,900,000 900 000 44,350,000 350 000 55,500,000 500 000 66,050,000 050 000 66,655,000 655 000<br />

5000001060002 REGISTRATION <strong>OF</strong> INDIGENTS PROJECT ‐<br />

254,321<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060003 ICT PROGRAMME ‐<br />

‐<br />

13,658<br />

4,829,720<br />

3,122,142<br />

1,222,000<br />

6,403,000<br />

6,403,000<br />

5000001060004 VAT PENALTY 75,708<br />

‐<br />

‐<br />

‐<br />

‐<br />

1,800,000<br />

‐<br />

‐<br />

5000001060005 VAT INTEREST 69,964<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060006 READING PROGRAMME ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060007 MIG OPERATING EXPENDITURE ‐<br />

‐<br />

‐<br />

2,504,210<br />

2,504,210<br />

1,700,210<br />

‐<br />

‐<br />

5000001060008 IDP/BUDGET ROAD SHOW ‐<br />

‐<br />

‐<br />

50,000<br />

50,000<br />

70,000<br />

73,500<br />

77,175<br />

5000001060009 HEALTH GRANT ‐<br />

‐<br />

281,409<br />

961,000<br />

820,000<br />

1,139,117<br />

1,207,464<br />

1,279,911<br />

5000001060010 REVERSAL <strong>OF</strong> INSURANCE CREDITOR ‐<br />

(14,301,703)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060014 MSIG (SEDIBENG) ‐<br />

‐<br />

‐<br />

‐<br />

50,000<br />

‐<br />

‐<br />

‐<br />

5000001060100 BANK CHARGES 2,814,348<br />

3,254,982<br />

3,450,684<br />

3,000,000<br />

3,000,000<br />

4,500,000<br />

4,725,000<br />

4,961,250<br />

5000001060101 BURSARIES <strong>OF</strong>FICIALS ‐<br />

‐<br />

‐<br />

900,000<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060102 BURSARY FUND 264,840<br />

155,984<br />

197,136<br />

1,500,000<br />

1,500,000<br />

1,500,000<br />

2,000,000<br />

2,500,000<br />

5000001060103 COMMISION PAID 433,971<br />

1,251,508<br />

674,764<br />

2,000,000<br />

2,000,000<br />

2,000,000<br />

2,200,000<br />

2,332,000<br />

5000001060200 COLLECTION COST ‐ 1,297,641<br />

872,741<br />

900,000<br />

890,000<br />

1,200,000<br />

1,500,000<br />

1,800,000<br />

5000001060201 COMPUTER SYSTEMS ‐<br />

‐<br />

1,619<br />

25,000<br />

20,000<br />

110,000<br />

117,480<br />

125,469<br />

5000001060202 CONGRESSES/PR<strong>OF</strong> MEETINGS/MEETINGS 567,142<br />

2,041,713<br />

1,683,916<br />

1,929,299<br />

3,790,551<br />

4,013,651<br />

4,266,187<br />

4,864,575<br />

5000001060203 CONNECTIONS 1,812,979<br />

2,430,658<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060204 CONTRACTED SERVICES 27,806,461<br />

36,577,050<br />

32,956,753<br />

40,385,710<br />

39,410,590<br />

56,238,382<br />

51,357,776<br />

53,985,304<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

94


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000001060205 CONFERENCES FOR PORTFOLIO COUNCILLORS 198,853<br />

663,947<br />

520,516<br />

1,260,000<br />

970,000<br />

1,214,100<br />

1,278,805<br />

1,346,445<br />

5000001060206 CENTENARY FUNCTION 93,733<br />

‐<br />

(20,000)<br />

‐<br />

‐<br />

500,000<br />

500,000<br />

500,000<br />

5000001060207 SAFETY PROGRAMME ‐<br />

29,022<br />

3,272<br />

50,000<br />

50,000<br />

50,000<br />

55,000<br />

55,000<br />

5000001060300 DEPARTMENTAL ELECTRICITY ‐ ESKOM 1,393,637<br />

524,827<br />

827,307<br />

3,006,773<br />

1,988,459<br />

2,526,107<br />

2,888,853<br />

3,450,011<br />

5000001060301 INDIGENT SUPPORT ‐<br />

135,471,693<br />

108,374,412<br />

‐<br />

‐<br />

165,249,552<br />

190,741,324<br />

220,804,798<br />

5000001060302 DISCONNECTIONS AND RECONNECTIONS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060303 DONATIONS/GRANTS COUNCIL 350,739<br />

37,069<br />

‐<br />

‐<br />

‐<br />

300,000<br />

300,000<br />

300,000<br />

5000001060304 DISASTER RELEIF FUND ‐<br />

‐<br />

‐<br />

50,000<br />

75,000<br />

170,000<br />

250,000<br />

300,000<br />

5000001060305 ELECTRICITY ‐ FREE FREE BASIC 11,397,229 397 229 637 637,216 216 11,542,922 542 922 22,000,000 000 000 11,500,000 500 000 22,000,000 000 000 22,200,000 200 000 22,420,000 420 000<br />

5000001060500 FIDELITY GUARDS 439,463<br />

434,967<br />

3,529,408<br />

8,100,309<br />

7,114,277<br />

9,119,254<br />

10,225,038<br />

10,828,971<br />

5000001060501 FLEET ‐ FUEL 7,557,961<br />

10,646,170<br />

12,383,916<br />

7,800,000<br />

7,950,000<br />

8,000,000<br />

8,500,000<br />

9,000,000<br />

5000001060502 FLEET ‐ OIL 138,380<br />

70,873<br />

103,582<br />

85,000<br />

95,500<br />

100,500<br />

105,520<br />

110,522<br />

5000001060503 FINANCIAL MANAGEMNET GRANT (EXPENDITURE) 953,011<br />

367,454<br />

831,900<br />

500,000<br />

686,416<br />

750,000<br />

1,000,000<br />

1,250,000<br />

5000001060504 PETROGAS 439,787<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001060600 GRANT HIV/AIDS EXPENDITURE ‐<br />

‐<br />

404,504<br />

3,266,332<br />

2,294,284<br />

1,500,000<br />

4,104,034<br />

4,350,276<br />

5000001060601 GRANTS OTHER 3,058,148<br />

25,663<br />

767,493<br />

735,000<br />

899,591<br />

500,000<br />

750,000<br />

790,000<br />

5000001060602 GRANT CAPACITY BUILDING ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061100 LEASE AGREEMENTS 1,306,956<br />

15,558,836<br />

8,126,886<br />

31,842,294<br />

39,975,537<br />

76,566,017<br />

77,049,379<br />

75,202,067<br />

5000001061101 LEGAL CHARGES 1,109,289<br />

5,093,197<br />

1,800,697<br />

2,830,000<br />

3,289,671<br />

3,070,000<br />

3,370,000<br />

3,685,000<br />

5000001061102 LICENSE FEES 177,875<br />

143,461<br />

206,361<br />

378,806<br />

367,806<br />

411,881<br />

438,450<br />

466,253<br />

5000001061103 LOOSE TOOLS 150,541<br />

312,788<br />

253,161<br />

407,389<br />

428,852<br />

776,821<br />

912,722<br />

1,024,159<br />

5000001061105 LED PROJECTS (EXPENDITURE 83,331<br />

122,934<br />

507,558<br />

800,000<br />

800,000<br />

500,000<br />

525,000<br />

551,250<br />

5000001061106 LICENSE FEES FLEET 509,041<br />

403,554<br />

532,407<br />

600,000<br />

950,000<br />

750,000<br />

950,000<br />

1,200,000<br />

5000001061200 MANAGEMENT FEES 3,284,294<br />

2,447,613<br />

5,470,180<br />

6,500,965<br />

10,202,904<br />

13,039,614<br />

13,841,595<br />

14,673,674<br />

5000001061201 MARKETING/PROMOTION/ADVERTISMENTS 894,981<br />

3,052,266<br />

1,967,759<br />

3,939,500<br />

4,428,572<br />

6,105,925<br />

6,600,090<br />

7,136,298<br />

5000001061202 MEDICINE 15,286<br />

55,109<br />

60,866<br />

70,800<br />

77,800<br />

178,636<br />

197,160<br />

217,064<br />

5000001061203 MEMBERSHIP FEES 71,971<br />

23,480<br />

32,668<br />

2,083,880<br />

2,118,880<br />

2,117,400<br />

2,227,617<br />

2,343,903<br />

5000001061204 MANAGEMENT FEES‐UTILITY COMPANY ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061300 NUTRITION SCHEME ‐<br />

‐<br />

‐<br />

64,200<br />

64,200<br />

97,399<br />

103,349<br />

109,561<br />

5000001061500 PAUPER BURIALS 48,435<br />

80,610<br />

69,183<br />

117,700<br />

230,000<br />

259,647<br />

275,226<br />

291,739<br />

5000001061501 PERIODICALS/REFERENCE BOOK/MAGAZINES 196,729<br />

591,042<br />

590,961<br />

966,659<br />

988,909<br />

1,068,649<br />

1,239,724<br />

1,385,093<br />

5000001061502 POSTAGE 3,250,723<br />

3,497,786<br />

2,501,321<br />

2,795,333<br />

2,815,333<br />

3,498,115<br />

3,842,121<br />

4,072,927<br />

5000001061503 PUBLIC AUCTION ‐<br />

‐<br />

‐<br />

18,000<br />

18,000<br />

40,000<br />

48,000<br />

56,000<br />

5000001061504 SOCIAL CONTRIBUTIONS 175<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061505 PERSONNEL RELATED MATTERS 118,760<br />

313,121<br />

58,606<br />

42,249<br />

42,249<br />

42,249<br />

44,361<br />

46,579<br />

5000001061506 PUBLIC RELATIONS FUNCTIONS 355,981<br />

618,128<br />

582,539<br />

734,100<br />

824,100<br />

750,000<br />

810,000<br />

845,000<br />

5000001061507 PREPAID DEFAULT DEBTORS EXP ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061700 RECOVERABLE WORKS (250,897)<br />

(155,420)<br />

(216,897)<br />

500,000<br />

400,000<br />

300,000<br />

400,000<br />

500,000<br />

5000001061701 RENTAL 816,740<br />

1,861,759<br />

1,770,712<br />

1,800,000<br />

1,910,814<br />

2,790,354<br />

2,962,800<br />

3,427,344<br />

5000001061702 RESONING/ALLIENATION COST 44 44,502 502 12 12,230 230 10 10,150 150 25 25,000 000 25 25,000 000 25 25,000 000 40 40,000 000 40 40,000 000<br />

5000001061703 REVENUE STAMPS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061704 RESTRUCTURING GRANT ‐<br />

‐<br />

61,561<br />

31,150,000<br />

33,047,127<br />

13,000,000<br />

‐<br />

‐<br />

5000001061750 S<strong>OF</strong>TWARE LICENCING FEES ‐<br />

‐<br />

2,551,760<br />

2,500,000<br />

500,000<br />

700,000<br />

735,000<br />

771,750<br />

5000001061800 STATIONERY/PRINTING/BINDING ETC 2,322,841<br />

3,137,427<br />

3,694,417<br />

4,334,791<br />

4,509,590<br />

4,911,429<br />

4,925,441<br />

5,312,809<br />

5000001061801 STOCK AND MATERIALS 7,949,524<br />

2,026,220<br />

2,028,020<br />

2,257,907<br />

2,756,811<br />

3,184,406<br />

3,624,956<br />

3,940,288<br />

5000001061802 STOCK SHORTAGES 1,871,913<br />

(1,514,548)<br />

3,869,500<br />

12,000<br />

12,000<br />

15,000<br />

15,000<br />

15,000<br />

5000001061803 SUNDRIES 12,364<br />

380,584<br />

1,058,946<br />

4,500<br />

4,500<br />

4,500<br />

4,800<br />

5,000<br />

5000001061804 SPORT AND RECREATION GRANT (EXPENDITURE) ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001061805 SPECIAL PROJECTS 7,733,029<br />

9,503,209<br />

28,231,868<br />

35,152,365<br />

53,243,365<br />

63,830,947<br />

80,138,578<br />

88,506,050<br />

5000001061900 TELEPHONE 2,863,929<br />

4,255,814<br />

4,284,090<br />

4,898,718<br />

4,733,595<br />

7,319,362<br />

7,855,608<br />

8,417,972<br />

5000001061901 TRACKING 315,309<br />

19,153<br />

134,523<br />

225,000<br />

225,000<br />

225,000<br />

350,000<br />

450,000<br />

5000001061902 TRAINING 649,955<br />

2,301,724<br />

1,542,884<br />

3,935,646<br />

4,661,896<br />

6,099,566<br />

7,536,721<br />

8,630,214<br />

5000001061903 TRANSPORT (FLEET) 17,914,971<br />

23,861,054<br />

27,550,996<br />

27,000,000<br />

30,044,078<br />

37,736,196<br />

45,793,993<br />

49,384,292<br />

5000001061904 TRANSITIONAL GRANT (EXPENDITURE) ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5,000,000<br />

2,000,000<br />

2,000,000<br />

5000001061905 TRACKING FLEET ‐<br />

‐<br />

‐<br />

75,000<br />

‐<br />

75,000<br />

80,000<br />

85,000<br />

5000001062000 UNFORSEEN EXPENDITURE 2,024,452<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001062001 UNIFORMS 1,915,006<br />

1,380,755<br />

2,080,928<br />

3,622,595<br />

4,082,835<br />

4,953,079<br />

5,557,886<br />

6,098,543<br />

5000001062002 UNAUTHORISED EXPENDITURE ‐<br />

4,392,143<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001062100 VALUATION ROLL / INTERIM VALUATIONS 82,778<br />

258,486<br />

555,391<br />

245,000<br />

207,538<br />

370,000<br />

150,000<br />

150,000<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

95


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000001062200 WARD COMMITTEES 203,127<br />

189,300<br />

158,341<br />

300,000<br />

238,000<br />

2,000,000<br />

2,260,000<br />

2,553,800<br />

5000001062250 LONG SERVICE AWARDS ‐<br />

‐<br />

1,607,688<br />

300,000<br />

300,000<br />

700,000<br />

747,600<br />

798,437<br />

5000001062260 JUDGEMENTS ‐<br />

‐<br />

‐<br />

1,500,000<br />

125,329<br />

1,000,000<br />

1,300,000<br />

1,500,000<br />

5000001062270 INTERN GRANT ‐<br />

‐<br />

‐<br />

141,000<br />

141,000<br />

141,000<br />

‐<br />

‐<br />

5000001062272 VIP DRIVERS' UNIFORM ‐<br />

‐<br />

‐<br />

‐<br />

120,000<br />

‐<br />

‐<br />

‐<br />

5000001066990 SUB‐TOTAL GEN EXPEN DEPARTMENTS 109,825,136<br />

270,506,396<br />

279,175,159<br />

263,909,747<br />

294,042,311<br />

536,626,065<br />

581,752,158<br />

636,382,772<br />

5000001070000 GENERAL EXPEND ‐ BULK PURCHASE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001077001 PURCHASE ‐ ELECTRICITY 338,564,120<br />

378,474,824<br />

404,404,165<br />

425,000,000<br />

528,388,000<br />

674,997,883<br />

836,935,520 1,046,169,400<br />

5000001077002 PURCHASE ‐ WATER 190 190,866,186 866 186 213 213,593,263 593 263 234 234,146,026 146 026 255 255,000,000 000 000 255 255,000,000 000 000 268 268,254,847 254 847 343 343,000,000 000 000 378 378,000,000 000 000<br />

5000001077003 PURCHASE ‐ OTHER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001077990 SUB‐TOTAL GEN EXPEN BULK PURCHASE 529,430,307<br />

592,068,087<br />

638,550,191<br />

680,000,000<br />

783,388,000<br />

943,252,730 1,179,935,520 1,424,169,400<br />

5000001080000 GENERAL EXPEND ‐ FIN SERVICES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001080001 COMPANSATION COMMISSIONER EXP ‐<br />

1,904,842<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088020 CASUALTY CONTRIBUTION 148,348<br />

‐<br />

2,328,919<br />

4,798,636<br />

4,848,636<br />

3,302,959<br />

3,732,324<br />

4,217,441<br />

5000001088080 INSURANCE ‐ PREMUIM 9,520,518<br />

11,224,940<br />

12,991,380<br />

15,399,477<br />

17,492,069<br />

20,022,134<br />

22,103,393<br />

23,714,991<br />

5000001088081 INSURANCE ‐ EXCESS PAYMENTS 642,792<br />

391,449<br />

739,779<br />

782,561<br />

786,017<br />

771,623<br />

838,680<br />

909,688<br />

5000001088082 INSURANCE ‐ PORTION <strong>OF</strong> SELF INSURANCE 324,640<br />

20,108<br />

133,108<br />

‐<br />

1,890,000<br />

3,690,000<br />

3,920,000<br />

4,178,000<br />

5000001088083 INTEREST EXTERNAL BORROWINGS 23,843,846<br />

20,690,885<br />

28,533,495<br />

20,000,031<br />

20,000,031<br />

20,213,484<br />

22,226,293<br />

24,439,871<br />

5000001088084 INSURANCE ‐ PREMIUM FLEET ‐<br />

2,714,186<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088085 INSURANCE ‐ EXCESS PAYMENTS FLEET 101,203<br />

155,619<br />

339,138<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088086 INSURANCE ‐ PORTION SELF INSUR FLEET ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088087 IMPAIREMENT <strong>OF</strong> INVESTMENT ‐<br />

1,184,531<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088110 LOSS ON THE SALE <strong>OF</strong> ASSETS ‐<br />

1,733,701<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088150 POST PROC COST ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088170 REGIONAL COUNCIL LEVIES 2,182,310<br />

217,494<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001088180 SKILLS DEVELOPMENT LEVY 2,217,558<br />

2,744,503<br />

2,941,775<br />

3,176,959<br />

3,176,959<br />

3,187,901<br />

3,602,328<br />

4,070,631<br />

5000001088990 SUB‐TOTAL GENERAL EXPEND FIN SERVICES 39,097,871<br />

42,982,259<br />

48,007,593<br />

44,157,664<br />

48,193,712<br />

51,188,101<br />

56,423,018<br />

61,530,622<br />

5000001089995 TOTAL GENERAL EXPENDITURE 678,353,314<br />

905,556,742<br />

965,732,944<br />

988,067,411 1,125,624,023 1,531,066,896 1,818,110,696 2,122,082,794<br />

5000001100000 REPAIR AND MAINTENANCE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001100500 FLEET ‐ BATTERIES 121,612<br />

122,089<br />

157,056<br />

160,000<br />

200,000<br />

200,000<br />

220,000<br />

250,000<br />

5000001100501 FLEET ‐ LABOUR 1,365,347<br />

1,059,104<br />

989,734<br />

650,000<br />

750,000<br />

750,000<br />

825,000<br />

1,000,000<br />

5000001100502 FLEET ‐ SPARE PARTS 11,255,235<br />

15,076,002<br />

13,021,303<br />

10,000,000<br />

15,000,000<br />

15,000,000<br />

16,000,000<br />

17,000,000<br />

5000001100503 FLEET ‐ TYRES 1,074,925<br />

1,489,837<br />

1,859,844<br />

1,300,000<br />

2,000,000<br />

1,500,000<br />

1,750,000<br />

2,000,000<br />

5000001100504 MAINT‐ WATER DEMAND MANAGEMENT ‐<br />

3,602,397<br />

1,690,723<br />

3,000,000<br />

3,000,000<br />

10,000,000<br />

11,000,000<br />

12,000,000<br />

5000001101100 LABOUR ‐ BUILDING WORKSHOP 960,763<br />

716,928<br />

571,990<br />

1,200,421<br />

1,213,121<br />

1,689,729<br />

1,882,742<br />

2,008,746<br />

5000001101101 LABOUR ‐ ELECT WORKSHOP 7,590,910<br />

7,789,419<br />

8,891,306<br />

7,728,216<br />

10,727,215<br />

14,916,673<br />

16,515,312<br />

18,164,929<br />

5000001101102 LABOUR ‐ ROADS WORKSHOP 7,850,860<br />

11,863,634<br />

1,235<br />

90,074<br />

116,526<br />

140,131<br />

162,875<br />

182,069<br />

5000001101103 LABOUR ‐ WATER WORKSHOP 8,025,720<br />

11,494,746<br />

9,989,142<br />

10,444,928<br />

11,044,184<br />

22,559,252<br />

25,868,694<br />

28,019,354<br />

5000001101200 MAINT ‐ BUILDINGS FENCES & SITES 2,935,704<br />

3,151,347<br />

2,884,336<br />

6,014,211<br />

5,518,212<br />

7,396,305<br />

7,007,212<br />

7,420,280<br />

5000001101201 MAINT ‐ NETWORK / INFRASTRUCTURE 16 16,976,942 976 942 39 39,670,707 670 707 51 51,036,394 036 394 114 114,567,384 567 384 110 110,061,384 061 384 115 115,924,727 924 727 150 150,788,743 788 743 181 181,733,290 733 290<br />

5000001101203 MAINT ‐ PLANT EQUIPMENT & FURNITURE 6,201,972<br />

8,699,057<br />

7,827,011<br />

11,702,989<br />

11,250,355<br />

12,897,091<br />

15,319,232<br />

16,285,022<br />

5000001109995 TOTAL REPAIR AND MAINTENACE 64,997,092<br />

104,735,266<br />

98,920,073<br />

166,858,223<br />

170,880,997<br />

202,973,909<br />

247,339,810<br />

286,063,690<br />

5000001110000 INTER‐DEPARTMENTAL CHARGES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110300 DEPARTMENTAL CHARGES 23,400,770<br />

15,887,814<br />

16,761,863<br />

2,689,623<br />

2,770,618<br />

318,152<br />

338,961<br />

360,278<br />

5000001110800 INTERNAL TRANSFERS ‐ BUILDINGS 1,823,020<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110801 INTERNAL TRANSFERS ‐ EXECUTIVE MAYOR ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110802 INTERNAL TRANSFERS ‐ FIN SERVICES 13,533,281<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110803 INTERNAL TRANSFERS ‐ MMC ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110804 INTERNAL TRANSFERS ‐ MUNICIPAL MANAGER 3,945,674<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110805 INTERNAL TRANSFERS ‐ PARKS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110806 INTERNAL TRANSFERS ‐ SAFETY & SECURITY 1,048,040<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110807 INTERNAL TRANSFERS ‐ SUPPORT SERVICES 5,533,334<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110808 INTERNAL TRANSFERS ‐ TELEPH/CALL CENTRE 585,596<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001110810 INTERNAL SUBSIDYS‐METSI ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001119995 TOTAL INTER‐DEPARTMENTAL INTER DEPARTMENTAL CHARGES 49,869,715<br />

15,887,814<br />

16,761,863<br />

2,689,623<br />

2,770,618<br />

318,152<br />

338,961<br />

360,278<br />

5000001120000 DEPRECIATION ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001120300 DEPRECIATION 44,616,956<br />

59,233,389<br />

82,987,060<br />

68,559,086<br />

68,571,182<br />

80,760,106<br />

87,442,114<br />

93,735,851<br />

5000001120301 DEPRECIATION FLEET ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001129995 TOTAL DEPRECIATION 44,616,956<br />

59,233,389<br />

82,987,060<br />

68,534,655<br />

68,571,182<br />

80,760,106<br />

87,442,114<br />

93,735,851<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

96


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000001130000 CONTRIBUTIONS TO PROVISIONS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001130200 CONTR ‐ PROVISION FOR BAD DEBTS 119,374,824<br />

365,938,438<br />

129,678,039<br />

348,137,170<br />

296,718,698<br />

392,304,876<br />

518,716,632<br />

699,206,169<br />

5000001130201 CONTR ‐ PROVISION FOR LEAVE ‐<br />

328,713<br />

8,538,508<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001130202 CONTR ‐ PROVISION FOR CAPITAL EXPEND 40,527<br />

‐<br />

‐<br />

129,382,369<br />

161,447,806<br />

126,214,746<br />

143,245,332<br />

137,689,000<br />

5000001130203 CONTR ‐ PROVISION FOR INDIGENTS(HOUSING) (1,029)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001130204 PERFOMANCE BONUS ‐<br />

2,115,583<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001139995 SUB‐TOTAL CONTRIBUTIONS TO PROVISIONS 119,415,351<br />

368,382,734<br />

138,216,547<br />

477,519,539<br />

458,166,504<br />

518,519,622<br />

661,961,964<br />

836,895,169<br />

5000001140000 CONTRIBUTIONS FROM PROVISIONS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001140200 CONTR ‐ PROVISION FOR BAD DEBTS ‐ (103 (103,146,519) 146 519) ‐ ‐ ‐ ‐ ‐ ‐<br />

5000001140201 CONTR ‐ PROVISION FOR LEAVE (11,885,830)<br />

26,837,445<br />

(8,377,542)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001149995 SUB‐TOTAL CONTRIBUTIONS FROM PROV (11,886,859)<br />

(76,309,074)<br />

(8,377,542)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001159997 TOTAL EXPENDITURE (NETT) 1,258,048,631 1,748,125,038 1,697,284,636 2,197,577,147 2,314,563,462 2,918,941,127 3,468,876,328 4,075,149,197<br />

5000001170000 LESS : AMOUNTS CHARGED OUT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170400 EMPLOYEE COST ALLOCATED TO OPERATING (26,612,532)<br />

(33,978,373)<br />

(20,199,962)<br />

(25,223,892)<br />

(29,679,376)<br />

(35,925,160)<br />

(39,515,051)<br />

(42,931,256)<br />

5000001170401 EMPLOYEE COST CAPITALISED ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170800 INTERNAL RECOVERIES ‐ BUILDINGS (1,823,020)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170801 INTERNAL RECOVERIES ‐ EXECUTIVE MAYOR ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170802 INTERNAL RECOVERIES ‐ FIN SERVICES (13,533,281)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170803 INTERNAL RECOVERIES ‐ MMC ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170804 INTERNAL RECOVERIES ‐ MUNICIPAL MANAGER (3,945,674)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170805 INTERNAL RECOVERIES ‐ PARKS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170806 INTERNAL RECOVERIES ‐ SAFETY & SECURITY (1,027,476)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170807 INTERNAL RECOVERIES ‐ SUPPORT SERVICES (5,533,334)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170808 INTERNAL RECOVERIES ‐ TELEP/CALL CENTRE (585,596)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001170809 INTERNAL RECOVERIES ‐ METSI ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000001171900 TRANSPORT COST PER TARIFF (FLEET) (17,162,205)<br />

(23,462,980)<br />

(26,595,911)<br />

‐<br />

‐<br />

(37,736,196)<br />

(44,802,593)<br />

(48,535,077)<br />

5000001179995 SUB‐TOTAL AMOUNTS CHARGED OUT (70,223,117)<br />

(57,441,353)<br />

(46,795,873)<br />

(25,223,892)<br />

(29,679,376)<br />

(73,661,356)<br />

(84,317,644)<br />

(91,466,333)<br />

5000001199998 TOTAL EXPENDITURE 1,187,825,514 1,690,683,685 1,650,488,763 2,172,353,255 2,284,884,086 2,845,279,771 3,384,558,685 3,983,682,864<br />

5000002200000 OPERATING INCOME GENERATED ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210000 USER/LEVIED CHARGES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210001 ADDISIONAL INCOME TARIFFS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

(28,921,289)<br />

(29,157,105)<br />

(29,650,945)<br />

5000002210002 ASSESMENT RATES (199,419,992) (229,197,252) (234,526,481) (254,535,821) (254,535,821) (438,000,000) (534,360,000) (651,919,200)<br />

5000002210005 ASSESSMENT RATES: BUSINESS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210010 ASSESSMENT RATES: DOMESTIC ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210015 ASSESSMENT RATES: GOVERNMENT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210020 ASSESSMENT RATES: AGRICULTURAL ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002210100 INDIGENT SUBSIDY ‐<br />

‐<br />

‐ (119,396,092) (119,396,092)<br />

‐<br />

‐<br />

‐<br />

5000002210400 ELECTRICITY BASIC (24,899,328)<br />

(26,819,365)<br />

(31,430,476)<br />

(35,083,163)<br />

(38,503,998)<br />

(48,515,037)<br />

(61,128,947)<br />

5000002210401 ELECTRICITY SALES GENERAL (400,341,207) (427,163,955) (468,418,965) (535,800,000) (680,000,000) (814,297,756) (1,026,015,173) (1,292,779,118)<br />

5000002211700 REFUSE REMOVAL GENERAL (57 (57,785,399) 785 399) (66 (66,362,293) 362 293) (65 (65,888,931) 888 931) (72 (72,000,000) 000 000) (50 (50,000,000) 000 000) (91 (91,922,646) 922 646) (99 (99,000,690) 000 690) (106 (106,623,743) 623 743)<br />

5000002211701 REFUSE REMOVAL SPECIAL (67,201)<br />

(2,219)<br />

(97,268)<br />

(115,500)<br />

(115,500)<br />

(123,354)<br />

(129,645)<br />

(136,257)<br />

5000002211800 SEWER ADD ‐ GENERAL (24,391,044)<br />

(79,526,939)<br />

(80,384,335)<br />

(75,854,529)<br />

(53,536,352) (172,650,280) (202,000,828) (240,380,985)<br />

5000002211801 SEWER BASIC ‐ GENERAL (47,443,570)<br />

(58,013,293)<br />

(51,698,462)<br />

(49,787,498)<br />

(27,469,322)<br />

(31,589,720)<br />

(36,959,972)<br />

(43,982,367)<br />

5000002212200 WATER BASIC ‐ GENERAL (67,553,623)<br />

(2,609,955)<br />

(1,441,821)<br />

(2,863,237)<br />

(2,863,237)<br />

(3,292,723)<br />

(3,852,486)<br />

(4,584,458)<br />

5000002212201 WATER SALES GENERAL (158,950,784) (282,831,502) (274,204,136) (405,137,169) (354,153,986) (426,218,477) (498,675,618) (593,423,986)<br />

5000002219995 SUB‐TOTAL USER/LEVIED CHARGES (980,852,150) (1,172,526,772) (1,208,090,874) (1,548,653,008) (1,585,382,310) (2,045,520,243) (2,478,666,554) (3,024,610,005)<br />

5000002220000 TARIFF CHARGES LEVIED ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002220001 AMBULANCE FEES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002220300 DISHONOURED CHEQUES (510,497)<br />

(50,484)<br />

(53,735)<br />

(40,000)<br />

(40,000)<br />

(42,720)<br />

(44,899)<br />

(46,740)<br />

5000002220400 ENCROACHMENT AND HOARDING FEES (206,576)<br />

(209,437)<br />

(877,282)<br />

(731,006)<br />

(731,006)<br />

(776,329)<br />

(824,461)<br />

(865,680)<br />

5000002220500 FIRE RESCUE SERVICES (39,444)<br />

(3,675)<br />

(158,432)<br />

(227,740)<br />

(100,000)<br />

(108,000)<br />

(116,640)<br />

(125,971)<br />

5000002220800 INCOME THROUGH ADVER/SIGNS/BILL/ETC (1,282)<br />

(1,120)<br />

(7,669)<br />

‐<br />

(14,000)<br />

‐<br />

‐<br />

‐<br />

5000002220801 INDUSTRIAL EFFLUENT (929,320)<br />

(532,690)<br />

(1,169,682)<br />

(962,657)<br />

(962,658)<br />

(1,525,000)<br />

(1,535,000)<br />

(1,535,000)<br />

5000002221700 RECONNECTION FEES (7,173,708)<br />

(7,528,232)<br />

(6,017,525)<br />

(8,210,214)<br />

(11,691,350)<br />

(12,486,362)<br />

(13,123,166)<br />

(13,661,216)<br />

5000002221701 REFUSE DUMPING LANDFILL SITE (16,978,429)<br />

(15,178,336)<br />

(12,211,391)<br />

(10,020,000)<br />

(13,000,000)<br />

(13,884,000)<br />

(14,592,084)<br />

(15,190,359)<br />

5000002221900 TRAFFIC ESCOURT (62,900)<br />

(34,125)<br />

(32,068)<br />

(20,000)<br />

(20,000)<br />

(20,000)<br />

(21,000)<br />

(22,050)<br />

5000002222100 VACUUM TANK AND DUMPING (39)<br />

‐<br />

(19)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002222200 WARNING SERVICES (1,500,758)<br />

(1,756,367)<br />

(1,746,893)<br />

(1,500,000)<br />

(1,500,000)<br />

(1,700,000)<br />

(1,870,000)<br />

(2,057,000)<br />

5000002229995 SUB‐TOTAL TARIFF CHARGES LEVIED (27,402,952)<br />

(25,294,465)<br />

(22,274,696)<br />

(23,645,618)<br />

(28,059,014)<br />

(30,542,411)<br />

(32,127,250)<br />

(33,504,016)<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

97


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000002230000 TARIFF CHARGES OTHER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002230001 ACTIVITY ROOM / OUDITORUIM (33,962)<br />

(27,961)<br />

(43,572)<br />

(40,237)<br />

(40,237)<br />

(25,960)<br />

(28,110)<br />

(31,210)<br />

5000002230002 ADVERTISEMENT SIGNS (346,557)<br />

(220,048)<br />

(114,843)<br />

(123,385)<br />

(123,385)<br />

(130,000)<br />

(143,000)<br />

(157,300)<br />

5000002230003 INFORMAL TRADING REVENUE ‐<br />

(12,114)<br />

(65,350)<br />

(66,035)<br />

(66,035)<br />

(72,000)<br />

(79,200)<br />

(87,120)<br />

5000002230100 BUILDING LINE REGULATIONS (8,470)<br />

(10,113)<br />

(14,556)<br />

(12,000)<br />

(12,000)<br />

(4,000)<br />

(4,200)<br />

(4,410)<br />

5000002230101 BUILDING PLAN COPIES (162,075)<br />

(88,885)<br />

(37,949)<br />

(85,000)<br />

(85,000)<br />

(90,270)<br />

(95,867)<br />

(101,820)<br />

5000002230102 BUILDING PLAN FEES (1,623,401)<br />

(2,062,597)<br />

(2,008,539)<br />

(2,178,905)<br />

(2,178,905)<br />

(2,313,997)<br />

(2,457,465)<br />

(2,580,340)<br />

5000002230200 CLEARANCE/VALUATION CERTIFICATES (323,909)<br />

(352,884)<br />

(260,206)<br />

(200,000)<br />

(200,000)<br />

‐<br />

‐<br />

‐<br />

5000002230400 ENTRANCE FEES (265 (265,607) 607) (354 (354,823) 823) (171 (171,175) 175) (279 (279,030) 030) (279 (279,030) 030) (297 (297,000) 000) (311 (311,730) 730) (325 (325,641) 641)<br />

5000002230500 FINAL READING FEE (133)<br />

‐<br />

‐<br />

(1,000)<br />

‐<br />

(1,000)<br />

(1,100)<br />

(1,210)<br />

5000002230600 GRASS CUTTING AND REMOVAL <strong>OF</strong> TREES (2,618)<br />

(2,446)<br />

(4,837)<br />

(6,000)<br />

(6,000)<br />

‐<br />

‐<br />

‐<br />

5000002231200 MEMBERSHIP FEES (344,769)<br />

(330,755)<br />

(311,760)<br />

(311,417)<br />

(311,417)<br />

(318,097)<br />

(339,420)<br />

(361,609)<br />

5000002231201 METER TEST FEES (9,792)<br />

(14,975)<br />

(2,688)<br />

(4,000)<br />

(2,000)<br />

(5,000)<br />

(5,500)<br />

(6,020)<br />

5000002231202 METER TAMPERING FEES ‐ HOSTELS ‐<br />

(25)<br />

(31)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002231500 PLANNING FEES (139,645)<br />

(136,943)<br />

(67,614)<br />

(54,000)<br />

(54,000)<br />

(20,000)<br />

(20,000)<br />

(20,000)<br />

5000002231501 PREPAID CONSUMER (57,985,829)<br />

(67,182,173)<br />

(70,217,259)<br />

(85,500,000)<br />

(93,000,000) (119,797,971) (142,584,041) (178,230,052)<br />

5000002231502 PREPAID DEFAULT DEBTORS (250,698)<br />

(12,134)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002231503 PREPAID HOSTELS‐ELECTR SALES (2,082)<br />

(175)<br />

175<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002231700 RESERVATIONS MEDIA AND BOOKS (3,017)<br />

(1,372)<br />

(2,239)<br />

(2,500)<br />

(2,500)<br />

(1,000)<br />

(1,120)<br />

(1,300)<br />

5000002231800 SERVICE CHARGES (97,666)<br />

(116,591)<br />

(98,830)<br />

(102,000)<br />

(111,179)<br />

(133,096)<br />

(147,406)<br />

(162,246)<br />

5000002231801 STREET EYES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002232300 X‐RAY UNIT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002232500 ZONING CERTIFICATES (14,908)<br />

(17,651)<br />

(14,213)<br />

(13,000)<br />

(13,000)<br />

(8,000)<br />

(8,400)<br />

(8,800)<br />

5000002239995 SUB‐TOTAL TARIFF CHARGES OTHER] (61,615,137)<br />

(70,944,666)<br />

(73,435,484)<br />

(88,978,509)<br />

(96,484,688) (123,217,391) (146,226,559) (182,079,077)<br />

5000002240000 GOVERNMENT GRANTS AND SUBSIDIES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240040 MSIG (SEDIBENG) ‐<br />

‐<br />

‐<br />

‐<br />

(50,000)<br />

‐<br />

‐<br />

‐<br />

5000002240045 REGIONAL SEWER SCHEME ‐<br />

‐<br />

(7,272,332)<br />

‐<br />

(42,727,668)<br />

(20,000,000)<br />

(54,000,000)<br />

(60,000,000)<br />

5000002240050 BONTLE KE BOTHO ‐<br />

‐<br />

‐<br />

‐<br />

(894,144)<br />

‐<br />

‐<br />

‐<br />

5000002240170 GRANTS RECEIVED IN KIND (400,000)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240200 MIG FUNDS ‐<br />

(55,944,293)<br />

(96,275,673)<br />

(76,588,000)<br />

(76,588,000)<br />

(94,135,000) (110,933,000)<br />

(95,238,000)<br />

5000002240201 MIG GRANT SEWER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240202 MIG GRANT WATER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240203 MIG GRANT OPERATIONAL ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240400 EQUI<strong>TABLE</strong> SHARE (156,954,063) (193,116,783) (237,308,815) (173,141,908) (173,141,908) (388,199,000) (485,954,000) (531,822,000)<br />

5000002240450 HIV/AIDS GRANT ‐<br />

‐<br />

(404,504)<br />

(3,266,332)<br />

(2,294,284)<br />

(1,500,000)<br />

(4,104,034)<br />

(4,350,276)<br />

5000002240500 FINANCIAL MANAGEMENT GRANT (1,692,388)<br />

(391,982)<br />

(908,984)<br />

(500,000)<br />

(858,560)<br />

(750,000)<br />

(1,000,000)<br />

(1,250,000)<br />

5000002240550 DWAF GRANT ‐<br />

‐<br />

(19,945,127)<br />

‐<br />

(219,253)<br />

‐<br />

‐<br />

‐<br />

5000002240600 ICT PRAGRAMME GRANT ‐<br />

‐<br />

‐<br />

(8,793,300)<br />

(3,964,642)<br />

(4,682,000)<br />

(6,403,000)<br />

(6,403,000)<br />

5000002240650 READING PROGRAMME GRANT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002240700 HEALTH GRANT ‐<br />

‐<br />

(458 (458,872) 872) (961 (961,000) 000) (2 (2,420,018) 420 018) (3 (3,320,563) 320 563) (3 (3,519,796) 519 796) (3 (3,730,984) 730 984)<br />

5000002241400 OTHER GRANTS (3,122,071)<br />

(234,910)<br />

(947,271)<br />

(735,000)<br />

(899,591)<br />

(500,000)<br />

(750,000)<br />

(790,000)<br />

5000002241500 PROV HEALTH SUBSIDIES (26,850,310)<br />

(26,474,161)<br />

(37,209,719)<br />

(27,682,434)<br />

(33,562,667)<br />

(32,813,235)<br />

(34,782,029)<br />

(36,868,951)<br />

5000002241700 RESTRUCTURING GRANT (5,174,437)<br />

(5,776,400)<br />

(7,232,209)<br />

(31,150,000)<br />

(59,259,882)<br />

(13,000,000)<br />

‐<br />

‐<br />

5000002241701 RESTRUCTURING GRANT VEHICLES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002241702 RESTRUCTURING GRANT SEWER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002241703 D.A.C.E. GRANT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

(459,000)<br />

‐<br />

‐<br />

5000002241704 SOCIAL DEVELOPMENT GRANT ‐<br />

‐<br />

‐<br />

‐<br />

(7,000,000)<br />

(6,500,000)<br />

‐<br />

‐<br />

5000002241705 HOUSING GRANT ‐<br />

‐<br />

‐<br />

‐<br />

(10,600,000)<br />

‐<br />

‐<br />

‐<br />

5000002241706 INTERN GRANT ‐<br />

‐<br />

‐<br />

‐<br />

(141,000)<br />

(141,000)<br />

‐<br />

‐<br />

5000002241800 SPORT AND RECREATION ‐<br />

‐<br />

‐<br />

‐<br />

(1,000,000)<br />

‐<br />

‐<br />

‐<br />

5000002241801 N.E.P. ‐<br />

‐<br />

‐<br />

(1,000,000)<br />

(5,106,222)<br />

‐<br />

(10,000,000)<br />

(20,000,000)<br />

5000002241802 NEIGHBOURHOOD DEV GRANT ‐<br />

‐<br />

‐<br />

(51,000,000)<br />

‐<br />

(25,000,000)<br />

(22,000,000)<br />

(22,000,000)<br />

5000002241850 DRY SANITATION GRANT ‐<br />

‐<br />

(1,864,526)<br />

‐<br />

(261,034)<br />

‐<br />

‐<br />

‐<br />

5000002241900 PROJECTS FUNDED EX DISTRICT COUNCIL (650,168)<br />

‐<br />

‐<br />

‐<br />

(1,328,277)<br />

‐<br />

‐<br />

‐<br />

5000002249995 SUB‐TOTAL SUB TOTAL GOVERN GRANTS & SUBSIDIES (194,843,437) (281,938,529) (409,828,033) (374,958,974) (422,317,150) (590,999,797) (733,445,859) (782,453,211)<br />

5000002250000 FINES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002250500 FINES (7,966,326)<br />

(11,942,588)<br />

(12,958,345)<br />

(18,016,250)<br />

(16,016,250)<br />

(17,105,355)<br />

(17,978,615)<br />

(18,716,625)<br />

5000002259995 SUB‐TOTAL FINES (7,966,326)<br />

(11,942,588)<br />

(12,958,345)<br />

(18,016,250)<br />

(16,016,250)<br />

(17,105,355)<br />

(17,978,615)<br />

(18,716,625)<br />

5000002260000 INTEREST ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

98


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000002260300 DIVIDENDS RECEIVED (33,275)<br />

(3,854)<br />

(4,655)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002260801 INTEREST ON ARREARS ‐ ASS RATES (40,367,501)<br />

(52,094,850)<br />

(40,812,590)<br />

(28,522,924)<br />

(28,522,924)<br />

‐<br />

‐<br />

‐<br />

5000002260802 INTEREST ON ARREARS ‐ ELECT (6,303,413)<br />

(5,384,957)<br />

(7,630,263)<br />

(5,628,183)<br />

(6,559,870)<br />

(9,500,000)<br />

(7,215,856)<br />

(7,937,441)<br />

5000002260803 INTEREST ON ARREARS ‐ WATER (41,177,212)<br />

(54,891,247)<br />

(45,985,150)<br />

(36,041,480)<br />

(36,041,480)<br />

(41,033,740)<br />

(33,016,400)<br />

(33,224,532)<br />

5000002260804 INTEREST ON ARREARS ‐ REFUSE (383,084)<br />

(422,740)<br />

(343,094)<br />

(260,808)<br />

(260,808)<br />

(299,929)<br />

(315,225)<br />

(328,150)<br />

5000002260805 INTEREST ON ARREARS ‐ SANITATION (10,649,713)<br />

(14,346,456)<br />

(13,437,834)<br />

(10,285,256)<br />

(10,285,256)<br />

(13,593,165)<br />

(10,933,125)<br />

(10,997,511)<br />

5000002260806 INTEREST ON ARREARS ‐ OTHER (2,808,230)<br />

(3,707,708)<br />

(3,793,280)<br />

(3,010,011)<br />

(3,010,012)<br />

(3,461,514)<br />

(3,638,051)<br />

(3,787,211)<br />

5000002260807 INTEREST ON MOTORCAR LOANS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002260808 INTEREST ON INVESTMENTS (14 (14,206,609) 206 609) (24 (24,315,262) 315 262) (34 (34,773,795) 773 795) (12 (12,000,000) 000 000) (12 (12,000,000) 000 000) (27 (27,000,000) 000 000) (24 (24,500,000) 500 000) (22 (22,000,000) 000 000)<br />

5000002260809 INTERSET ON BURSARY LOANS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002269995 SUB‐TOTAL INTEREST (115,929,037) (155,167,074) (146,780,660)<br />

(95,748,662)<br />

(96,680,350)<br />

(94,888,347)<br />

(79,618,658)<br />

(78,274,845)<br />

5000002270000 RENT FACILITIES AND EQUIPMENT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002270800 INCOME COMMUNITY HALLS (34,443)<br />

(74,490)<br />

(87,077)<br />

(85,170)<br />

(85,170)<br />

(65,599)<br />

(69,994)<br />

(74,823)<br />

5000002271700 RENTAL EQUIPMENT (186,900)<br />

(527,010)<br />

(220,307)<br />

(306,212)<br />

(305,212)<br />

(261,709)<br />

(279,237)<br />

(298,571)<br />

5000002271701 RENTAL MUNICIPAL PROPERTIES (6,015,160)<br />

(6,530,041)<br />

(8,433,057)<br />

(7,048,806)<br />

(7,034,806)<br />

(18,190,435)<br />

(20,008,884)<br />

(22,009,177)<br />

5000002279995 SUB‐TOTAL RENT FACILITIES & EQUIP (6,236,503)<br />

(7,131,541)<br />

(8,740,440)<br />

(7,426,187)<br />

(7,425,188)<br />

(18,517,743)<br />

(20,358,115)<br />

(22,382,571)<br />

5000002280000 LICENSES AND PERMITS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002280300 DRIVER LICENSE TESTING CENTER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002281400 OTHER INCOME ‐ REGISTRATION & LICENSES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002281900 TRADE AND OTHER LICENSES (12,165)<br />

(2,822)<br />

(1,571)<br />

(5,569)<br />

(5,569)<br />

‐<br />

‐<br />

‐<br />

5000002282100 VEHICLE TESTING STATION ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002289995 SUB‐TOTAL LICENSES AND PERMITS (12,165)<br />

(2,822)<br />

(1,571)<br />

(5,569)<br />

(5,569)<br />

‐<br />

‐<br />

‐<br />

5000002290000 AGENCY SERVICES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002290001 AMBULANCE SUBSIDIES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002290600 GAUTENG LICENSES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002299995 SUB‐TOTAL AGENCY SERVICES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300000 OTHER INCOME ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300001 ACCESS TO INFORMATION/COPIES/FAXES (131,829)<br />

(127,535)<br />

(179,743)<br />

(119,440)<br />

(113,785)<br />

(125,100)<br />

(133,850)<br />

(141,184)<br />

5000002300002 ALIENATION <strong>OF</strong> STAND (62,723)<br />

(70,849)<br />

(76,929)<br />

(50,000)<br />

(50,000)<br />

(61,500)<br />

(64,575)<br />

(67,804)<br />

5000002300200 CAPITAL CONTRIBUTION ‐ ELECTRICITY (1,399,420)<br />

(1,495,476)<br />

(2,167,469)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300201 CAPITAL CONTRIBUTION ‐ ROADS (14,849)<br />

(213,481)<br />

(994,775)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300202 CAPITAL CONTRIBUTION ‐ SEWER (246,187)<br />

(219,867)<br />

(908,751)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300203 CAPITAL CONTRIBUTION ‐ WATER (185,806)<br />

(148,391)<br />

(38,374)<br />

(32,000)<br />

(32,000)<br />

(20,000)<br />

(24,000)<br />

(30,000)<br />

5000002300204 COMMISSION ON SALARY DEDUCTIONS (427,220)<br />

(276,546)<br />

(582,575)<br />

(444,775)<br />

(444,775)<br />

(475,020)<br />

(499,246)<br />

(519,715)<br />

5000002300205 COLLECTION COST RECOVERED ‐<br />

(70,291)<br />

(818,438)<br />

‐<br />

‐<br />

(217,500)<br />

(228,375)<br />

(239,794)<br />

5000002300206 CAPITAL CONTRIBUTION ‐ WASTE MANAGEMENT ‐<br />

(99,991)<br />

(296,933)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300207 CAPITAL CONTRIBUTION ‐ STORM WATER ‐<br />

(27,971)<br />

(191,490)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300208 OPEN SPACE CONTRIBUTION (LAND USE) ‐<br />

‐<br />

(6,237)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300300 DISCOUNT SETTLEMENT STORES (116,858)<br />

642,242<br />

(45,487)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002300301 DONATIONS RECEIVED (437 (437,427) 427) (28 (28,000) 000) ‐<br />

‐<br />

(10 (10,000,000) 000 000)<br />

‐<br />

‐<br />

‐<br />

5000002300400 ENDOWMENT FEES (412,679)<br />

(69,317)<br />

(15,750)<br />

(20,000)<br />

(20,000)<br />

‐<br />

‐<br />

‐<br />

5000002300500 FLAMABLE LIQUIDS (31,860)<br />

(38,011)<br />

(43,678)<br />

(32,600)<br />

(32,600)<br />

(35,208)<br />

(38,024)<br />

(41,066)<br />

5000002300800 INSURANCE CLAIMS ‐<br />

11,594,000<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301100 LOST & DAMAGED LIBRARY MATERIAL (1,086)<br />

(935)<br />

(765)<br />

(1,210)<br />

(1,210)<br />

(1,910)<br />

(1,437)<br />

(2,895)<br />

5000002301101 LOST & DAMAGED PROV LIBRARY MATERIAL (6,579)<br />

(3,228)<br />

(4,668)<br />

(3,887)<br />

(3,887)<br />

(3,260)<br />

(3,472)<br />

(4,789)<br />

5000002301200 MAN FEES ‐ UTILITY CO./RETAINED INCOME ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

(29,642,562)<br />

(20,421,169)<br />

(21,478,566)<br />

5000002301300 NEW CONNECTION FEES (378,755)<br />

(665,921)<br />

(1,027,216)<br />

(600,000)<br />

(600,000)<br />

(1,106,071)<br />

(1,181,284)<br />

(1,261,612)<br />

5000002301301 NUTRUTION SCHEME ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301500 PARKING METER FEES (175,735)<br />

(164,745)<br />

(141,455)<br />

(150,000)<br />

(150,000)<br />

(157,500)<br />

(165,375)<br />

(173,644)<br />

5000002301501 PENALTY FEES ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301502 POUNDING <strong>OF</strong> VEHICLES (610)<br />

(145)<br />

(3,119)<br />

(500)<br />

(2,000)<br />

(1,500)<br />

(1,575)<br />

(165,400)<br />

5000002301503 PR<strong>OF</strong>IT SALE <strong>OF</strong> ASSETS (2,563,409)<br />

(5,707,002)<br />

(3,673,436)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301700 REBATES PETROL ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301701 RECOVERABLE WORK (1,424,558)<br />

(2,831,256)<br />

(2,398,542)<br />

(2,801,000)<br />

(3,496,705)<br />

(3,150,000)<br />

(4,239,110)<br />

(4,668,521)<br />

5000002301702 REFUND WORKMENS COMPENSATION (78,582)<br />

(21,460)<br />

(4,267)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301703 REPAYMENT <strong>OF</strong> BURSARIES ‐ <strong>OF</strong>FICIALS ‐<br />

(12,850)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301704 REFUND SETA ‐<br />

(1,509,979)<br />

(373,261)<br />

(500,000)<br />

(500,000)<br />

(500,000)<br />

(500,000)<br />

(500,000)<br />

5000002301705 REFUNDS ‐<br />

‐<br />

‐<br />

‐<br />

(500,147)<br />

‐<br />

‐<br />

‐<br />

5000002301800 SALE <strong>OF</strong> REDUNTANT/OBSOLUTE ITEMS (1,444,609)<br />

(137,819)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

99


Votenumber Description<br />

Actual<br />

05/06<br />

History<br />

Actual<br />

06/07<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong><br />

2009/10 Multi Year Budget<br />

Draft 1<br />

Actual<br />

07/08<br />

Budget<br />

Open. Bal.<br />

Current Year 08/09 Medium Term Revenue & Expenditure<br />

5000002301801 SALE <strong>OF</strong> REFUSE BAGS/BINS (1,038)<br />

(66)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301802 SUNDRIES / UNALLOCATED INCOME 11,728<br />

(2,236,088)<br />

(5,908,073)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301803 SURPLUS CASH (88,855)<br />

(9,140)<br />

(27,443)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301804 SALE <strong>OF</strong> TENDER DOCUMENTS (117,310)<br />

(223,250)<br />

(186,504)<br />

(200,000)<br />

(200,000)<br />

(436,500)<br />

(458,325)<br />

(481,241)<br />

5000002301900 TELEPHONE INCOME (133,734)<br />

(95,118)<br />

(100,407)<br />

(100,000)<br />

(100,000)<br />

(106,800)<br />

(112,140)<br />

(117,747)<br />

5000002301901 TRAINING ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002301902 TRUST FUND SPORT RECREATION ADMIN ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002309995 SUB‐TOTAL OTHER INCOME (9,914,349)<br />

(4,268,489)<br />

(20,222,385)<br />

(5,055,412)<br />

(16,247,109)<br />

(37,540,432)<br />

(29,571,957)<br />

(31,393,977)<br />

5000002359997 SUB‐TOTAL OPERATING INC GENERATED (1 (1,404,772,055)<br />

404 772 055) (1 (1,729,216,947)<br />

729 216 947) (1 (1,902,325,887)<br />

902 325 887) (2 (2,156,135,227)<br />

156 135 227) (2 (2,268,617,628)<br />

268 617 628) (2 (2,956,831,720)<br />

956 831 720) (3 (3,536,493,447)<br />

536 493 447) (4 (4,171,914,188)<br />

171 914 188)<br />

5000002360000 LESS : INCOME FOREGONE ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002360800 INCOME FOREGONE ON ASS RATES (32,229)<br />

(17,751)<br />

153,434<br />

162,699<br />

162,699<br />

‐<br />

‐<br />

‐<br />

5000002360801 INCOME FOREGONE ON OTHER ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

132,139,845<br />

171,643,314<br />

210,311,079<br />

5000002369995 SUB‐TOTAL INCOME FOREGONE (32,229)<br />

(17,751)<br />

153,434<br />

162,699<br />

162,699<br />

132,139,845<br />

171,643,314<br />

210,311,079<br />

5000002379995 TOTAL DIRECT OPERATING INC GENERATED (1,404,804,284) (1,729,234,698) (1,902,172,453) (2,155,978,660) (2,268,454,929) (2,824,691,875) (3,364,850,133) (3,961,603,109)<br />

5000002400000 INTERNAL TRANSFERS ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002400001 ASS RATES ‐ DEPT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002400100 BOITSEPI ‐ DEPT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002400400 ELECTR BASIC ‐ DEPT (134,968)<br />

(92,043)<br />

(105,770)<br />

(107,214)<br />

(103,990)<br />

(120,793)<br />

(125,826)<br />

(138,408)<br />

5000002400401 ELECTR SALES ‐ DEPT (6,026,846)<br />

(4,124,211)<br />

(3,183,819)<br />

(4,142,215)<br />

(4,200,000)<br />

(6,406,464)<br />

(3,513,861)<br />

(3,865,247)<br />

5000002401100 LABORATORY SERVICES ‐ DEPT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002401500 PRINTS AND DRAWINGS ‐ DEPT (13,142)<br />

(4,899)<br />

(3,004)<br />

(3,427)<br />

(3,427)<br />

(3,639)<br />

(3,865)<br />

(4,100)<br />

5000002401700 REFUSE REMOVAL ‐ DEPT (148,370)<br />

(63,666)<br />

(67,169)<br />

(70,000)<br />

(70,000)<br />

‐<br />

‐<br />

‐<br />

5000002401800 SEWER ADD ‐ DEPT (249,560)<br />

(482,667)<br />

(456,868)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002401801 SEWER BASIC ‐ DEPT (78,662)<br />

(82,952)<br />

(86,279)<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000002402200 WATER BASIC ‐ DEPT (61,970)<br />

(46,684)<br />

(48,757)<br />

(51,740)<br />

(51,740)<br />

(57,000)<br />

(65,000)<br />

(72,000)<br />

5000002402201 WATER SALES ‐ DEPT (8,919,952)<br />

(11,842,460)<br />

(10,426,854)<br />

(12,000,000)<br />

(12,000,000)<br />

(14,000,000)<br />

(16,000,000)<br />

(18,000,000)<br />

5000002409995 SUB‐TOTAL INTERNAL TRANSFERS (15,633,469)<br />

(16,739,583)<br />

(14,378,521)<br />

(16,374,596)<br />

(16,429,157)<br />

(20,587,896)<br />

(19,708,552)<br />

(22,079,755)<br />

5000002459998 TOTAL OPERATING INCOME (1,420,437,753) (1,745,974,281) (1,916,550,974) (2,172,353,256) (2,284,884,086) (2,845,279,771) (3,384,558,685) (3,983,682,864)<br />

5000003000001 INCOME STATEMENT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000003010000 OPERATING (SURPLUS) / DEFICIT ‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

‐<br />

5000003010001 TOTAL EXPENDITURE 1,187,825,514 1,690,683,685 1,650,488,763 2,172,353,255 2,284,884,086 2,845,279,771 3,384,558,685 3,983,682,864<br />

5000003010002 TOTAL OPERATING INCOME (1,420,437,753) (1,745,974,281) (1,916,550,974) (2,172,353,256) (2,284,884,086) (2,845,279,771) (3,384,558,685) (3,983,682,864)<br />

5000003019995 TOTAL OPERATING (SURPLUS) / DEFICIT (232,612,239)<br />

(55,290,596) (266,062,211)<br />

(0)<br />

‐<br />

(0)<br />

(0)<br />

(0)<br />

Adjustment<br />

Budget<br />

Budget<br />

09/10<br />

Budget<br />

10/11<br />

Budget<br />

11/12<br />

100


CHAPTER 13<br />

13.1 IDP STRATEGIES PHASE<br />

13.2 Vision<br />

“A developmental municipality that continuously improves the quality of life of its residents.”<br />

13.3 The Motto<br />

You BELONG We CARE<br />

13.4 Mission<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> will accelerate Service Delivery and Socio Economic Development by:<br />

• Service delivery orientation grouped together to provide quality service delivery<br />

• Corporate : Institutional Capacity & Transformation<br />

• Finance : Financial Viability<br />

• Economic Development, Development Planning, Economic Viability & LED<br />

• Promoting Public Safety and Community Development.<br />

13.5 Values<br />

• Responsive<br />

• Disciplined & Responsible<br />

• Accountability & Transparency<br />

• Respect<br />

• Honesty and Integrity<br />

13.6 Core strategies<br />

• Provide Basic Services<br />

• Achieve Sustainable Financial Viability<br />

• Ensure Good Governance and Institutional Capacity<br />

• Deepening Democracy<br />

• Create the Culture of Effective Communication<br />

• Ensure Social and Economic Development<br />

• Promote a Safe, Secure, and Healthy Environment<br />

• Promote Optimal Spatial Development.<br />

101


12.7 Strategic Objectives<br />

Millennium<br />

Development Goals<br />

1. Eradicate extreme poverty<br />

and hunger<br />

2. Achieve universal primary<br />

education<br />

3. Promote gender equality<br />

and empower women<br />

4. Reduce child mortality<br />

5. Improve maternal health<br />

6. Combat HIV/AIDS,<br />

malaria, and other<br />

diseases<br />

7. Ensure environmental<br />

sustainability<br />

8. Develop a global<br />

partnership for<br />

development<br />

Issues National & Provincial<br />

Targets<br />

Roads & Stormwater • The National Department<br />

of Public Works advances<br />

and transforms the<br />

delivery of infrastructure<br />

to meet the physical<br />

needs and social needs of<br />

South Africa's poorest<br />

communities.<br />

• The EPWP aims to<br />

employ a million people<br />

by 2010.<br />

• Provision of economic<br />

and social infrastructure.<br />

• Support economic growth<br />

and investments through<br />

the provision of<br />

appropriate transport<br />

systems and socioeconomic<br />

infrastructure.<br />

Water & Sanitation • The roll-out of<br />

electrification to all formal<br />

Sedibeng Growth and<br />

Development<br />

Strategies<br />

• Roads improvement<br />

projects including<br />

tarring, signage and<br />

streets lights to ensure<br />

that our areas are safe<br />

and attractive.<br />

• Tarring and<br />

maintenance of roads<br />

and sidewalks<br />

• Upgrading of public<br />

transport infrastructure<br />

• Construct a regional<br />

sewer works by 2010<br />

<strong>Local</strong>ised Strategic:<br />

Guidelines /Objectives<br />

Provide sufficient and efficient<br />

pothole patching teams.<br />

• Tarring of all townships<br />

roads:<br />

Bophelong 2009/10<br />

Boitshepiville 2010/|11<br />

Sebokeng 2011/12<br />

Evaton 2012/13<br />

Rust-ter-Vaal 2013/14<br />

• Patching and resealing of<br />

existing roads on<br />

continuous basis.<br />

• Achieve 100% traffic<br />

signals functionality<br />

2010/11<br />

• Maintain all rural and semi<br />

rural gravel roads by<br />

2009/10.<br />

• Unblocking of all stormwater<br />

canals on<br />

continuous basis<br />

• Improve drainage system<br />

in and along all roads.<br />

• Develop road safety plans<br />

by the end of 2009/10<br />

• Develop integrated road<br />

design with infrastructure<br />

development<br />

• Ensure visible and<br />

appropriate road markings<br />

and signage by end of<br />

June 2009, in<br />

collaboration with<br />

Sedibeng District<br />

<strong>Municipality</strong>.<br />

• Provide waterborne<br />

sanitation to all stands by<br />

Core Strategies<br />

• To provide basic services<br />

• To provide basic services<br />

102


settlements will be<br />

continued to achieve<br />

universal access to<br />

electricity by 2012.<br />

Electricity • Facilitation of electricity<br />

supply industry (ESI)<br />

policy, legislation and<br />

regulations: Facilitate<br />

harmonised ESI policy,<br />

legislation and regulations<br />

for cross-border trading,<br />

focusing on issues<br />

concerning access to<br />

transmission capacity and<br />

cross-border tariffs.<br />

which can contribute<br />

significantly to<br />

improved service<br />

delivery and clean<br />

services.<br />

• Provide the basic<br />

services needed to<br />

improve the quality of<br />

life.<br />

• Revitalise aging<br />

infrastructure<br />

• Ensure basic<br />

infrastructure is in<br />

good working order<br />

and maintained<br />

end of June 2009.<br />

• Enforce bylaws to prevent<br />

the use of buckets system<br />

by residents where there<br />

is access to waterborne<br />

sanitation system is<br />

available by end of June<br />

2009.<br />

• Provide sewer to Malgere<br />

- Ward 30 2009/2010<br />

• Conduct a feasibility study<br />

by end of June 2009/10<br />

for making, pre-paid<br />

meters available to<br />

consumers as an option.<br />

• Investigate alternative<br />

level of service to rural<br />

areas by 2009/10<br />

• Minimise of all sewer<br />

spillages and control<br />

pollution by 2009/10.<br />

• Improve quality of water<br />

released into the<br />

environment (effluent) by<br />

2009/10.<br />

• Upgrading and<br />

maintenance of<br />

problematic pump stations<br />

by 2009/10.<br />

• Ensure that all formal<br />

urban areas in <strong>Emfuleni</strong><br />

have public lighting by<br />

2010/2011<br />

• Provide 50 Kwh per month<br />

FBE to all registered<br />

indigent households by<br />

end of June 2009.<br />

• Ongoing Maintenance of<br />

high mast and street lights<br />

• Achieve national<br />

household electrification<br />

target by 2010/2011<br />

• Ring-fence the electricity<br />

• To provide basic services<br />

103


Waste Management • The National Waste<br />

Management Strategy<br />

presents a long-term<br />

plan (up to the year<br />

2010) for addressing<br />

key issues, needs and<br />

problems experienced<br />

with waste<br />

management in South<br />

Africa. Aims to reduce<br />

both the generation<br />

and the environmental<br />

impact of waste. It<br />

presents a plan for<br />

ensuring that the<br />

socio-economic<br />

development of South<br />

• Recycling, revival and<br />

environmental<br />

resuscitation of our<br />

general environment<br />

that would turn<br />

environmental<br />

problems in the air,<br />

water and waste into<br />

economic opportunities<br />

and a green city.<br />

• Exploring opportunities<br />

for the recycling and<br />

regeneration of all<br />

forms of waste and<br />

improved waste<br />

management.<br />

• Exploring partnerships<br />

service by end of June<br />

2009<br />

• Increase functionality of all<br />

public lighting to 95% by<br />

2010/2011<br />

• Achieve NERSA<br />

responsiveness standards<br />

by end 2009.<br />

• Upgrading and improve<br />

level of maintenance of<br />

electricity network by<br />

2010/11<br />

• Capital re-investment into<br />

electricity network to meet<br />

NERSA requirements by<br />

end of June 2009<br />

• Implement energy saving<br />

programs incorporation<br />

with Eskom end June<br />

2009.<br />

• Annual revision of<br />

electricity tariffs in<br />

compliance with NERSA<br />

guidelines for<br />

implementation on 1 July<br />

every year.<br />

• Implement an effective<br />

refuse collection system –<br />

on going.<br />

• Achieve the National<br />

DEAT standards by June<br />

2009.<br />

• Integrated Waste removal<br />

strategy implementation<br />

by end of June 2009.<br />

• Continuous campaign to<br />

educate the community<br />

about the importance of a<br />

clean environment.<br />

• Implement a special<br />

programme to remove<br />

dumping in urban and<br />

rural areas by end June<br />

• Promote safe, secure and<br />

healthy environment<br />

104


Africa, the health of its<br />

people and the quality<br />

of its environmental<br />

resources are no<br />

longer adversely<br />

affected by<br />

uncontrolled and<br />

uncoordinated waste<br />

management.<br />

• Gauteng launched a<br />

comprehensive<br />

campaign on waste<br />

minimisation called<br />

Love Gauteng! Keep It<br />

Clean! A Clean<br />

Gauteng by the Year<br />

2010.<br />

with the private sector,<br />

NGO’s, labour and<br />

community based<br />

organisations to<br />

ensure clean and<br />

healthy air, land and<br />

water.<br />

• Transformation of the<br />

way we deal with<br />

landfill sites.<br />

• Exploring partnerships<br />

with private sector,<br />

NGOs, labour and<br />

community based<br />

organisations to<br />

ensure clean and<br />

healthy air, land and<br />

water.<br />

• This partnership would<br />

focus on conservation<br />

of biodiversity,<br />

research on cleaner<br />

technology,<br />

rehabilitation,<br />

awareness, recycling<br />

and improved<br />

prevention and<br />

compliance<br />

• Ensuring that the Klip<br />

and Vaal Rivers are<br />

sewerage free<br />

2009.<br />

• Development of Mini<br />

Dumps transfer stations<br />

infrastructure capacity by<br />

June 2010..<br />

• Continuous refuse<br />

removal service to all<br />

areas<br />

Fleet Management None • Efficiency • Implement fleet<br />

management strategy -<br />

ongoing until 2010/11<br />

• To implement and utilize<br />

the new electronic<br />

Workshop system to<br />

improve vehicle and<br />

equipment turn-around<br />

time – on going.<br />

• Implementation and<br />

utilization of the electronic<br />

fuel management system<br />

• Ensure social and economic<br />

development<br />

105


Housing • BNG prime objective is<br />

the eradication or<br />

upgrading of all informal<br />

settlements in the country<br />

by 2014/15. The plan is to<br />

upgrade informal<br />

settlements by providing<br />

essential infrastructure<br />

and services.<br />

• The housing policy also<br />

hopes to address the<br />

Millennium Development<br />

Goal of eradicating<br />

informal settlements by<br />

2014. The housing<br />

backlog continues to grow<br />

despite the delivery of<br />

1,831 million subsidized<br />

houses between 1994<br />

and March 2005, as well<br />

as the servicing of 57 065<br />

new sites and the building<br />

of 52 548 houses<br />

between April and<br />

September 2005<br />

• Social Contract for<br />

Integrated Human<br />

Settlement in Rural<br />

Housing Delivery, an<br />

effort to achieve housing<br />

for all by 2014.<br />

• Positioning of<br />

Sedibeng as preferred<br />

place to stay.<br />

• Development of<br />

decentralised service<br />

centres<br />

• Formalisation of<br />

Informal Settlements<br />

by 2008/09<br />

to ensure fuel stock<br />

control and to minimize<br />

losses end June 2009.<br />

• Upgrading of the<br />

Mechanical Workshop to<br />

maintain ELM owned<br />

vehicles, and to achieve<br />

accreditation from FML<br />

service providers by end<br />

of June 2010.<br />

• Eradication of Informal<br />

Settlements by 2014.<br />

• Develop Integrated<br />

Housing Plan, 2009/10.<br />

• Rural Housing Strategy<br />

and Development Plan by<br />

2009/10<br />

• Rural Housing Strategy<br />

and Development Plan<br />

2009/10.<br />

Waterlogged stands -<br />

Address the waterlogged<br />

stands situation by either<br />

relocating or rectification<br />

of stormwater related<br />

problems in collaboration<br />

with Service Delivery<br />

• Kwa-Masiza Hostel, Old<br />

Vereeniging Hospital<br />

council to resolve on the<br />

way forward by 2009/10<br />

• To ensure social and<br />

economic development<br />

<strong>Local</strong> Economic Development The Department of Trade and • Reinventing our • Implementation of LED • Achieve sustainable<br />

106


Industry developed a National<br />

Industrial Policy in 2006. The<br />

draft states the Industrial policy<br />

vision for 2014 as follows:<br />

• Diversify the economy<br />

from a traditional reliance<br />

on minerals and mineral<br />

processing and increase<br />

value added per capita<br />

• Participation in highervalue<br />

activities and value<br />

chain segments<br />

• Increase downstream<br />

beneficiation<br />

• Technological leadership<br />

in specific technologies<br />

• Promote a more labourintensive<br />

industrialization<br />

path<br />

• Sustainable labourintensive<br />

manufacturing<br />

and service sectors<br />

• Economic linkages which<br />

catalyse employment<br />

creation<br />

• Promote broad-based<br />

industrial growth<br />

• Greater levels of<br />

participation of historically<br />

disadvantaged people in<br />

the mainstream of the<br />

industrial economy<br />

• Create conditions for<br />

sustainable growth and<br />

tourism development<br />

Vision 2014<br />

• Reduce unemployment by<br />

half<br />

• Reduce poverty by half<br />

• Provide the skills required<br />

by the economy<br />

Land Use Management • The objective of the Land<br />

Use Management Bill is to<br />

economy by<br />

consolidating the<br />

existing sectors and<br />

exploring new sectors<br />

of growth<br />

• Renewing our<br />

communities by<br />

provision of basic<br />

services, regeneration<br />

and property<br />

development to<br />

improve the quality of<br />

living for all<br />

• Releasing human<br />

potential through<br />

accelerated investment<br />

in people and<br />

increased focus on the<br />

development of social<br />

capital<br />

• Reintegrating the<br />

region with the rest of<br />

Strategy by 2009/10<br />

• Building internal capacity<br />

(by filling of critical<br />

vacancies) 2009/10<br />

• Revitalisation of the CBD’s<br />

by 2009/10<br />

• Enhance relations with<br />

<strong>Local</strong> Business Sector -<br />

ongoing<br />

• Build internal capacity –<br />

ongoing<br />

• Implementation of Tourism<br />

development strategy by<br />

2009/10<br />

• Review by-laws governing<br />

informal trading and<br />

drawing management<br />

directives in collaboration<br />

with DLG by June 2009<br />

• Ongoing facilitation and<br />

support for agricultural<br />

development<br />

programmes.<br />

• Formalise cooperatives<br />

policy and facilitate<br />

registration in our supply<br />

chain database, ongoing.<br />

• Finalise the River Front<br />

Development Plan,<br />

Caravan Park (No time<br />

frame).<br />

• Revive hydrophonics<br />

projects, ongoing<br />

• Develop advertising<br />

strategy by June 2009<br />

• Resolve the Vaal Show<br />

Ground dispute in<br />

conjunction with SRAC<br />

• Finalised Council Property<br />

Audit by June 2009.<br />

financial viability<br />

• To promote optimal spatial<br />

development<br />

107


create a uniform national<br />

policy for the regulation of<br />

land use with the intention<br />

of eradicating apartheid<br />

settlements patterns, at<br />

the same time improving<br />

service delivery to these<br />

areas.<br />

• The bill is not clear how<br />

the Land Use Manage-<br />

ment Bill will co-exist with<br />

existing national and<br />

provincial legislation.<br />

Finance • Achieve sustainable<br />

financial viability.<br />

Gauteng, South and<br />

Southern Africa<br />

through improving<br />

connectivity and<br />

transport links<br />

• Active involvement of<br />

BBBEE companies in<br />

GDS projects.<br />

• Active promotion of<br />

youth, women and<br />

people with disabilities<br />

in education and<br />

training.<br />

• Active promotion of<br />

SMMEs<br />

• Procurement policies<br />

by government and<br />

private that enables<br />

BBBEE<br />

• Promote good<br />

governance<br />

• Increase in funds<br />

available for<br />

development<br />

• Zero tolerance to fraud<br />

and corruption<br />

• Efficiency<br />

• Promote good<br />

governance<br />

• Promote efficiency<br />

• Finance Charter:<br />

banking council<br />

involvement in funding<br />

bankable public<br />

projects<br />

• Promote efficiency<br />

• Transfer of Council owned<br />

business stands in terms<br />

of Conversion Act.<br />

• All Council disused<br />

properties to be identified,<br />

2009/10.<br />

• Develop a strategy to<br />

address the problem of<br />

livestock in townships in<br />

collaboration with<br />

Departments of Social<br />

Development and Safety<br />

and Security (No time<br />

frame)<br />

• Spatial Development<br />

Framework, to be<br />

developed in collaboration<br />

with SDM, 2009/10.<br />

• Consolidation of <strong>Emfuleni</strong><br />

Town planning Schemes<br />

in collaboration with DED<br />

and SDM by 2011<br />

Database Cleanup - Finance<br />

• Consumer database to be<br />

extended on the out of<br />

scope of work by 2009/10.<br />

• Reach 90% payment<br />

levels, by 2009/10.<br />

• Improves financials<br />

controls, ongoing.<br />

Creditors<br />

• Payments to be made<br />

within 30 days of<br />

statement<br />

• Develop and implement<br />

policy and procedures on<br />

trade and sundry creditors<br />

by 2009/10.<br />

Alternative Revenue Sources -<br />

Finance<br />

• Exploit and develop all<br />

sundry revenue resources<br />

by all sundry revenue<br />

• To achieve sustainable<br />

financial viability<br />

108


sources by 2009/10<br />

• Implementation of<br />

Property Rates act by 1<br />

July 2009<br />

Credit Control - Finance<br />

• Current account collection<br />

to be 90% by 2009/10.<br />

• Increase current collection<br />

rate in townships to 20%<br />

by 2009/10.<br />

• Collect 20% arrears from<br />

the townships by 2009/10.<br />

Budget/Financial Control<br />

• Implementation of MFMA<br />

reforms and best practice<br />

by 2009/10.<br />

• Implementation and<br />

enforcement of the<br />

controls for unqualified<br />

report by 2009/10.<br />

• Achieve unqualified AG<br />

report by 2010/11.<br />

• Renegotiate all industrial<br />

contracts (1987): Service<br />

Delivery to be included.<br />

• Resolve Eskom contingent<br />

liability by 2009/10:<br />

Service Delivery to be<br />

included.<br />

• Implementation of asset<br />

management<br />

Billing/Revenue enhancement<br />

• Metering of all consumers<br />

by 2009/10. (Metsi a<br />

Lekoa).<br />

• Exception reports to be<br />

vetted by Metsi a Lekoa<br />

prior to billing system.<br />

• Correct meter reading by<br />

2009/10 (Metsi a Lekoa)<br />

• Explore revenue<br />

enhancement strategies<br />

annual.<br />

Supply Chain Management<br />

109


Internal Audit • Ensure good governance<br />

and institutional capacity.<br />

• Assist all municipality to<br />

achieve a clean audit by<br />

2011<br />

• Build Capacity by 2009/10<br />

• Review and<br />

implementation of policies<br />

and procedures<br />

• Improve the turn around<br />

times as per procedures<br />

• Maintain the integrity of<br />

the supplier database<br />

annually<br />

• Develop an Annual audit<br />

plan by May 2009 for<br />

2009/10<br />

• Implementation of the<br />

Annual Plan by 2009/10<br />

• Create internal capacity by<br />

2009/10<br />

• Develop and implement<br />

the audit matrix to address<br />

the qualifications raised by<br />

the Auditor General by<br />

July 2009<br />

• Implementation of the Risk<br />

Management Plan, Fraud<br />

and Anti Corruption<br />

strategy by July 2009<br />

• Ensure good governance<br />

and institutional capacity<br />

110


Corporate Services Communication<br />

• Enable the maximization<br />

of investment in and<br />

through the ICT sector,<br />

prioritizing investment in<br />

ICT broadband<br />

Infrastructure by 2009<br />

Develop and implement<br />

ICT policies and<br />

strategies and monitor<br />

and evaluate their impact<br />

on South Africa‘s<br />

Development<br />

Agenda2009<br />

• Ensure that ICT<br />

infrastructure and<br />

services are available,<br />

reliable and<br />

affordable2009<br />

• Contribute to achieving<br />

the objective of<br />

government functioning<br />

as one entity<br />

• Priorities skills<br />

development in building a<br />

safe, secure and<br />

inclusive information<br />

society.2009<br />

Labour<br />

Contribute towards<br />

employment creation into the<br />

following days by 2009<br />

• To ensure that labour<br />

policies and strategies<br />

complement growth and<br />

development objectives<br />

• Sector Skills plans<br />

aligned to sectoral growth<br />

plans<br />

• Exit strategies for<br />

unemployed people in<br />

skills programmes,<br />

learnerships,<br />

apprenticeships and<br />

• Restrict development<br />

of marginalised<br />

housing settlements<br />

• Implement an integrated<br />

marketing and<br />

communication strategy<br />

by 2009/10.<br />

• Establishment and<br />

maintenance of an<br />

effective communication<br />

forum – by monthly basis<br />

• Implementation of HRD<br />

strategy by 2009/10<br />

• Implementation<br />

Institutional<br />

Transformation by<br />

2009/10.<br />

• Create benefit<br />

administration capacity by<br />

December 2009.<br />

• Provide ICT capacity by<br />

December 2009.<br />

• Create capacity for<br />

language services<br />

including multilingualism<br />

by June 2009.<br />

• Create communication<br />

marketing capacity by<br />

December 2009/10.<br />

• Upgrading the municipal<br />

website by June 2009.<br />

• Implementing labour<br />

relations system by<br />

2009/10.<br />

• Creation of EAP capability<br />

(for example HIV & Aids<br />

management) Clinical<br />

development &<br />

implementation by June<br />

2009<br />

• Implement occupational<br />

health and safety<br />

legislation (No time frame)<br />

• Maintain a tracking system<br />

of Mayoral and Council<br />

resolution on an on going<br />

basis.<br />

• Ensure good governance<br />

and institutional capacity<br />

111


other scarce skills<br />

interventions.<br />

Promoting equity in the labour<br />

market by 2009<br />

• Alleviating poverty by<br />

addressing the needs of<br />

vulnerable people by<br />

setting and enforcing<br />

norms and standards that<br />

ensure that all existing<br />

and new jobs are<br />

equitable and do not<br />

jeopardize workers rights<br />

by 2009<br />

• Strengthen enforcement<br />

mechanism whilst<br />

promoting the culture of<br />

self –regulation<br />

Protecting vulnerable workers<br />

by 2009<br />

• Workers in vulnerable<br />

sectors and segments<br />

will be identified and<br />

protection extended<br />

Strengthening social<br />

protection by 2009<br />

• Achieving financial<br />

viability and sustainability<br />

of the Unemployment<br />

Insurance Fund and<br />

Compensation Fund<br />

• Extending the coverage of<br />

unemployment insurance<br />

to other vulnerable<br />

workers.<br />

• The national integration of<br />

compensation and<br />

occupational health and<br />

safety competencies<br />

across government<br />

departments.<br />

• The reduction of<br />

occupational health and<br />

safety incidents in<br />

• Implementing and<br />

monitoring the Workplace<br />

Skills Plan (WSP)<br />

ongoing.<br />

• Develop and implement<br />

Employment Equity Plan<br />

by July 2009<br />

• Implementation of a<br />

contract management<br />

policy – ongoing.<br />

• Promulgation of reviewed<br />

credit control bylaws as<br />

well as standing orders by<br />

October 2009.<br />

• Review of bylaw as per<br />

departmental needs on an<br />

on going basis<br />

• Civil litigation procedures<br />

– a plan to reduce case<br />

load and resolve matters<br />

accordingly by July 2009.<br />

• Policy review and<br />

development by 2009/10.<br />

Twenty (20) policies to be<br />

drafted.<br />

• Development of an<br />

international relations<br />

policy by 2009/10.<br />

• Development of an<br />

intergovernmental<br />

relations policy by<br />

2009/10.<br />

• Establish storage<br />

document management<br />

system in Houtkop Offices<br />

2010/2011<br />

• Establish integrated<br />

document management<br />

system – ongoing.<br />

112


targeted industries.<br />

Enhancing skills development<br />

by 2009<br />

• Skills to assist the country<br />

‘s competitiveness and<br />

growth as part of the<br />

broader Human<br />

Resources Development<br />

Strategy<br />

• Scarce Skills to support<br />

the implementation of the<br />

Accelerated and Shared<br />

Growth Initiative for<br />

South Africa(ASGI-SA)<br />

• Improved participation of<br />

small, medium, and micro<br />

Enterprises in skills<br />

development<br />

• Promote productive and<br />

equitable citizenship by<br />

aligning skills<br />

development with<br />

national strategies for<br />

growth and development<br />

and accelerating Broadbased<br />

Black Economic<br />

Empowerment by 2010<br />

Promoting sound labour<br />

relation by 2009<br />

• Ensuring that the<br />

proportion of workers<br />

covered by collective<br />

agreements is increased<br />

Strengthening the capacity of<br />

labour market institutions by<br />

2009<br />

• Improve service deliver<br />

provided by statutory<br />

bodies and public entities<br />

associated with the<br />

department, through<br />

clear performance<br />

standards for relevant<br />

agencies<br />

113


Gender, Youth and Disability Gender (target by 2013)<br />

• To promote job creation<br />

and economic<br />

opportunities and to<br />

balance dependence on<br />

social grants.<br />

• Cooperating with strategic<br />

partners, work towards<br />

the creation of a violence<br />

–free society by<br />

significantly reducing<br />

gender-base violence<br />

• Actively engage the<br />

judiciary and the legal<br />

sector to promote gender<br />

equality and improve the<br />

status of women in the<br />

judicial system.<br />

• Effective engagement<br />

with the media and<br />

advertising agencies with<br />

a view to enabling these<br />

institutions to become<br />

more gender sensitive<br />

and to increase women’s<br />

• Young people are<br />

missing: impact of<br />

HIV/AIDS epidemic<br />

and leave the area for<br />

education and jobs<br />

• Raise the skill profile<br />

through support of<br />

educational institutions<br />

on formal schooling<br />

and tertiary institutions<br />

• Policy on Gender, youth<br />

and disability by 2009/10<br />

(Mayor’s office to develop<br />

policies and monitoring of<br />

implementation and line<br />

departments to<br />

implement)<br />

• Alignment of policies and<br />

programmes with the SDM<br />

by October 2009.<br />

• Internal training and<br />

support by August 2009 to<br />

Executive office staff.<br />

• Development and<br />

implementation of annual<br />

programmes for the youth,<br />

disabled and gender<br />

• To ensure social economic<br />

development<br />

114


epresentation within<br />

these<br />

business/institutions.<br />

• Develop innovative<br />

campaign/ conjunction<br />

with civil society partners<br />

and where appropriate<br />

government, to raise<br />

awareness among and<br />

traditional leaders.<br />

Youth<br />

• To ensure access to<br />

updated information on<br />

the status of youth<br />

development to inform<br />

the work of the NYC by<br />

2009<br />

Collect data from<br />

secondary sources on<br />

specific items:-<br />

access to education,<br />

access to and impact of<br />

the social security system<br />

health<br />

youth, crime and the<br />

justice system<br />

impact of two-tier labor<br />

market on youth<br />

• To provide a framework to<br />

direct all sectors involved<br />

in youth development<br />

initiatives 2007<br />

• To guide initiatives<br />

towards economic<br />

participation and<br />

empowerment of young<br />

people by 2007<br />

• To ensure meaningful<br />

participation in<br />

international<br />

engagements<br />

• To actively promote the<br />

adoption of healthy<br />

lifestyles among youth-<br />

115


ongoing<br />

• To promote the<br />

institutionalization of<br />

youth participation in<br />

local government by<br />

2007<br />

Disability<br />

• Government departments<br />

and state bodies have a<br />

responsibility to ensure<br />

that, in each line function,<br />

concrete steps are taken<br />

to ensure that people<br />

with disabilities are able<br />

to access the same<br />

fundamental rights and<br />

responsibilities as any<br />

other South African.<br />

• The Office on the Status<br />

of Disabled Persons will<br />

work together with, and<br />

parallel to, the various<br />

state bodies and<br />

departments in order to<br />

further the development<br />

of a disability friendly<br />

environment<br />

Public Safety Public Safety by 2009<br />

• Violence Prevention for<br />

out-of-School Youth.<br />

• Improving the functioning<br />

of Community Policing<br />

Forum.<br />

• Prevention of Violence<br />

against women must be<br />

implemented.<br />

• Each <strong>Local</strong> Government<br />

should have safety<br />

strategy.<br />

• Expanding the role of<br />

local government in crime<br />

prevention<br />

• Improve our human<br />

settlements and thus<br />

the quality of life of our<br />

people<br />

• Renew our<br />

communities through<br />

urban reform by<br />

making them safe,<br />

attractive and clean<br />

• <strong>Emfuleni</strong> <strong>Local</strong><br />

<strong>Municipality</strong> building must<br />

be tightened, including<br />

monitoring.<br />

• Achieve 100% traffic<br />

signals functionality<br />

2010/11<br />

• Manage security contracts<br />

• Improve Security at all<br />

Council buildings by<br />

2009/10.<br />

• Investigate fraud and<br />

losses in relation to<br />

Council properties and<br />

transactions.<br />

• <strong>Local</strong>ised Crime<br />

• To promote safe, secure<br />

and healthy environment<br />

116


Prevention Strategy by<br />

2009/10.<br />

• Implement Joint Safety<br />

Plans, on going<br />

• Ensure effective public<br />

participation in all<br />

CPFs/Sector Forums in all<br />

wards.<br />

• Expand CCTV to<br />

Vanderbijlpark CBD and<br />

crime hot spots areas.<br />

• Implement and capacitate<br />

by-law Enforcement Unit<br />

by 2010/11.<br />

• Implement a 24/7 Traffic<br />

and Security Service<br />

2009/10.<br />

• Capacitate Public Safety<br />

divisions in view of 2010<br />

• and beyond.<br />

• Installation of fire hydrants<br />

in all townships by<br />

2010/11.<br />

• Ongoing training on the<br />

fire fighting (fire bucket<br />

system) should be<br />

extended to all wards and<br />

rural areas.<br />

• Hazmat vehicle fully<br />

equipped. Procure in<br />

20909/10.<br />

• Do a feasibility study to<br />

establish fire precincts in<br />

order to reduce response<br />

in fire safety and fighting<br />

by 2009/10.<br />

• A functional Disaster<br />

Management Unit by<br />

2009/10.<br />

• Implement GIS to assist in<br />

fire safety and fighting.<br />

• <strong>Local</strong> Road Safety Plans<br />

by 2009/10.<br />

• Review and implement by-<br />

117


Environmental Management,<br />

Health & Social Development<br />

Social Development<br />

• Create an enabling<br />

environment for social<br />

and human capital in<br />

vestment.<br />

• Promote social<br />

integration.<br />

• Establish social protection<br />

initiatives to build the<br />

capacity of vulnerable<br />

groups.<br />

• Provide a comprehensive<br />

social security system.<br />

• Develop leadership in<br />

social development to<br />

ensure the deepening of<br />

social policy discourse<br />

and evidence based<br />

decision making.<br />

• Engage in the effective<br />

and efficient<br />

management of social<br />

development<br />

programmes and<br />

activities in partnership<br />

with civil society and<br />

other interested parties.<br />

Environmental Management<br />

• Exploring partnerships<br />

with the private sector,<br />

NGO’s labour and<br />

community based<br />

organisations to ensure<br />

clean and healthy air,<br />

land and water<br />

• Implementation Air<br />

quality management<br />

• Development of<br />

environmental<br />

management framework<br />

and plan.<br />

• While the scourge of<br />

poverty, ill healthy and<br />

HIV and AIDS epidemic<br />

continues to plaque our<br />

people, a concerted<br />

partnership of all the<br />

stakeholders in Sedibeng<br />

working with all spheres<br />

of government and<br />

national partners can turn<br />

this around<br />

• Provide basic services<br />

needed to improve the<br />

quality of life.<br />

• Recognise that people<br />

laws.<br />

• Parking meters to be<br />

procured and maintained<br />

by 2009/10. Speed<br />

humps: Conduct<br />

investigations in<br />

conjunction with Transport<br />

Department.<br />

• Establish regional offices<br />

for Traffic and Security in<br />

Evaton and Sebokeng.<br />

• Establishment of<br />

Municipal Court in<br />

Vereeniging and<br />

Sebokeng by 2010/11.<br />

• Secure the 4 AQMS at<br />

their sites (Three Rivers,<br />

Sebokeng, Sharpeville<br />

and Vanderbijlpark).<br />

• Develop and implement a<br />

Environmental<br />

Management Plan by<br />

2009/10.<br />

• Air Quality Management<br />

2009/10.<br />

• Intersectoral Forums must<br />

meet regularly (10 times<br />

per annum)<br />

• Maintain a comprehensive<br />

PHC in 18 clinics.<br />

• Maintain drug shortage<br />

lower than the national<br />

norm of 2%.<br />

• Conduct two workshops<br />

per annum for the training<br />

of Clinic Health<br />

Committees.<br />

• That staff recruited to fill<br />

the organogram by<br />

2012/13 as per the<br />

approved organogram.<br />

• Five clinics upgraded by<br />

2012/13<br />

• To promote safe, secure<br />

and healthy environment<br />

118


• Create conditions for<br />

sustainable tourism<br />

growth and development.<br />

• Promote the conservation<br />

and sustainable<br />

development of our<br />

natural resources.<br />

• Protect and improve the<br />

quality and safety of the<br />

environment.<br />

• Promote a global<br />

sustainable development<br />

agenda and<br />

transformation.<br />

Health<br />

• Reducing the number of<br />

HIV infections by 2011.<br />

• Ensure that 8 out of 10<br />

people who need<br />

antiretroviral treatment<br />

receive it.<br />

• Implement the TB<br />

strategic plan by 2007-<br />

2011.<br />

SRAC Sports and Recreation<br />

• To increase level of<br />

participation in sports and<br />

are our greatest assets<br />

• Attract more people to<br />

the region as a preferred<br />

place to stay.<br />

• Provide basic services<br />

needed to improve the<br />

quality of life.<br />

• Each municipality to<br />

identify their flagship<br />

projects for 2010 and<br />

• Build 3 clinic by 2012/13<br />

• Establish social<br />

Development by 2009/10.<br />

• Coordinate NGO’s &<br />

CBO’s and assist with<br />

funding applications<br />

• Data base of NGO’s<br />

updated and shared with<br />

all the relevant<br />

stakeholders<br />

• ID, Birth Certificates &<br />

grants campaigns.<br />

(2008/09 – 2011/12)<br />

• Development of Social<br />

development Master Plan<br />

(2010/11)<br />

• Transfer and fund the<br />

Indigent Verification<br />

Section before end of<br />

June 2009.<br />

• Implementation of Social<br />

Development program to<br />

support the desk in the<br />

Office of the Executive<br />

Mayor (4 projects in<br />

2009/10 & 4 projects in<br />

2010/11)<br />

• Awareness campaigns to<br />

engage the community in<br />

cluster activities<br />

• Maintain local HIV/AIDS<br />

forum and Chronic<br />

diseases<br />

• Provide a comprehensive<br />

-Primary Health Care<br />

service in clinics where<br />

appropriate.<br />

• Train and develop staff<br />

and ward health subcommittees<br />

• Maintain and<br />

capacitate/develop Arts &<br />

Culture Forum in ELM.<br />

• Create the culture of<br />

effective communication<br />

• To promote safe, secure<br />

119


ecreation by all South<br />

Africans.<br />

• To raise sport profile<br />

amongst decision<br />

makers in the face of<br />

conflicting and compeling<br />

priorities.<br />

• To maximise the<br />

probability of success of<br />

SA teams and individuals<br />

in major international<br />

events.<br />

• To place sport in the fore<br />

front of efforts to address<br />

issues of national<br />

importance.<br />

• To host a world class<br />

2010 soccer tournament<br />

Arts and Culture<br />

• Promote heritage policy<br />

and legislative<br />

awareness.<br />

• Promote and preserve the<br />

archival heritage.<br />

• Improve access to public<br />

facilities like libraries and<br />

parks.<br />

• Increase awareness of<br />

heritage celebrations.<br />

long term with regards<br />

to Sports and<br />

Recreation Facilities<br />

• Building and<br />

maintaining the town<br />

entrances, parks and<br />

cemeteries<br />

• Greening and tree<br />

planting<br />

• Sports and recreation<br />

facilities<br />

Parks & Cemeteries • Identify land and<br />

establish new<br />

cemeteries for burials.<br />

• Negotiate the transfer of<br />

the 2 MPCC with GP by<br />

June 2009.<br />

• Implementation of the<br />

2010 World Cup Strategy<br />

(Legacy Projects).<br />

• To ensure racial<br />

integration through mass<br />

participation program -<br />

ongoing<br />

• Implement the ward based<br />

IDP projects - ongoing.<br />

• Partnering with relevant<br />

stakeholders for sports,<br />

arts, and culture<br />

programmes.<br />

• Establishing, upgrading<br />

and maintaining all the<br />

sports and recreational<br />

facilities.<br />

Libraries<br />

• Upgrading and<br />

maintenance of existing<br />

libraries.<br />

• Construction of new<br />

libraries (Boipatong<br />

Library)<br />

• Support 2010 strategy and<br />

legacy projects<br />

• Conduct library outreach<br />

programmes through<br />

mass participation (e.g.<br />

strengthening of libraries<br />

community).<br />

• Revision of the<br />

Cemeteries Master Plan<br />

(2009/10).<br />

• Plan the establishment of<br />

1 regional park per annum<br />

in each area by June<br />

2009.<br />

• Develop Master Plan for<br />

the River Front Precinct<br />

and healthy environment<br />

• Promote safe, secure and<br />

healthy environment<br />

120


y 2009/10.<br />

• Create capacity to<br />

manage the cemeteries<br />

2009/10.<br />

• Identify land for the long<br />

term development of<br />

cemeteries 2009/10.<br />

Office of the Mayor • Provide political oversight<br />

on the implementation of<br />

Council Resolutions.<br />

• Monitoring the<br />

implementation of IDP,<br />

Budget and SDBIPs.<br />

• To strengthen relations<br />

and coordinates activities<br />

between various level of<br />

government, international<br />

relations and development<br />

of joint programmes.<br />

• Development of strategic<br />

plans HIV/Aids, disability<br />

and the youth.<br />

• Policy on Gender, youth<br />

and disability by 2009/10.<br />

• Design the Coat of Arms<br />

for the municipality by<br />

2009/10.<br />

Office of the Speaker • Provide learning<br />

experiences and<br />

opportunities through<br />

study visits to other<br />

municipalities before<br />

August 2009.<br />

• Monitor and support ward<br />

Committees – ongoing<br />

• Implement public<br />

participation policy from<br />

July 2009<br />

• To create a platform for<br />

community participation<br />

and create a culture of<br />

consultation and<br />

• To ensure good governance<br />

and institutional capacity<br />

• Deepening democracy<br />

• Deepening democracy<br />

121


engagement -ongoing<br />

• Establish the necessary<br />

sub-committees within<br />

ward communities-<br />

ongoing<br />

• Provide orientation and<br />

continuous training to<br />

members of ward<br />

committees and subcommittees<br />

• Provide logistical support<br />

to ward committees by<br />

2009/10<br />

Committees of Council (for<br />

example, Section 80) –<br />

Speaker<br />

• Implement Council<br />

oversight committees<br />

• Creation of a platform for<br />

the community to interact<br />

with their elected leaders<br />

through People’s (Annual<br />

Event).<br />

122


CHAPTER 14<br />

14.1. PROJECT PHASE<br />

The project phase outlines all the projects that have been identified in the municipal area.The detailed project template shows the project code, name, various<br />

financial year and source of funds. Most of the Council projects are funded through Municipal Infrastructure Grant (MIG). The other project are funded through<br />

Municipal own funds such as operational and capital funds, Sedibeng District and provisional departments.<br />

123


14.1.1 FUNDED IDP PROJECTS FOR 2009/10<br />

CODE PROJECT NAME 2009//2010 2010//11 2011//12 Source of Funds<br />

MAYOR'S <strong>OF</strong>FICE<br />

MO-02 Implementation of Gender,Elderly and Children programs R 450,000.00 R 650,000.00 R 750,000.00 OPEX<br />

MO-03 Implementation of Youth programmes R 500,000.00 R 600,000.00 R 700,000.00 OPEX<br />

MO-05 Implementation of Disability Programmes R 250,000.00 R 350,000.00 R 450,000.00 OPEX<br />

MO-06 Implementation of HIV/AIDS Programme R 2,500,000.00 R 500,000.00 R 600,000.00 OPEX<br />

SPEAKER'S <strong>OF</strong>FICE<br />

TOTAL R 3,700,000.00 R 2,100,000.00 R 2,500,000.00<br />

SP-01 By-election of Ward Committees<br />

Training & Capacity Building of Ward Committees (peoples<br />

R 100,000.00<br />

OPEX<br />

SP-02<br />

assembly) R 900,000.00<br />

OPEX<br />

SP-03 MPAC Research & oversight work R 500,000.00<br />

OPEX<br />

SP-04 Roadshows, Imbizos & Public meetings R 1,500,000.00<br />

OPEX<br />

SP-05 Training & Capacity Building for Councillors R 1,500,000.00<br />

OPEX<br />

SP-06 Retreat for Petitions Management Committee R 500,000.00<br />

OPEX<br />

COMMUNICATION<br />

TOTAL R<br />

5,000,000.00<br />

CM-01 Implement External/ Internal Communication Strategy in 43 Wards R 750,000.00 R 1,482,917.00<br />

OPEX<br />

TOTAL R 750,000.00 R 1,482,917.00<br />

CORPORATE SERVICES<br />

CO-17 Set up cost for printing in-house R 4,000,000.00<br />

ELM<br />

IDP REVIEW<br />

TOTAL R<br />

4,000,000.00<br />

IDPR-01 IDP and Budget Roadshow R 70,000.00 R 80,000.00 R 80,000.00 ELM<br />

PMU<br />

TOTAL R 70,000.00 R 80,000.00 R<br />

80,000.00<br />

PMU-02 Upgrading of the PMU R 300,000.00<br />

MIG & ELM<br />

PMU-03 Master plan (W&S, R&S, Cemetries and Electricity) R 1,000,000.00<br />

MIG & ELM<br />

HOUSING<br />

TOTAL R<br />

1,300,000.00<br />

HO-09 Provision of Basic services: Bophelong Chris Hani 1<br />

Provision of basic services: New Village & establishment of<br />

R 13,289,250.00<br />

Dept of Housing<br />

HO-10<br />

township R 11,244,750.00<br />

Dept of Housing<br />

HO-11 Provision of basic services: Quaggasfontein R - R 2,132.00<br />

Dept of Housing<br />

HO-12 Provision of basic services: Tshepiso North Extension 4 R - R 13,458.00<br />

Dept of Housing<br />

HO-14 Formalizing and development of Vaaloewer R 500,000.00 R 3,190,000.00<br />

Dept of Housing<br />

FACILITIES<br />

TOTAL R 25,034,000.00 R 3,205,590.00<br />

FC-02 Upgrade Maintainance Workshop and Offices R 500,000.00<br />

ELM<br />

FC-05 Refurbish main building,Vanderbijlypark R 1,000,000.00<br />

ELM<br />

FC-06 Install air conditioners R 125,000.00 R 250,000.00<br />

ELM<br />

124


FC-19 Tools R 50,000.00<br />

ELM<br />

FC-22 Upgrading of HR building R 825,000.00<br />

ELM<br />

TOTAL<br />

LAND USE MANAGEMENT<br />

R 2,500,000.00 R<br />

250,000.00<br />

U-03 Opening of Township registers R 124,752.00 R 132,237.00 R 140,171.00 OPEX<br />

U-04 Review Spatial Development Framework Plan R 420,000.00<br />

OPEX<br />

PROPERTY<br />

TOTAL R 544,752.00 R 132,237.00 R<br />

140,171.00<br />

PR-05 Personnel training on computer skills and customer care R 25,000.00<br />

OPEX<br />

PR-06 Deeds office linkage R 12,000.00<br />

OPEX<br />

TOTAL R<br />

37,000.00<br />

LOCAL ECONOMIC DEVELOPMENT<br />

LE-01 Establishment of Sectoral Business Forums R 60,000.00 R 80,000.00 R 260,000.00 OPEX<br />

LE-06 Development and implementation of a Marketing Strategy R 50,000.00<br />

R 50 00 R 400,000.00 OPEX<br />

LE-07 Assistance with the establishment of SMME’s and co-operatives R 100,000.00 R 80,000.00 R 260,000.00 OPEX<br />

LE-08 Establishing Public Private Partnerships and linkage programs<br />

Development of comprehensive data bases for SMME’s and Skills,<br />

R 70,000.00 R 80,000.00 R 260,000.00 OPEX<br />

LE-09<br />

Informal Trading Sector and Advertising. R 70,000.00 R 80,000.00 R 260,000.00 OPEX<br />

LE-11 Implementation of a well controlled permit system R 20,000.00 R 20,000.00 R 80,000.00 OPEX<br />

LE-12 Training programs based on capacitating traders R 70,000.00 R 80,000.00 R 260,000.00 OPEX<br />

LE LE-13 13 RReviving i i existing i ti poverty t projects j t R 250 250,000.00 000 00<br />

R 600 600,000.00 000 00 OPEX<br />

LE-15 Finalising and implementing an advertising Policy R 250,000.00<br />

NDG<br />

LE-16 Development of an economic hub in Boipatong R 1,210,324.00<br />

NDG<br />

LE-17 Development of an economic hub in Sebokeng R 1,210,324.00<br />

NDG<br />

LE-18 Development of an economic hub in Sharpeville R 1,210,324.00<br />

NDG<br />

LE-19 Economic hub in Bophelong R 1,210,324.00<br />

NDG<br />

TOURISM<br />

TOTAL R 5,781,296.00 R 420,000.00 R 2,380,000.00<br />

TM-01 Vaal River Carnival R 500,000.00 R 900,000.00 R 3,150,000.00 OPEX<br />

TM-02 Implementation of Signage Policy R 50,000.00 R 100,000.00 R 700,000.00 OPEX<br />

TM-03 Tourism related training for SMME’s and co-operatives R 20,000.00 R 80,000.00 R 260,000.00 SEDIBENG<br />

CEMETRIES<br />

TOTAL R 570,000.00 R 1,080,000.00 R 4,110,000.00<br />

CS-02 Identify land and establish new cemetery for burials<br />

Upgrading of all closed cemeteries (including roads, greening,<br />

R 4,000,000.00 R 4,500,000.00 R 4,000,000.00 NDG<br />

CS-03<br />

stormwater & buildings) R 3,000,000.00 R 1,972,279.00<br />

NDG<br />

PARKS<br />

TOTAL R 7,000,000.00 R 6,472,279.00 R 4,000,000.00<br />

PS-01 Equipments for cutting problematic trees R 400,000.00 R 2,850,000.00<br />

ELM<br />

PS-02 Upgrade nursery next to Boipatong R 2,000,000.00 R 10,650,000.00<br />

NDG<br />

PS-03 Appoint consultant for EAI on 613 undeveloped parks in ELM R 1,000,000.00 R 25,000,000.00<br />

NDG<br />

PS-04 Equipments for grass cutting R 600,000.00 R 35,000,000.00<br />

ELM<br />

TOTAL R 4,000,000.00 R 73,500,000.00<br />

ORGANISATION DEVELOPMENT<br />

OD-01 To implement an Employee Assistance Plan R 300,000.00 R 3,000,000.00<br />

OPEX<br />

125


OD-02 Review a performance appraisal framework R 300,000.00<br />

OPEX<br />

TOTAL R 600,000.00 R 3,000,000.00<br />

HUMAN RESOURCES<br />

HR-02 Develop Human Management System R 700,000.00 R 868,611.20<br />

OPEX<br />

HR-03 Reconcile HR System with Payday R 400,000.00 R 488,593.80<br />

OPEX<br />

HR-16 Training of Senior Staff (Good Governance & Legislation) R 300,000.00 R 325,729.20<br />

OPEX<br />

LEGAL DEPARTMENT<br />

TOTAL R 1,400,000.00 R 1,682,934.20<br />

LS-01 Review existing policies, by laws and systems R 500,000.00<br />

OPEX<br />

TOTAL R<br />

500,000.00<br />

ENVIRONMENTAL HEALTH<br />

EN-01 Procure a Smoke Density Meter and Noise Level Meters<br />

Implement the Cleaner concept for household energy in Evaton<br />

R 373,815.00 R 398,112.00 R 423,990.00 OPEX/SEDIBENG<br />

EN-04<br />

(MHS-03)<br />

Training of staff in the following areas: computer skills, financial<br />

R 600,210.00 R 300,000.00 R 300,000.00 MIG & ELM<br />

EN-05<br />

management and report writing R 10,000.00 R 10,000.00 R 10,000.00 ELM/SEDIBENG<br />

EN-07 Appointment of Pest Control Officer R 218,181.00 R 344,844.00 R 368,817.00 SEDIBENG<br />

EN-09 Training of staff in the following area: Vector Control R 20,000.00 R 20,000.00 R 20,000.00 SEDIBENG<br />

EN-10 Training of staff in the following area: Health Care Risk Waste R 10,000.00 R 10,000.00 R 10,000.00 SEDIBENG<br />

EN-14 Replacement of uniforms and safety clothes R 52,500.00 R 55,912.00 R 59,546.00 SEDIBENG<br />

EN-15 Maintenance of filling system<br />

Implement the Integrated Environmental Management Plan<br />

R 11,000.00 R 12,500.00 R 14,000.00 OPEX<br />

EN-17<br />

(Appoint staff, equipment, furniture, operational expenditure, etc.) R 250,000.00<br />

OPEX<br />

PRIMARY HEALTH<br />

TOTAL R 1,545,706.00 R 1,151,368.00 R 1,206,353.00<br />

PH-03 Maintenance of all clinics (PHC-04) R 500,000.00 R 257,000.00 R 282,000.00 OPEX<br />

PH-08 Mobile clinic for rural areas R 500,000.00 R 470,000.00<br />

ELM<br />

PH-26 Upgrade Biokinetic Clinic R 625,000.00<br />

OPEX<br />

PH-27 Renovate offices R 2,000,000.00<br />

ELM<br />

TOTAL R<br />

3,625,000.00<br />

SOCIAL DEVELOPMENT<br />

Building of an ECD facility, Day Care for older persons and HCBC<br />

for OVC. Bophelong, Stand 5050 Ext 10, (ASEDI Development<br />

SD-05<br />

Centre) - Professinal fees<br />

Construction of ECD facility, Day Care for older persons and HCBC<br />

R 500,000.00<br />

SOCIAL GRANT<br />

SD-08<br />

for OVC. Sharpeville, Stand 8910 R 3,000,000.00<br />

SOCIAL GRANT<br />

SD‐11 Boipatong Early childhood development center R 3,000,000.00<br />

SOCIAL GRANT<br />

TOTAL R<br />

6,500,000.00<br />

INFORMATION TECHNOLOGY<br />

IT-13 Computer hardware for new appointees R 1,650,000.00<br />

ELM<br />

IT-14 Development of GIS R 750,000.00<br />

ELM<br />

IT-16 Expansion to wide area network R 400,000.00<br />

ELM<br />

IT-17 New Server for PMU R 200,000.00<br />

ELM<br />

IT-18 Upgrade of Website & Internet R 1,000,000.00<br />

ELM<br />

FIRE AND RESCUE<br />

TOTAL R<br />

4,000,000.00<br />

126


F&R-05 Establishment of a proposed fire station in Sebokeng R 9,492,000.00<br />

MIG & ELM<br />

F&R-20 Grass Units for FPA equipments R 150,000.00<br />

ELM<br />

TRAFFIC DIVISION<br />

TOTAL R<br />

9,642,000.00<br />

TS-01 Install Security alarm systems R 500,000.00 R 1,358,102.00 R 1,426,007.00 ELM<br />

TS-02 CCTV Cameras R 500,000.00 R 2,516,205.00 R 2,642,015.00 ELM<br />

TS-03 Archive facility R 36,118.00 R 37,924.00 R 39,820.00 OPEX<br />

TS-11 Procurement of Office equipment and furniture R 250,000.00<br />

ELM<br />

TS-13 Procure 2-way radio R 200,000.00 R 360,865.00 R 378,908.00 ELM<br />

TS-21 & 12 Renovate upgrade offices control room and passages R 300,000.00 R 440,160.00 R 462,168.00 ELM<br />

MUNICIPAL COURT<br />

TOTAL R 1,786,118.00 R 4,713,256.00 R 4,948,918.00<br />

MC-18 Procure office equipment(Vereeniging Mun court) R 100,000.00<br />

R 400,000 ELM<br />

TOTAL R 100,000.00<br />

R 400,000<br />

SPORT, RECREATION, ARTS AND CULTURE<br />

SA-08 Upgrading of Multi Purpose Sports facility in Sebokeng Zone 3 R 5,000,000.00 R 2,000,000.00 R 2,000,000.00 NDG<br />

SA-11 Upgrading of Multi Purpose Sports facility in Sharpeville R 500,000.00 R 500,000.00<br />

ELM<br />

SA-13 Upgrading of Multi Purpose Sports facility in Zone 3 (phase 3) R 500,000.00 R 500,000.00 R 500,000.00 ELM<br />

SA-15 Upgrading of Dickenson park Picnic Resort R 3,000,000.00 R 39,488,000.00 R 24,793,000.00 MIG & ELM<br />

SA-17 Construction of ramps facilities for disabled persons R 550,000.00 R 550,000.00 R 100,000.00 MIG & ELM<br />

SA-21 Upgrading g g of Zone 13 Libraryy R 5,847,623.00<br />

, , R 63,675.00 , R 1,000,000.00<br />

, , MIG & ELM<br />

SA-39 Upgrading of libraries (Renovation) R 1,800,000.00<br />

Library GRANT<br />

SA-40 Procurement of furniture in the libraries R 700,000.00<br />

Library GRANT<br />

SA-41 Procurement of libraries vehicles R 960,000.00<br />

Library GRANT<br />

SA-42 Upgrading of zone 11 stadium R 527,000.00<br />

Sports GRANT<br />

FLEET MANAGEMENT<br />

TOTAL R 19,384,623.00 R 43,101,675.00 R 28,393,000.00<br />

FM-07 EIA Re-fuelling sites R 1,000,000.00<br />

OPEX<br />

FM-08 Upgrading Re-fuelling sites R 200,000.00<br />

OPEX<br />

FM-09 Upgrading Oil and Ghrease system R 500,000.00<br />

OPEX<br />

FM-10 New tyre bay R 500,000.00<br />

OPEX<br />

FM-11 Upgrading vehicle washbay R 300,000.00<br />

OPEX<br />

FM-12 Repair Bay for heavy duty vehicles R 3,500,000.00<br />

OPEX<br />

TOTAL R<br />

6,000,000.00<br />

ROADS AND STORWATER<br />

R&S-03 Stromwater canal in Zone 16 Sebokeng R 573,280.00<br />

MIG & ELM<br />

R&S-04 Stromwater canal in Zone 17 R 2,124,000.00 R 2,124,000.00 R 2,124,000.00 MIG & ELM<br />

R&S-05 Stromwater canal in Zone 10 R 1,770,000.00<br />

MIG & ELM<br />

R&S-38 Stormwater canal -Jet Nteo school R 93,062.00<br />

MIG<br />

R&S-07 Installation of stormwater pipe Zone11 R 206,960.00<br />

MIG & ELM<br />

R&S-08 installation of Stormwater Pipe in Mamelodi Street Boipatong R 1,109,490.00<br />

MIG & ELM<br />

R&S-10 Pipe installation Zone 12 Presbyterian Church R 421,014.00<br />

MIG & ELM<br />

R&S-11 Beverly Hills stormwater Master Plan:Beverly Hills draining system R 2,000,000.00 R 3,500,000.00 R 3,500,000.00 MIG & ELM<br />

R&S-12 Debonair Park Drainage System R 2,500,000.00 R 2,500,000.00 R 2,500,000.00 MIG & ELM<br />

127


R&S-13 Debonair park Stormwater Management Plan R 450,000.00 R 450,000.00 R 450,000.00 MIG & ELM<br />

R&S-15 Sharpville Stormwater reticulation Mareka Street R 917,100.00<br />

MIG & ELM<br />

R&S-19 Low points Stormwater formalisation Bophelong Extentions R 880,000.00 R 4,000,000.00 R 4,000,000.00 MIG & ELM<br />

R&S-21 Gamdor Road Side drains R 820,564.00<br />

MIG & ELM<br />

R&S-471 Suikerbos River embakment repair R 100,000.00<br />

ELM<br />

R&S-473 Construction of Roads and StormWater Zone 6 Sebokeng R 8,242,409.00<br />

MIG & ELM<br />

CONSTRUCTION <strong>OF</strong> TARRED ROADS<br />

R&S-24 Street 1- Zone 3 Sebokeng R 2,307,572.00<br />

MIG & ELM<br />

R&S-25 Mpande Sreet - Zone 7 Sebokeng R 1,877,500.00<br />

MIG & ELM<br />

R&S-26 Maboza (Street 5) - Zone 12 Sebokeng R 1,151,645.00<br />

MIG & ELM<br />

R&S-32 Lind Road in Evaton R 5,006,258.00<br />

MIG & ELM<br />

R&S-34 Lerothodi Street in Zone 13 Sebokeng R 2,000,000.00 R 4,100,000.00<br />

MIG & ELM<br />

R&S-36 Schoeman, Beethoven and Delius intersection upgrade R 1,100,000.00<br />

ELM<br />

R&S-475 Retarring of lake street (Lakeside) R 935,000.00<br />

ELM<br />

R&S-476 Retarring of Michigan street (Evaton North) R 1,575,000.00<br />

ELM<br />

R&S-477 Tarring of Sekhukhune street (Boipatong) R 2,250,000.00<br />

ELM<br />

STORMWATER CHANNELS<br />

R&S-60 Agricultural holding 63 in Arndenworld S/W drainage R 300,000.00<br />

R 1,392,000.00 ELM<br />

R&s-62 Formalisation of Moedyk street Channel R 1,100,000.00<br />

R1 500 00 R 400,000 ELM<br />

R&S‐71 Upgrading of stormwater channels in Sebokeng zone 13 R 925,000.00<br />

R 10,000,000.00 ELM<br />

GAUTRANS SIYAKHA (ROADS AROUND SCHOOLS)<br />

R&S‐78 Thomas Nkobi R 3,445,200.00<br />

ELM<br />

ADDITIONAL PROJECTS (Master Plan)<br />

R&S‐245 Kilprive/Assegai Corridor R 2,000,000.00<br />

R2 250 000 R 1,250,000 ELM<br />

R&S‐246 Gen Hertzog Corridor from Nile to Mariboe R 2,250,000.00 R 3,200,000.00<br />

R 1,000,000 ELM<br />

R&S‐247 Mantevrede Master Plan Roads and Stormwater Implementation R 750,000.00<br />

ELM<br />

R&S‐248 Gen Hertzog/Nile Intersection Upgrade R 1,175,000.00<br />

R 1,000,000 ELM<br />

R&S‐250 Bus and Taxi Lay by’s on Class 3 Arterials R 750,000.00 R 750,000.00<br />

ELM<br />

R&S‐469 Profesional Fees for Planning of outer year MIG projects R 1,561,849.00<br />

ELM<br />

R&S‐249 Traffic Lights at Major intersections R 1,500,000.00 ‐ ELM<br />

R&S‐470 Profesional Fees for Planning of outer year ELM projects R 1,653,151.00<br />

ELM<br />

Roads and stormwater projects (Flagship) R 60,000,000.00<br />

ELM<br />

TOTAL<br />

WATER AND SANITATION<br />

Repair, upgrade and maintenance of sewer system and WCW's<br />

R 117,821,054.00 R 21,624,000.00 R 26,616,000.00<br />

W&S-03<br />

(short term) in the whole of <strong>Emfuleni</strong> area R 19,500,000.00 R 20,000,000.00 R 20,000,000.00 MIG & ELM<br />

W&S-09 Water Service Development Plan in <strong>Emfuleni</strong> R 150,000.00 R 150,000.00 R 150,000.00 ELM<br />

W&S-12 Quaggastroom - water (R60m) and sewer (R40m)<br />

Investigate provision of sanitation in Malkgere, Masmith and<br />

R 10,785,910.00<br />

MIG & ELM<br />

W&S-19<br />

Ramusukula<br />

Water supply to Agricultural holdings Malkgere, Masmith and<br />

R 2,600,000.00 R 25,000,000.00 R 25,000,000.00 MIG<br />

W&S- 20<br />

Ramusukula R 3,202,326.00 R 5,000,000.00 R 5,000,000.00 MIG & ELM<br />

W&S-21 Water ingress into sanitation system<br />

Installation/replacement of water meters to unmetered stands in Sebokeng<br />

R 5,000,000.00 R 5,000,000.00 R 5,000,000.00 ELM<br />

W&S-23<br />

& Evaton R 10,000,000.00 R 10,000,000.00 R 10,000,000.00 ELM<br />

128


W&S-26 Vaaloewer Water Purification System R 900,000.00<br />

ELM<br />

W&S-27 Basic water supply R 650,000.00<br />

MIG & ELM<br />

W&S-28 Purchase of Metsi building R 3,950,000.00<br />

ELM<br />

Total R 56,738,236.00 R 91,724,000.00 R 94,016,000.00<br />

ELECTRICITY<br />

EY-01<br />

Reinstatement of Debonairpark/Ironsyde reticulation (Remaining<br />

areas)<br />

R<br />

300,000.00<br />

R 250,000.00 R 250,000.00 ELM<br />

EY-03 Upgrade of 11kV network in SW 5 and Mantevrede (Rural areas) R 1,700,000.00 R 1,000,000.00 R 1,000,000.00 ELM<br />

EY-08 Installation of bundle conductors (All Vereeniging Areas) R 3,000,000.00 R 3,000,000.00 R 2,000,000.00 ELM<br />

EY-14 Replace 3 x Air Breaks and 3 x Isolators in Town Substation R 500,000.00<br />

ELM<br />

EY-15 Replace Air Breaks in Verref Substation R 500,000.00<br />

ELM<br />

EY-21 Instruments for NRS 048 quality of supply system R 300,000.00 R 250,000.00 R 250,000.00 ELM<br />

EY-27 Upgrading of Electricity GIS system (ELM area) R 100,000.00 R 150,000.00 R 100,000.00 ELM<br />

EY-29 Replace 88kV cable with line (DS to Dun) R 3,500,000.00<br />

ELM<br />

EY-32 Upgrade 88KV Protection (ELM) area R 900,000.00 R 1,000,000.00<br />

ELM<br />

EY-36 Upgrading of 88kV Three Rivers main substation R 6,000,000.00<br />

ELM<br />

EY-38 Firm supply to Arconpark (2x120mm²) R 3,000,000.00<br />

ELM<br />

EY-41 Sebokeng Extension 24 Public Lighting R 625,000.00<br />

ELM<br />

EY-45 Tshepong (Vlakfontein) Planning fees R 500,000.00<br />

ELM<br />

EY-57 Boipatong High masts R 2,258,000.00<br />

R 1,500,000 MIG & ELM<br />

EY-64 Evaton West High Masts R 625,000.00<br />

ELM<br />

EY-66 Sharpeville High masts R 500,000.00<br />

MIG & ELM<br />

EY EY-72 72 Maintenance M i t of f traffic t ffi light li ht infrastructure i f t t R 700 700,000.00 000 00<br />

R 800 800,000.00 000 00 ELM<br />

EY-78 New connections & unforeseen network improvement R 3,000,000.00 R 3,630,000.00 R 3,630,000.00 ELM<br />

EY-80 Verg DS 20 MVA trf R 7,500,000.00<br />

ELM<br />

EY-81 Alarm System cable yards and batteries R 300,000.00<br />

ELM<br />

EY-82 Extension of Office building and carpots R 1,700,000.00<br />

ELM<br />

EY-83 Replacement of Streetlight fittigs R 400,000.00 R 825,000.00 R 907,500.00 ELM<br />

EY-87 Vaaloewer NetworkStrngthening R 300,000.00<br />

R 1,000,000.00 ELM<br />

EY-88<br />

Powerville Substation(ESC 6) Install Extra 15MVA 88/22KV<br />

Transformer Consulting Fees.<br />

R<br />

500,000.00<br />

R 1,000,000.00 ELM<br />

EY-89<br />

Powerville Substation(ESC 6) Install Extra 15MVA 22/11KV<br />

Transformer Consulting Fees.<br />

R<br />

500,000.00<br />

R 6,000,000.00 ELM<br />

EY-90<br />

Reinforced Enclosures for High Tech prepaid Meters in<br />

Bedworthpark and Rustervaal<br />

R<br />

2,000,000.00<br />

ELM<br />

EY-91 Install load control Unit in Munic Substation(Consulting Fees) R 300,000.00<br />

ELM<br />

EY-92<br />

Replace 16mm² 11KV Cable between Col Gorden Sub and<br />

Cornwallis harris Street<br />

R<br />

600,000.00<br />

ELM<br />

EY-93 Replace Switchgear in Saspark Motors Sub VanderbijlPark R 500,000.00<br />

ELM<br />

EY-94 Replace low Voltage SwitchGear in Town Sub Vanderbijlpark R 150,000.00<br />

ELM<br />

EY-95 Replacement of Distribution Pillars R 250,000.00<br />

R 1,500,000.00 ELM<br />

EY-96<br />

Replacement of MinisubsTransformers - Bophelong and Iron side R<br />

1,350,000.00<br />

R 6,000,000.00 ELM<br />

EY-97<br />

Replacemnt of 88KV Current Transformers in various 88 KV<br />

Substations<br />

R<br />

1,500,000.00<br />

ELM<br />

EY-102 procure test equipments R 900,000.00<br />

ELM<br />

TOTAL R 46,758,000.00 R 11,605,000.00 R 24,437,500.00<br />

WASTE MANAGEMENT<br />

129


WM-03 Operate to Closure & rehabilitate Boitshepi Landfill site R 13,000,000.00 R 14,000,000.00 R 10,000,000.00 MIG & ELM<br />

WM-04 Development of Palm Springs Landfill site R 455,000.00 R 350,000.00 R 943,675.00 MIG & ELM<br />

WM-05 Investigate and develop new general waste landfill site<br />

Obtain operating permit and rehabilitate phase 1,2 and 3 Waldrift<br />

R 650,000.00 R 8,000,000.00 R 5,000,000.00 MIG & ELM<br />

WM-06/07<br />

landfill site R 5,200,000.00 R 3,500,000.00 R 3,500,000.00 MIG & ELM<br />

WM-09 Licence and Upgrading of existing mini-dump/transfer stations R 260,000.00 R 3,670,000.00 R 3,000,000.00 MIG & ELM<br />

TOTAL R 19,565,000.00 R 29,520,000.00 R 22,443,675.00<br />

ALLOCATION PER DEPARTMENT 09/10 FUNDS<br />

Mayor's office R<br />

3,700,000.00<br />

Speakers office R<br />

5,000,000.00<br />

Communication R<br />

750,000.00<br />

Finance (furniture) R<br />

1,500,000.00<br />

Corporate Services R<br />

4,000,000.00<br />

IDP R<br />

70,000.00<br />

PMU R<br />

1,300,000.00<br />

Housing R<br />

25,034,000.00<br />

Facilities R<br />

2,500,000.00<br />

Land use management R<br />

544,752.00<br />

Property R<br />

37,000.00<br />

LED R<br />

5,781,296.00<br />

Tourism R<br />

570,000.00<br />

Cemeteries R<br />

7,000,000.00<br />

Parks R<br />

4,000,000.00<br />

Organisational Development R<br />

600,000.00<br />

Human Resource R<br />

1,400,000.00<br />

Legal R<br />

500,000.00<br />

Environmental Health R<br />

1,545,706.00<br />

Primary Health R<br />

3,625,000.00<br />

social development R<br />

6,500,000.00<br />

Information technology R<br />

4,000,000.00<br />

Fire and Rescure R<br />

9,642,000.00<br />

Traffic Division R<br />

1,786,118.00<br />

Municipal Court R<br />

100,000.00<br />

SRAC R<br />

19,384,623.00<br />

Fleet Management R<br />

6,000,000.00<br />

Roads and stormwater R 117,821,054.00<br />

Water and Sanitations R<br />

56,738,236.00<br />

Eletricity R<br />

46,758,000.00<br />

Waste Management R<br />

19,565,000.00<br />

MM Cluster ‐ Minor capital items (furniture & equipment) R<br />

2,550,000.00<br />

Ward based projects (rollover) R<br />

40,000,000.00<br />

TOTAL R 400,302,785.00<br />

130


ACRONYM<br />

CAPEX CAPITAL EXPENDITURE<br />

ELM EMFULENI LOCAL MUNICIPALITY<br />

HEALTH GRANT DEPARTMENT <strong>OF</strong> HEALTH GRANT<br />

MIG MUNICIPAL INFRASTURE GRANT<br />

NDG NEIGHBOURHOOD DEVELOPMENT GRANT<br />

OPEX OPERATIONAL EXPENDITURE<br />

SOCIAL GRANT DEPARTMENT <strong>OF</strong> SOCIAL GRANT<br />

131


ROADS & STORMWATER FLAGSHIP PROJECTS (R60 million)<br />

Suburb Street From To Width Length Area(m²) Tariff® Cost Cumulative Comments<br />

Bophelong Bokwe Mathews Dube 5.5 800 4400 550 R 2,420,000.00 R 2,420,000.00<br />

Bophelong Mqhayi Bokwe Dube 5.5 330 1815 550 R 998,250.00 R 3,418,250.00<br />

Bophelong Thema Mosaka Mathews 5.5 370 2035 550 R 1,119,250.00 R 4,537,500.00<br />

Bophelong Vilikazi Mathews Mohayi 5.5 770 4235 750 R 3,176,250.00 R 7,713,750.00 This road takes and links with various stormwater systems.<br />

Bophelong Mosaka Plaatje Thema 5.5 160 880 704 R 619,520.00 R 8,333,270.00 Includes kerbing and s/w for rest of Mosaka.<br />

Boipatong Malebogo Dr Nkomo Leshoboro 5 660 3300 550 R 1,815,000.00 R 10,148,270.00<br />

Boipatong Moshoeshoe Thembu Tar Begin 5.5 100 550 1172 R 644,600.00 R 10,792,870.00 Includes kerbing and s/w for rest of Moeshsoeshoe.<br />

Boipatong Thembu Amatola Moshoshoe 5.5 560 3080 550 R 1,694,000.00 R 12,486,870.00<br />

Sharpville Nkomo Mbata Raporoko Ext 5.5 920 5060 550 R 2,783,000.00 R 15,269,870.00<br />

Sharpville Sanuku Oliphant Dubula 5.5 350 1925 550 R 1,058,750.00 R 16,328,620.00<br />

Sharpville Hulwana Already tarrred. No kerbing and stormwater<br />

R 16,328,620.00<br />

Sharpville Mbatha Khabashane Hulwana 5.5 665 3657.5 550 R 2,011,625.00 R 18,340,245.00<br />

Sebokeng Rathebe Phuthatswana Hlalefang 5.5 760 4180 550 R 2,299,000.00 R 20,639,245.00<br />

Sebokeng Mohale Lerothodi Bonatla 5.5 660 3630 550 R 1,996,500.00 R 22,635,745.00<br />

Sebokeng Mampoi Motebang Mabele 5.5 870 4785 550 R 2,631,750.00 R 25,267,495.00<br />

Sebokeng Road 23 Bonatla Road 8 5.5 460 2530 550 R 1,391,500.00 R 26,658,995.00<br />

Sebokeng Road F Road B Road I 5.5 530 2915 550 R 1,603,250.00 R 28,262,245.00<br />

Sebokeng Road A Road 5 Road 7 5.5 500 2750 550 R 1,512,500.00 R 29,774,745.00<br />

Evaton Kent Lombard Mbatha West 6 360 2160 550 R 1,188,000.00 R 30,962,745.00<br />

Sebkng x15 Main rd K11 Main rd 6.2 1580 9796 550 R 5,387,800.00 R 36,350,545.00<br />

SE.10 Suncrest Road Hendrik v Eck End of Road 6 330 1980 550 R 1,089,000.00 R 37,439,545.00<br />

Palm Springs Hawk Eagle Road Eagle Road 5.5 800 4400 550 R 2,420,000.00 R 39,859,545.00<br />

Sebokeng Ladzidze Mopeli Sebe 5.5 420 2310 550 R 1,270,500.00 R 41,130,045.00<br />

Sebokeng Maqoma Mopeli Sebe 5.5 420 2310 550 R 1,270,500.00 R 42,400,545.00<br />

Boipatong Dr Nkomo Leshoboro Tar Begin 5.5 660 3300 550 R 1,815,000.00 R 44,215,545.00<br />

Boipatong Mamelodi Tar Begin Dr Nkomo 5.5 160 880 704 R 619,520.00 R 44,835,065.00<br />

Rust Ter Vaal Madeliefie Seder Pansy 5.5 360 1980 550 R 1,089,000.00 R 45,924,065.00<br />

Rust Ter Vaal Krisant<br />

Krisant Ext<br />

Narcissus Sonneblom 5.5 150 825 550 R 453,750.00 R 46,377,815.00<br />

Rust Ter Vaal (Sonneblom) Krisant Tulip 5.5 500 2750 550 R 1,512,500.00 R 47,890,315.00<br />

Sebokeng Rathebe Hlalefang Lekupe 5.5 350 1925 550 R 1,058,750.00 R 48,949,065.00<br />

Evaton West 8054 Erf 8370 Erf 8384 5.5 900 4950 550 R 2,722,500.00 R 51,671,565.00<br />

Evaton West 4380 Erf 4969 Erf 4986 5.5 600 3300 550 R 1,815,000.00 R 53,486,565.00<br />

Evaton West 4711 Erf 4690 Erf 4735 5.5 640 3520 550 R 1,936,000.00 R 55,422,565.00<br />

Ironsyde Springbok rd Evaton rd Werpner rd 6.2 592 3671 550 R 2,019,050.00 R 57,441,615.00<br />

Eatonside Cinderella Eric Knox 5.5 416 2288 550 R 1,258,400.00 R 58,700,015.00<br />

Tshepiso K55 3 150 450 8.9 R 300,000.00 R 59,000,015.00<br />

132


Sharpeville<br />

Road SV99<br />

(Memorial Ext ) Seeiso Mareka 6 285 1710 550 R 940,500.00 R 59,940,515.00<br />

Total Lentgh 14118 R 59,940,515.00<br />

133


14.1.2 IDP UNFUNDED PROJECTS FOR 2009/10<br />

CODE PROJECT NAME 2009/2010 2010/2011 2011/2012 SOURCE <strong>OF</strong> FUNDING<br />

HOUSING<br />

HO-01 Eradicate all Informal Settlements R 607,489.00<br />

Dept of Housing<br />

HO-13 Evaton Renewal R 80,152,000.00<br />

Dept of Housing<br />

HO-15 Provision of services: Beverly Hills<br />

HO-16 Tshepong Proper Phase 2 Extension 1<br />

HO-19 Transfer of Rental Stock<br />

HO-20 Rehabilitation of 20 Prioiritised Townships Projects (PTP)<br />

HO-21 Identify Land for new townships/squatters<br />

HO-23 Establish accredited office for BNG Plans<br />

HO-24 Computerization of rental stock system<br />

R 80,152,000.00<br />

FACILITIES DEPARTMENT<br />

FC-03 Erect/build signage for <strong>Emfuleni</strong> Head Office<br />

FC-07 Standardised <strong>Emfuleni</strong> signage on all council office blocks R 125,000.00<br />

UNFUNDED<br />

FC-08 Furniture for Facilities Management Offices<br />

FC-09 Upgrade empty storage facility into store room<br />

FC-14 Provide access to Council building for differently abled pesons<br />

FC-16 Replace roof – Duncanville office block<br />

FC-17 Replacement of fences<br />

FC-18 Replacement of geysers<br />

FC-20 Purchase steel lockers<br />

FC-21 Renovation of Kwa-Masiza Hostel<br />

FC-23 Upgrade Maintenance Workshop and offices (Phase 2 )<br />

FC-24 Build/ Convert Archive Storage in Sebokeng Zone 10 offices R 1,000,000.00<br />

UNFUNDED<br />

TOTAL R 1,125,000.00<br />

LAND USE MANAGEMENT<br />

U-05 Illegal Land Use audit R 140,171.00<br />

UNFUNDED<br />

TOTAL<br />

LOCAL ECONOMIC DEVELOPMENT<br />

R 140,171.00 R<br />

-<br />

LE-03 Vanderbijlpark CBD renewal R 2,500,000.00 R 7,700,000.00<br />

LE-04 Vereeniging Urban renewal Tax incentive R 100,000.00<br />

LE-05 Development and implementation of a LED Strategy R 1,000,000.00 R 400,000.00 Unfunded<br />

LE-10 Development of informal trading areas in <strong>Emfuleni</strong> R 2,500,000.00 R 10,000,000.00 Unfunded<br />

LE-15 Finalising and implementing an advertising Policy R 250,000.00<br />

Unfunded<br />

LE-16 Development of an economic hub in Boipatong R 1,210,324.00<br />

Unfunded<br />

LE-17 Development of an economic hub in Sebokeng R 1,210,324.00<br />

Unfunded<br />

LE-18 Development of an economic hub in Sharpeville R 1,210,324.00<br />

Unfunded<br />

LE-19 Economic hub in Bophelong R 1,210,324.00<br />

Unfunded<br />

TOTAL R 11,091,296.00 R 18,200,000.00<br />

TOURISM AND MARKERTING<br />

TM-04 Finalization of Video and multi media CD R 150,000.00 R 350,000.00 Unfunded<br />

TM-06 Establishment of Partnerships and linkages R 80,000.00 R 250,000.00 Unfunded<br />

TM-07 Development and maintenance of tourism database R 80,000.00 R 250,000.00 Unfunded<br />

TM-08 Development of printed marketing material R 400,000.00 Unfunded<br />

TM-09 Increase bed nights and number of visitors through marketing campaigns R 80,000.00 R 320,000.00 Unfunded<br />

TM-10 Development of informal trading areas R 2,500,000 R 500,000.00 Unfunded<br />

TM-11 Accreditation, registration and quality assurance program R 80,000.00 R 260,000.00 Unfunded<br />

TOTAL R 2,970,000.00 R 2,330,000.00<br />

134


CEMETRIES<br />

CS-01 Establish interim burial space in Pelindaba, Sharpeville R 5,050,000.00<br />

Unfunded<br />

CS-04 Operation of Closed Cemetries Unfunded<br />

CS-05 Operation of Combined existing and closed cemetries R 11,731,001.00 Unfunded<br />

R 5,050,000.00 R 11,731,001.00<br />

ORGANISATIONAL DEVELOPMENT<br />

OD-03<br />

OD-04<br />

Principal Job Evaluation PJEC<br />

OD-05 Install fire protection (phase 1) R 2,100,000.00<br />

UNFUNDED<br />

OD-06<br />

HUMAN RESOURCES<br />

Develop change management strategy R 4,000,000.00<br />

R 6,100,000.00<br />

UNFUNDED<br />

HR-07 Develop comprehensive workplace skills plan R 10,576.40<br />

UNFUNDED<br />

HR-08 Review relationship by objective (RBO) R 54,288.20<br />

UNFUNDED<br />

HR-10 Establish management development programme R 130,291.70<br />

UNFUNDED<br />

HR-17<br />

CORPORATE SERVICE<br />

Extension of existing training Centre Duncanville<br />

R<br />

195,156.30<br />

CO-03 Upgrading of PABX in the Main building (switchboard)<br />

CO-05 Upgrading of the foyer (Main Building)<br />

CO-06 Purchase furniture and equipment for reception desk (Main Building) R 70,000.00<br />

CAPEX<br />

CO-10 Renovating Community halls: Roshnee and Rus-ter-vaal<br />

CO-12 Purchase of computers and software for Corporate Service (Main R 100,000.00<br />

CAPEX<br />

CO-13 Replace Freezer in two community halls, Roshnee and Rus-ter-vaal Insurance to fund<br />

CO-16<br />

ENVIROMENTAL HEALTH<br />

Replace/ Buy furniture in Sebokeng Zone 10<br />

R 170,000.00<br />

EN-06 Development of Public Health By-laws<br />

Appoint consultants to develop an Integrated Environmental Management<br />

R 150,000.00 R 150,750.00 Unfunded<br />

EN-16<br />

Plan<br />

EN-18 Environmental Management Framework R 600,000.00 RG<br />

EN-19 Development of air quality management plan<br />

PRIMARY HEALTH<br />

R 750,000.00 R 150,750.00<br />

PH-01 Build 3 new clinics in Bophelong Extension, Evaton West, and Zone 14.<br />

PH-02<br />

PH-04<br />

Upgrade 5 clinics (Rust-ter-Vaal, Bophelong, Tshepiso, Sebokeng zone<br />

12, and Beverly Hills) to meet the needs of the community R 2,000,000.00 R 2,451,073.00 PROVINCE<br />

Training of staff in the following areas: computer skills, Financial<br />

management and report writing R 26,900.00 R 28,785.00 OPEX<br />

PH-05 Training of ward health sub-committees R 15,000.00<br />

OPEX<br />

PH-07 Procurement of medical equipment PROVINCE<br />

PH-09 Wide area network for all clinics R 200,000.00 R 250,000.00 PROVINCE<br />

PH-10 Rehabilitation of Sebokeng/Houtkop building (Phase 2 &3) R 2,000,000.00 R 1,200,000.00 Unfunded<br />

PH-11 Kopanong Pharmacy 20PTP<br />

PH-12 Provision of engineering services - Sebokeng Hospital 20PTP<br />

135


PH-13 Upgrading of Sebokeng hospital DPRTW 20PTP<br />

PH-14 Upgrading of Ward 23 in Sebokeng Hospital DPRTW 20PTP<br />

PH-15 Upgrade lifts with maintenance contracts – Kopanong Hospital DPRTW 20PTP<br />

PH-16 New Generator and Refurbishment of Existing Generator - DPRTW 20PTP<br />

PH-17 Sebokeng Hospital<br />

PH-18 Sebokeng Master Plan DPRTW 20PTP<br />

PH-19 Automate Boilers and Provide y Facilities to Integrate g p with BMS g-Sebokeng<br />

Integrate with System in New Hospital Complex (included 2020/040) -<br />

DPRTW 20PTP<br />

PH-20<br />

Sebokemg<br />

Upgrade the Electrical MV and LV and Reticulation & UPS (included<br />

DPRTW 20PTP<br />

PH-21<br />

2020/040) – Sebokeng DPRTW 20PTP<br />

PH-22 Bophelong Clinic<br />

PH-23 Bophelong Extension (construction of a new structure)<br />

PH-24 Boitumelo (replace container with brick structure)<br />

PH-25 Zone 17 (replace container with brick structure)<br />

SOCIAL DEVELOPMENT<br />

SD-02 Appoint consultants to develop a Social Development Master Plan for ELM<br />

Erection of an ECD facility, Day Care for older persons and HCBC for<br />

SD-04<br />

OVC<br />

R 4,241,900.00 R 3,929,858.00<br />

SD-06<br />

Construction of an ECD facility and Day Care Centre for Elderly.<br />

Sebokeng, Stand 70 Zone 10 Ext 3<br />

Upgrading of existing Old Age Home. Sebokeng, Stand 23204 Zone 13<br />

SD-07<br />

(Age in Action Old Age Home)<br />

SD-09 Social Development Framework R 500,000.00 Unfunded<br />

SD-10<br />

EDUCATION<br />

Social Development Grant R 500,000.00<br />

SD-09 Building of Johandeo Primary School in Polokong<br />

SD-10<br />

INFORMATION<br />

Building of Secondary School in Bophelong<br />

TECHNOLOGY ,<br />

IT-10 Implement E-Venus system<br />

IT-18 Replacement of GIS server<br />

IT-19 Expansion to local area network<br />

FIRE AND RESCUE SERVICE<br />

Provincial Health department<br />

and Sedibeng health District<br />

Sedibeng District health<br />

Services.<br />

F&R-01 Procurement of fire equipment R 439,320.00 R 483,153.00 UNFUNDED<br />

F&R-02 Procurement of fire engines (F.M.L.) R 5,856,000.00 R 6,441,600.00 UNFUNDED<br />

F&R-03 Procurement of two way radios R 146,000.00 R 161,600.00 UNFUNDED<br />

F&R-04 Procurement of training aids Personnel community R 106,000.00 R 116,000.00 UNFUNDED<br />

Provincial Health department<br />

and Sedibeng health District<br />

136


F&R-06 Procurement of fire hydrants R 700,000.00 R 700,000.00 UNFUNDED<br />

F&R-07 Maintenance of Fire Brigade Buildings(Special project) R 600,000.00 R 600,000.00 UNFUNDED<br />

F&R-08 Specialized additional equipment for water rescue<br />

F&R-09 Fire Protection Association/Fire Protection officer R 133,100.00 R 146,410.00 UNFUNDED<br />

F&R-10 Security or security system R 300,136.00 R 318,144.00 UNFUNDED<br />

F&R-12 Replace Vanderbijlpark fire station doors and link with control room<br />

F&R-14 Maintenance of Fire Brigade buildings R 820,228.00<br />

UNFUNDED<br />

F&R-15 Upgrade admin systems, equipment and furniture<br />

F&R-16 Established Fire Protection Association `<br />

F&R-17 Two Wet bikes with trailers<br />

F&R-18 Establishment of new fire station<br />

F&R-19 Swimming pool<br />

R 9,100,784.00 R 8,966,907.00<br />

TRAFFIC DIVISION<br />

TS-05<br />

Installation of Parking meters to Paul Sauer Square, Stephen le Roux<br />

Square and Van Rhijn Square<br />

TS-06 Procurement of Alcohol Screeners<br />

TS-07 Procurement of Speed Measuring Equipment R 481,641.00 R 505,723.00 UNFUNDED<br />

TS-08 Procurement of Bullet prove vests<br />

TS-09 Procurement of Traffic Volume Counters R 430,469.00 R 451,992.00 UNFUNDED<br />

TS-10 Procurement of Telephone system<br />

TS-14 Procure air cons R 650,000.00<br />

Unfunded<br />

TS-15 Procure fire arms R 237,100.00<br />

Unfunded<br />

TS-16 Procure low speed weighbridge/scanner R 141,461.00<br />

Unfunded<br />

TS-17 Procure training aids R 34,949.00<br />

Unfunded<br />

TS-18 Upgrade UPS/Generator R 210,000.00<br />

Unfunded<br />

TS-19 Electronic control room management system R 210,000.00<br />

Unfunded<br />

MUNICIPAL COURT<br />

R 2,395,620.00 R 957,715.00<br />

MC-01 Upgrading of the Municipal Court building in Vanderbijlpark R 1,030,387.00 UNFUNDED<br />

MC-02 Establishment of the new Municipal Court in Vereeniging R 3,000,000.00 R 1,102,500.00 ELM<br />

MC-03 Establishment of the new Municipal Court building in Sebokeng / Evaton R 2,205,000.00 UNFUNDED<br />

MC-04 Installation of emergency power plant in Vanderbijlpark R 550,000.00 R 1,215,506.00 ELM<br />

MC-05 Installation of UPS for computer network in Vanderbijlpark R 173,644.00 R 182,326.00 UNFUNDED<br />

MC-06 Procure office equipment & furniture R 173,644.00 R 182,326.00 UNFUNDED<br />

MC-07 Upgrade archive facilities in Vanderbijlpark Municipal<br />

Procurement of equipment for speed camera, film development, scanning<br />

MC-08<br />

& capturing in Vanderbijlpark<br />

Procure/lease equipment needed for the processing of traffic fines and<br />

MC-09<br />

other cases in Vanderbijlpark R 626,276.00 R 657,590.00 UNFUNDED<br />

MC-10 Upgrading of computer systems in Vanderbijlpark<br />

Appointment of consultants to assist with (Phase 2) Vereeniging Municipal<br />

R 275,000.00<br />

UNFUNDED<br />

MC-11<br />

Court R 115,763.00 R 121,551.00 UNFUNDED<br />

MC-12 Procurement / rental of fax / copier for Court building in Vanderbijlpark R 41,675.00<br />

UNFUNDED<br />

MC-13 Upgrading of loading area for prisoners in Vanderbijlpark<br />

MC-14 Upgrade existing concrete fence in Vanderbijlpark<br />

Provide Security Services at Municipal Court Building in Vanderbijlpark<br />

MC-15<br />

and Vereeneging R 320,000.00 R 139,783.00 UNFUNDED<br />

MC-16 Procure recording equpment<br />

MC-17 Install Carports<br />

MC-19 Procure computer equipment R 275,000 UNFUNDED<br />

MC-20 Install CCTV Cameras at pay point<br />

137


MC-21 Install network V'ging court<br />

R 5,551,002.00 R 6,836,969.00<br />

SPORT,RECREATION,ARTS AND CULTURE(SRAC)<br />

SA-01 Construction of Multi purpose Centre in Palm Springs (New) R 2,000,000.00 R 2,000,000.00 UNFUNDED<br />

SA-02 Construction of Multi Purpose Centre in Sebokeng (New) R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-03 Construction of Multi Purpose Sports facility in Polokong (New) R 2,000,000.00 R 2,000,000.00 UNFUNDED<br />

SA-04 construction of Multi purpose sports Facility in Bedworthpark (New) R 3,000,000.00 R 3,000,000.00 UNFUNDED<br />

SA-05 Construction of multi Purpose Sports Facility in Unitas Park (New) R 9,000,000.00 R 4,000,000.00 UNFUNDED<br />

SA-06 Construction of multi Purpose Sports Facility in Beverly Hills (New) R 4,000,000.00 R 3,000,000.00 UNFUNDED<br />

SA-07 Construction of multi Purpose Sports Facility in Boitumelo (New) R 2,000,000.00 R 2,000,000.00 UNFUNDED<br />

SA-09 Upgrading of Multi Purpose Sports facility in Sebokeng Zone 13 (New) R 2,000,000.00 R 2,000,000.00 UNFUNDED<br />

SA-10 Construction of multi Purpose Sports Facility in Tshepiso (New) R 500,000.00<br />

UNFUNDED<br />

SA-12 Upgrading of Multi Purpose Sports facility in Palm Springs R 500,000.00 R 500,000.00 UNFUNDED<br />

SA-14 Upgrading of Netball Courts in SW1 R 10,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-16 Renovation of Sharpeville Arts Centre R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-18 Construction of Community Library at Boipatong (New) R 3,500,000.00 R 3,500,000.00 UNFUNDED<br />

SA-19 Construction of Community Library at Boitumelo (New) R 3,500,000.00 R 1,000,000.00 UNFUNDED<br />

SA-20 Construction of Community Library at Eatonside (New)<br />

Procurement of Information Communication Technology at Tshepiso<br />

R 7,000,000.00 R 3,000,000.00 UNFUNDED<br />

SA-22<br />

Library<br />

Procurement of Information Communication Technology at Zone 13<br />

R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-24<br />

library. R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-25 Sharpeville Multi-purpose Centre R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-26 Sebokeng Heritage Site<br />

SA-27 Boipatong Heritage Site<br />

SA-28 Procurement of equipments for sport failities<br />

SA-29 Heritage Site in Sharpville<br />

SA-30 Heritage Site in Bophelong<br />

Conversion of Eldarado Cinema in Zone 14 into an Arts and Culture<br />

SA-31<br />

Centre R 1,000,000.00 R 1,000,000.00 UNFUNDED<br />

SA-32 Purchasing of Library Materials R 2,371,596.00<br />

UNFUNDED<br />

SA-33 Conduct reading campaigns and reading awareness programmes R 1,244,560.00 R 1,000,000.00 UNFUNDED<br />

SA-34 Celebrate significant national and international days<br />

Promote performing Arts,for example,drama ,dance ,choral music and<br />

promote national Symbols at Council Buildings,Libraries, Foyers and<br />

R 944,522.00 R 1,000,000.00 UNFUNDED<br />

SA-35<br />

relevant areas. R 500,000.00 R 1,000,000.00 UNFUNDED<br />

SA-36 Upgrade six swimmingpools in ELM R 1,500,000.00 R 1,500,000.00 ELM<br />

SA-37 Upgrade muitipurpose sports facility in CW 6 R 3,000,000.00 R 1,500,000.00 ELM<br />

SA--38 Procure equipment for sports facilities R 500,000.00 R 500,000.00 UNFUNDED<br />

FLEET MANAGEMENT<br />

R 65,060,678.00 R 39,500,000.00<br />

FM-01<br />

Completion of the vehicle replacement program to get the fleet within<br />

GAMAP guidelines. R 47,500,000.00 R 52,000,000.00 UNFUNDED<br />

FM-02 Installation of Electronic Fleet Management Control Systems. R 2,800,000.00 R 1,200,000.00 UNFUNDED<br />

FM-03 Implementation of a 24/7 Risk Control Room. R 2,500,000.00 R 2,900,000.00 UNFUNDED<br />

FM-04 Upgrading of the Mechanical Workshop Duncanville. UNFUNDED<br />

FM-05 Repair and maintenance of vehicles and equipment UNFUNDED<br />

FM-06 Implementation of a Safety Program R 70,000.00 R 75,000.00 OPEX<br />

FINANCE<br />

R 52,870,000.00 R 56,175,000.00<br />

FI-01 Water and lights,Meter reading and revenue enhancement R 1,000,000.00<br />

OPEX<br />

FI-02 Rates and taxes-implementation of property rates R 3,000,000.00<br />

OPEX<br />

FI-03 Creditors-Software<br />

138


FI-04 Financial control-IT software for assets R 750,000.00<br />

OPEX<br />

PUBLIC WORKS<br />

PW-01 Building of Council Chamber and Municipal Office<br />

ROADS AND STORMWATER<br />

R&S-07 Installation of Stormwater Pipe in Sebokeng Zone 11(No14407)<br />

R&S-09 Stormwater Bophelong Extension 11&12 R 1,700,000.00<br />

MIG<br />

R&S-14 Bophelong Extension 17 Stromwater<br />

R&S-16 Sullivan Street Stormwater and Stand 1279<br />

R&S-17 Repair damaged embakment in Suikerbos Rivier<br />

R&S-18 Schoeman street Stromwater System<br />

R&S- 20 Stormwater channel in Vaalview over Ptn 8/854 R 750,000.00<br />

ELM<br />

R&S-22 West External Stormwater line channel (Bophelong)<br />

R&S-23 Stormwater canal over Ptns of Vaalview & Kaalplaats 577 IQ R 950,000.00<br />

ELM<br />

CONSTRUCTION <strong>OF</strong> TARRED ROADS<br />

R&S-27 Street 7 in Zone 16 R 3,043,000.00 R 3,043,000.00 ELM<br />

R&S-30 Mamelodi Street in Boipatong R 2,495,000.00 R 2,485,000.00 MIG<br />

R&S-31 Ring Road in Zone 3 (phase 2) MIG<br />

R&S-33 Moshoeshoe Road in Boipatong<br />

R&S-39 Frikkie Meyer, Verdi and Macowan Street Intersection<br />

R&S-41 Upgrading of Gravel Roads R 3,000,000.00 R 3,000,000.00 ELM<br />

R&S-45 Second Avenue (Stefanopark)<br />

R&S-46 Friedman & Halley Road & Mantevrede<br />

R&S-47 Mississipi Road Sebokeng Extension 15 R 1,937,500.00<br />

UNFUNDED<br />

R&S-48 Milner Road Evaton, Small Farms R 2,625,000.00<br />

UNFUNDED<br />

R&S-49 Road 20B Zone 7 Extension 1 R 662,500.00<br />

ELM<br />

R&S-50 Road 20A Zone 7Extension 1 R 575,000.00<br />

ELM<br />

R&S-51 Road 20 zone 6 Extension 1 R 1,812,500.00 UNFUNDED<br />

R&S-52 Residensia Road Zone 6 Extension 4 R 412,500.00 UNFUNDED<br />

R&S-53 St Andrews road Debonairpark R 1,812,500.00 UNFUNDED<br />

R&S-54 St Peter Road R 812,500.00 UNFUNDED<br />

R&S-55 Vereeniging Road Ironsyde R 562,500.00 UNFUNDED<br />

RESEALING <strong>OF</strong> TARRED ROADS<br />

R&S-57 Annual maintenance of tarred roads R 10,600,000.00 R 35,000,000.00 ELM<br />

R&S-58 Impact Reseal of all Roads R 10,578,649.00<br />

ELM<br />

R&S-59 Rehabilitation & Reconstruction R 18,962,584.00 R 22,150,864.00 ELM<br />

STORMWATER CHANNELS<br />

R&s-61 CW6 Channel Tennyson & Eugene Marais R 1,250,000.00 R 2,500,000.00 ELM<br />

R&S-63 Zone 6 Extension 3 Roads & stormwater system<br />

R&S-64 Evaton West Extensions 4 &7 Roads and stormater system R 825,000.00 R 825,000.00 MIG<br />

R&S-65 Upgrade Tshepong stormwater system R 275,000.00 R 275,000.00 MIG<br />

R&S-66 Dube Street stormwater R 2,500,000.00 UNFUNDED<br />

R&S-67 Upgrading of stormwater channels in Sharpeville R 5,000,000.00 R 6,000,000.00 MIG & ELM<br />

R&S-68 Upgrading of stormwater channels in Boipatong<br />

R&S-69 Upgrading of stormwater channels in Tshepiso R 500,000.00 R 500,000.00 MIG<br />

R&S-70 Upgrading of stormwater channels in Bophelong R 500,000.00 MIG & ELM<br />

R&S-72 Piping of channel-Poto to Sekati Streets, Boipatong R 2,500,000.00 R 2,500,000.00 MIG<br />

R&S-73 Stormwater system in 2nd Avenue, Stephanopark R 6,000,000.00 ELM<br />

R&S-74 JW Grosspkop Street stormwater upgrade R 750,000.00 R 750,000,000.00 MIG<br />

139


GAUTRANS SIYAKHA (ROADS AROUND SCHOOLS)<br />

R&S-75 Albert Luthuli R 1,566,000.00 R 1,566,000.00 MIG<br />

R&S-77 Dan Mofokeng R 870,000.00<br />

GT, MIG & ELM<br />

R&S-79 Construction of tarred road in Mohayi Street, Bophelong Proper R 522,000.00 R 522,000.00 MIG<br />

R&S-80 Construction of tarred road in Harry Gwala Street, Bophelong Extension 6 R 1,392,000.00<br />

MIG<br />

R&S-81 Sebokeng Zone 6 Extension 3 Road 1 R 1,955,000.00 R 1,955,000.00 MIG<br />

R&S-83 Paving along Dr Nkomo and Lekoa Streets R 880,000.00 ELM<br />

R&S-84 Traffic Calming in <strong>Emfuleni</strong> Area<br />

R&S-85 Sekati Street in Boipatong R 1,700,000.00<br />

UNFUNDED<br />

R&S-86 T Kruger Street, Dickensonville R 1,190,000.00 UNFUNDED<br />

R&S-87 Mario Melani in Leeukuil R 7,650,000.00 UNFUNDED<br />

R&S-88 Golf Road in Peacehaven R 2,550,000.00 UNFUNDED<br />

R&S-89 Houtkopspr Culv in Peacehaven R 3,500,000.00 UNFUNDED<br />

R&S-90 Klip Bridge in Peacehaven R 10,000,000.00 UNFUNDED<br />

R&S-91 Mareka str Sharpeville R 4,930,000.00 R 4,930,000.00 MIG<br />

R&S-92 Construction of tarred road in Bashee Street in Three Rivers R 510,000.00 R 510,000.00 MIG<br />

R&S-93 Gen Hertzog Road Klipriver Bridge widening R 2,500,000.00 R 2,500,000.00 MIG<br />

R&S-94 Construction of tarred road in Thema Street, Bophelong<br />

Construction of tarred roadin Bram Fischer Street, Bophelong Extensions<br />

R 580,000.00<br />

MIG<br />

R&S-95<br />

7 & 8 R 2,625,030.00 R 2,625,030.00 MIG<br />

R&S-96<br />

Construction of tarred road in Nomzamo Madikizela Street, Bophelong<br />

Extensions 10 & 11 R 2,523,000.00 ELM<br />

R&S-97 Construction of tarred road in Mac Maharaj Street, Bophelong R 2,275,026.00 ELM<br />

R&S-98 Construction of tarred road in Flamingo Road Palm Springs R 1,400,000.00<br />

ELM<br />

R&S-100 Constuction of tarred road in Road N1 Zone 14 Sebokeng R 875,000.00 R 875,000.00 MIG<br />

R&S-101 Construction of tarred road in Sqaush Courts Road Erf 2/578 R 1,500,000.00 MIG & ELM<br />

R&S-102 Construction of tarred road in Evaton Road in Dreamlands R 5,610,000.00 MIG & ELM<br />

R&S-103 Construction of tarred road in Jakkalsrand Ptn in Helenasrust R 1,700,000.00 MIG & ELM<br />

R&S-104 Construction of tarred road in Vlakfontein / Lentel in Helenasrust R 5,100,000.00 UNFUNDED<br />

R&S-105 Construction of tarred road in Bennet Street in Rust Ter Vaal R 595,000.00 UNFUNDED<br />

R&S-106 Construction of tarred road in Eike Street in Rust Ter Vaal R 850,000.00 UNFUNDED<br />

R&S-107 Construction of tarred road in Olyf Street in Rus Ter Vaal Extension R 102,000.00 UNFUNDED<br />

R&S-108 Construction of tarred road in Lawrence Str in Rust Ter Vaal Extension R 425,000.00 UNFUNDED<br />

R&S-109 Construction of tarred road in De Vos Street in Rust Ter Vaal Extension R 425,000.00 UNFUNDED<br />

R&S-110 Construction of tarred road in Sefatsa Street in Sharpeville R 884,000.00 UNFUNDED<br />

R&S-111 Construction of tarred road in Rafube Street in Sharpeville<br />

Construction of tarred road in Vlakfontein Road Jocbskop to Ironside in<br />

R 442,000.00 UNFUNDED<br />

R&S-112<br />

Vlafontein<br />

Construction of tarred road in Naledi Cresent Street, Bophelong Extension<br />

R 9,350,000.00 UNFUNDED<br />

R&S-113<br />

13<br />

Construction of tarred road in David Nthimkulu Street, Bophelong<br />

R 2,450,028.00 ELM<br />

R&S-114<br />

Extension 14 R 2,975,043.00 ELM<br />

R&S-115 Construction of tarred road in Izzy Pooe Street in Bophelong Extension 15 R 3,500,040.00 ELM<br />

R&S-116 Construction of tarred road in Phali Str Bophelong Extension 16 R 1,566,000.00 ELM<br />

R&S-117 Construction of tarred road in Hawk Street Palm Springs R 1,255,000.00 UNFUNDED<br />

R&S-118 Construction of tarred road in Leeuwkuil Industrial Cul De Sac R 1,750,000.00 UNFUNDED<br />

R&S-119 Construction of tarred road in Bathokoa Street Bophelong Extension 18<br />

Construction of tarred road in Mosaka Street in Bophelong<br />

R 2,450,028.00 ELM<br />

R&S-120<br />

Property+B1062 R 247,920.00 UNFUNDED<br />

R&S-121 Construction of tarred road in Suikerbos Street in Vaaloewer R 1,895,855.00 UNFUNDED<br />

R&S-122 Construction of tarred road in Second Avenue in Sthepanopark R 2,916,700.00 UNFUNDED<br />

140


R&S-123 Construction of tarred road in Suncrest Access in SE8 R 710,592.00 UNFUNDED<br />

R&S-124 Construction of tarred road in Corra Botha in Houtkop R 3,400,000.00 UNFUNDED<br />

R&S-125 Construction of tarred road in Link to Paul Roos Street Houtkop SF R 1,870,000.00 UNFUNDED<br />

R&S-126 Construction of tarred road in Azalea Street in Rust Ter Vaal R 340,000.00 UNFUNDED<br />

R&S-127 Construction of tarred road in Krisant Street in Rus Ter Vaal R 306,000.00 UNFUNDED<br />

R&S-128 Construction of tarred road in Leeubekkie Street in Rust Ter Vaal R 595,000.00 UNFUNDED<br />

R&S-130 Construction of tarred road in Madeliefie Street in Rus Ter Vaal R 425,000.00 UNFUNDED<br />

R&S-131 Construction of tarred road in Ackerman Street in Rist Ter Vaal R 510,000.00 UNFUNDED<br />

R&S-132 Construction of tarred road in Jacobus Street in Rust Ter Vaal R 340,000.00 UNFUNDED<br />

R&S-133 Construction of tarred road in Gesiggie Street in Rust Ter Vaal R 340,000.00 UNFUNDED<br />

R&S-134 Construction of tarred road in Kastaing Street in Rust Ter Vaal R 340,000.00 UNFUNDED<br />

R&S-135 Construction of tarred road in Sonneblom Street in Rust Ter Vaal R 340,000.00 UNFUNDED<br />

R&S-136 Construction of tarred road in Karob Street in Rust Ter Vaal Extension R 340,000.00 UNFUNDED<br />

R&S-137 Construction of tarred road in Celtus Str in Rust Ter Vaal Extension R 459,000.00 UNFUNDED<br />

R&S-138 Construction of tarred road in Keree Ptn in Rust Ter Vaal Extension R 1,190,000.00 UNFUNDED<br />

R&S-139 Construction of tarred road in Greiling Street in Rust Ter Vaal Extension R 425,000.00 UNFUNDED<br />

R&S-140 Construction of tarred road in Du Toit Street in Rust Ter Vaal Extension R 340,000.00 MIG & ELM<br />

R&S-141 Construction of tarred road in Tuf in Waldrift<br />

R&S-142 Construction of tarred road in Opaal Street in Waldrift<br />

R&S-143 Construction of tarred road in Saphire Street in Waldrift<br />

R&S-144 Construction of tarred road in Kromiet Street in Waldrift<br />

R&S-145 Construction of tarred road in Robyn Street in Waldrift<br />

R&S-146 Construction of tarred road in Main Street in Waterdal<br />

R&S-147 Construction of tarred road in Syringa (Rest) Street in Louis Rust<br />

R&S-148 Construction of tarred road in Acacia Street in Louis Rust<br />

R&S-149 Construction of tarred road in Starling Street in Helenasrust<br />

R&S-150 Construction of tarred road in Kay Melani in Houtkop<br />

R&S-151 Construction of tarred road in Frederik in Houtkop SF<br />

R&S-152 Construction of tarred road in Road No 1 in Klipplaatdrift<br />

R&S-153 Construction of tarred road in Road No 2 in Klipplaatdrift<br />

R&S-154 Construction of tarred road in Anton Stegman Street in Roods Gardens<br />

R&S-155 Construction of tarred road in Ken Viljoen in Roods Gardens<br />

R&S-156 Construction of tarred road in Pierre de Villiers in Roods Gardens<br />

R&S-157 Construction of tarred road in T Kruger Str in Roods Gardens<br />

R&S-158 Construction of tarred road in George Daneel in Roods Gardens<br />

Office<br />

R&S 164 Bophelong Proper Tarring 11,5 km/annum To be sourced<br />

R&S 164 Boipatong Tarring 8 km/annum To be sourced<br />

R&S 166 Sebokeng Tarring 118 km/annum To be sourced<br />

R&S 167 Sharpville Tarring 30 km/annum To be sourced<br />

R&S 168 Bophelong Proper Bulk Stormwater To be sourced<br />

R&S 169 Boipatong Bulk Stormwater To be sourced<br />

R&S 170 Sebokeng Bulk Stormwater To be sourced<br />

R&S 171 Sharpville Bulk Stormwater To be sourced<br />

GOVERNMENTS MELLENIUM GOALS (All roads tarred by 2013)<br />

R&S-172 Beverly Hills (11,4 km) R 6,650,000.00 R 6,650,000.00 To Be Sourced<br />

R&S-173 Boipatong Ext’s (40 km) R 23,000,000.00 R 23,000,000.00 To Be Sourced<br />

R&S-174 Boitumelo (21,6 km) R 12,600,000.00 R 12,600,000.00 To Be Sourced<br />

141


R&S-175 Bophelong Ext (58,3 km) R 34,000,000.00 R 34,000,000.00<br />

R&S-176 Eaton Side (15,4 km) R 8,985,000.00 R 8,985,000.00 To Be Sourced<br />

R&S-177 Evaton (74,3 km) R 43,342,000.00 R 43,342,000.00 To Be Sourced<br />

R&S-178 Evaton North (22,5 km) R 13,125,000.00 R 13,125,000.00 To Be Sourced<br />

R&S-179 Evaton West Ext 10 (34,2 km) R 19,950,000.00 R 19,950,000.00 To Be Sourced<br />

R&S-180 Evaton West Ext 11 Ext 1 (16,6 km) R 9,684,000.00 R 9,684,000.00 To Be Sourced<br />

R&S-181 Ironsyde (30,1 km) R 17,559,000.00 R 17,559,000.00 To Be Sourced<br />

R&S-182 Lakeside Proper (5,6 km) R 3,267,000.00 R 3,267,000.00 To Be Sourced<br />

R&S-183 Stretford Proper (Palm Springs)( 17,4 km) R 10,150,000.00 R 10,150,000.00 To Be Sourced<br />

R&S-184 Stretford Ext 1 (Palm Springs)( 19,4 km) R 11,317,000.00 R 11,317,000.00 To Be Sourced<br />

R&S-185 Tshepiso Ext 1 (6,8 km) R 3,967,000.00 R 3,967,000.00 To Be Sourced<br />

R&S-186 Tshepiso Ext 2 (7,5 km) R 4,375,000.00 R 4,375,000.00 To Be Sourced<br />

R&S-187 Tshepiso Ext 3 (0,5 km) R 8,755,000.00<br />

To Be Sourced<br />

R&S-188 CE.2 (0.1 km) R 175,000.00<br />

To Be Sourced<br />

R&S-189 Leeuhof Ext 1 (0,4 km) R 700,000.00<br />

To Be Sourced<br />

R&S-190 Vaaloewer (7,1 km) R 4,145,000.00 R 4,145,000.00 To Be Sourced<br />

R&S-191 Dickonsonville (1,6 km) R 2,800,000.00<br />

To Be Sourced<br />

R&S-192 Linkholm (9,5 km) R 5,542,000.00 R 5,542,000.00 To Be Sourced<br />

R&S-193 Helenasrust Small Farms (14,5 km) R 8,459,000.00 R 8,459,000.00 To Be Sourced<br />

R&S-194 Houtkop AH (11,1 km) R 6,475,000.00 R 6,475,000.00 To Be Sourced<br />

R&S-195 Houtkop SF (6,2 km) R 3,617,000.00 R 3,617,000.00 To Be Sourced<br />

R&S-196 Kammaland AH (2,1 km) R 3,675,000.00<br />

To Be Sourced<br />

R&S-197 Lenteland AH (5,3 km) R 3,092,000.00 R 3,092,000.00 To Be Sourced<br />

R&S-198 Steel Valley (1,5 km) R 2,625,000.00<br />

To Be Sourced<br />

R&S-199 Ardenworld (4,8 km) R 2,800,000.00 R 2,800,000.00 To Be Sourced<br />

R&S-200 Bloempark (1,9 km) R 3,325,000.00<br />

To Be Sourced<br />

R&S-201 Dream land (14,3 km) R 8,342,000.00 R 8,342,000.00 To Be Sourced<br />

R&S-202 Lamont Park (4,6 km) R 2,684,000.00 R 2,684,000.00 To Be Sourced<br />

R&S-203 Lin Du Vaal (0,8 km) R 1,400,000.00<br />

To Be Sourced<br />

R&S-204 Loch Vaal (2,6 km) R 2,275,000.00 R 2,275,000.00 To Be Sourced<br />

R&S-205 Louis Rus (7,9 km) R 4,609,000.00 R 4,609,000.00 To Be Sourced<br />

R&S-206 Mooiwater (10,8 km) R 6,300,000.00 R 6,300,000.00 To Be Sourced<br />

R&S-207 Noordoch (4,1 km) R 2,392,000.00 R 2,392,000.00 To Be Sourced<br />

R&S-208 Northdene (11,5 km) R 6,709,000.00 R 6,709,000.00 To Be Sourced<br />

R&S-209 Gladwood (2,7 km R 1,575,000.00 R 1,575,000.00 To Be Sourced<br />

R&S-210 Mullerstuine (14,1 km) R 8,225,000.00 R 8,225,000.00 To Be Sourced<br />

R&S-211 Nanescol (18,61 km) R 108,500,850.00 R 108,500,850.00 To Be Sourced<br />

R&S-212 Rosashof Ext 1 (10,8 km) R 6,300,000.00 R 6,300,000.00 To Be Sourced<br />

R&S-213 Rosashof Ext 2 (26,2 km) R 15,284,000.00 R 15,284,000.00 To Be Sourced<br />

R&S-214 Riespspruit (1,5 km) R 2,625,000.00 R 2,625,000.00 To Be Sourced<br />

R&S-215 Roodia (4,1 km) R 2,392,000.00 R 2,392,000.00 To Be Sourced<br />

R&S-216 Roods Gardens (4,1 km) R 2,392,000.00 R 2,392,000.00 To Be Sourced<br />

R&S-217 Rust ter Vaal (1,6 km) R 2,800,000.00<br />

To Be Sourced<br />

R&S-218 Stefanopark (18,2 km) R 10,617,000.00 R 10,617,000.00 To Be Sourced<br />

R&S-219 Theoville (12,8 km) R 7,450,000.00 R 7,450,000.00 To Be Sourced<br />

R&S-220 Vaalfontein (16,9 km) R 9,858,500.00 R 9,858,500.00 To Be Sourced<br />

R&S-221 Vaalview (19,5 km) R 11,375,000.00 R 11,375,000.00 To Be Sourced<br />

R&S-222 Vlakfontein (4,3 km) R 2,509,000.00 R 2,509,000.00 To Be Sourced<br />

R&S-223 Vlakplaats (4,2 km) R 2,450,000.00 R 2,450,000.00 To Be Sourced<br />

R&S-224 Waterdal (18,2 km) R 10,616,750.00 R 10,616,750.00 To Be Sourced<br />

R&S-225 Zuurfontein (15,6 km) R 9,100,000.00 R 9,100,000.00 To Be Sourced<br />

R&S-226 Blesbokfontein (2,2 km) R 1,925,000.00 To Be Sourced<br />

R&S-227 Vanwaartshof (2,5 km) R 2,187,500.00 To Be Sourced<br />

R&S-228 Glen Donald (3,1 km) R 2,712,500.00 To Be Sourced<br />

R&S-229 Ebner on Vaal (2,9 km) R 2,537,500.00 To Be Sourced<br />

R&S-230 Drakeville (1,6 km) R 2,800,000.00 To Be Sourced<br />

142


R&S-231 Steelpark (0,7 km) R 1,225,000.00 To Be Sourced<br />

R&S-232 Annaton (1,4 km) R 2,450,000.00 To Be Sourced<br />

R&S-233 Harmoniesrus (0,8 km) R 1,400,000.00 To Be Sourced<br />

R&S-234 Mirra Vaal (1,1 km) R 1,925,000.00 To Be Sourced<br />

R&S-235 Rusticana (0,5 km) R 875,000.00 To Be Sourced<br />

R&S-236 Homer (0,7 km) To Be Sourced<br />

R&S-237 Geusous Park (1,8 km) To Be Sourced<br />

R&S-238 Mckay SF (0,4 km) To Be Sourced<br />

R&S-239 Sassobyl (0,9 km) To Be Sourced<br />

R&S-240 Springcol (0,5 km) To Be Sourced<br />

R&S-241 Staalrus (1 km) To Be Sourced<br />

R&S-242 Steel View (2,1 km) To Be Sourced<br />

R&S-243 Waldrif (1,1 km) To Be Sourced<br />

R&S-244 Windsor on Vaal (1,9 km) To Be Sourced<br />

ADDITIONAL PROJECTS (Master Plan)<br />

R&S-251 Rossini Blvd Corridor and Service Road R 3,000,000.00<br />

UNFUNDED<br />

R&S-252 Faraday Blvd Corridor and Service Road<br />

Procure servitude for New Intersection between Nile and Ring Rd on Gen<br />

R 2,000,000.00<br />

UNFUNDED<br />

R&S-253<br />

Hertzog Street R 1,000,000.00<br />

UNFUNDED<br />

R&S-254 Doublin of Houtkop Bridge over Klip River R 3,000,000.00<br />

UNFUNDED<br />

R&S-255 Van Riet Louw/Houtkop Traffic Lights R 625,000.00<br />

UNFUNDED<br />

R&S-257 Nile Road Corridor and service Roads R 2,040,000.00<br />

UNFUNDED<br />

R&S-258 Ring Road Corridor and Service Road, Three Rivers R 2,380,000.00 R 3,000,000.00 UNFUNDED<br />

R&S-265 Potlano Lebello<br />

R&S-266 & Vondochi Beufoli St<br />

Emanzini (P) Sebokeng<br />

R&S-271 Thabatshoeu Street R 460,200.00 R 460,200.00 UNFUNDED<br />

R&S 279 Street C<br />

R&S 280 Street D<br />

R&S 281 Street E<br />

Tshepo-Themba (S) Sebokeng Zone 6 Ext 3<br />

R&S 282 Street P<br />

R&S 283 Street Q<br />

R&S 284 Street R<br />

Thandukwazi (S) Sebokeng Zone 7<br />

R&S 285 Magrietha Prinsloo St<br />

Zithulele (S) in Sebokeng Zone 7<br />

R&S 287 Nguna St<br />

Maxeke (S) Sebokeng Zone 7<br />

R&S 288 Street U<br />

R&S 289 Street V<br />

Mqiniswa (P) Bophelong Prop<br />

R&S 290 Mohayi St,<br />

R&S 291 Xuma St &<br />

R&S 292 25 th Ave<br />

Ikobetseng in Bophelong Ext 6<br />

R&S 294 Helen Suzman St<br />

R&S 295 Jeff Radebe St<br />

Leema (P) Evaton Small Farms<br />

R&S 296 Street (ii)<br />

Jabulani Thabang (P) Evaton Small Farms<br />

R&S 298 Street (iii)<br />

Jordan (S) Evaton<br />

R&S 299 Glasgow St R 1,055,700.00<br />

UNFUNDED<br />

143


R&S 300 Dona St<br />

Letshego (P) in Evaton<br />

R&S 301 Ward St<br />

Mogogodi (P) Sebokeng Zone 11<br />

R 2,600,150.00<br />

UNFUNDED<br />

R&S 302 Maroke St (28) R 1,309,850.00<br />

UNFUNDED<br />

R&S 303 Matlale St (30)<br />

R&S 304 Boleu (32)<br />

Sizanani (S) in Sebokeng Zone 13 R 586,500.00<br />

UNFUNDED<br />

R&S 305 Ntja St (47)<br />

Sebokeng Tech Cent R 1,270,750.00<br />

UNFUNDED<br />

R&S 306 Lerothodi St (12)<br />

Bafokeng Palm Springs R 977,500.00<br />

UNFUNDED<br />

R&S 307 Bishopbird St<br />

Itsebeng (P) Sebokeng Zone 3<br />

R&S 308 Street F<br />

R&S 309 Street G<br />

R&S 310 Street H<br />

Mahareng in Bophelong Ext 17<br />

R&S 311 Bafokeng St<br />

Suncrest (S) SE8<br />

R&S 312 Service Road<br />

Botebotsebo (S) Sebokeng Zone 14<br />

R&S 313 Street T<br />

Botlehadi (S) Evaton<br />

R&S 314 Ward St<br />

Ntsele (S) Evaton<br />

R&S 315 Mackay St<br />

Letsemeng (P) Evaton<br />

R&S 316 Buffalo St<br />

Phahamang (S) Evaton<br />

R&S 317 Buffalo St<br />

Fundulwazi (S) Sebokeng Zone 12<br />

R&S 318 Makalima St (56)<br />

R&S 319 Masiza St (54)<br />

R&S 320 Mbali St (59)<br />

Boikgethelo (S) Sebokeng Zone 13<br />

R&S 321 Rathebe St(8)<br />

L Magasela (P) Evaton North<br />

R&S 322 Mlotsha St<br />

Tlholo (P) in Sebokeng Zone 7<br />

R&S 323 Itsoseng St<br />

R&S 324 Sekonyela St<br />

R&S 325 Namahadi St<br />

R&S 326 Toto St<br />

Montsusi (P) Sebokeng Zone 7<br />

R&S 327 Kubheka Str<br />

Parksig (P) Louis Rus A.H.<br />

R&S 328 Syringa Ave<br />

R&S 329 Acacia St<br />

Vaalrivier (P) in Nanescol A.H.<br />

R&S 330 Road A<br />

R&S 331 Road B<br />

Makgethe (P) & Lesabasaba (P) Sebokeng Zone 13<br />

R&S 332 Mosebetsi (51)<br />

R&S 333 Lewetsi (22)<br />

R&S 334 Lekope (7)<br />

144


Setlabotjha (P) Sebokeng Zone 14<br />

R&S 335 Street J1<br />

R&S 336 Street K1<br />

R&S 337 Street J<br />

Esokwazi (S) Sebokeng Zone 8<br />

R&S 338 Street W<br />

R&S 339 Street X<br />

R&S 340 Street Y<br />

Kgokare (S) Sebokeng Zone 3<br />

R&S 341 Street J<br />

Phamehlo (S) in Sebokeng Zone 7<br />

R&S 342 Lazidze St<br />

R&S 343 Mzilikazi St<br />

Mopholosi (S) Lakeside<br />

R&S 344 Street S<br />

Mokotuli (P) Sebokeng Zone 7<br />

R&S 345 Street T<br />

Community School Bophelong Proper<br />

R&S 346 Mosaka St<br />

R&S 347 Thema St<br />

Tsolo (S) Bophelong Prop<br />

R&S 348 Jabavu (Rest) Str<br />

R&S 349 Plaatjie (Rest) Str<br />

Mthombolwazi (P) Sebokeng Zone 12<br />

R&S 350 Cetshwayo (66)<br />

R&S 351 Bikitsha (69)<br />

R&S 352 Mfolosi Str<br />

Tsediso (P) & Qhoweng (S) Sebokeng Zone 13<br />

R&S 353 Maseru St(32)<br />

R&S 354 Wetsi St(33)<br />

R&S 355 Lefafatsane St<br />

Ekujuleni (P) Sebokeng Zone 3<br />

R&S 356 Street A<br />

R&S 357 Street B<br />

Khutlo-Tharo (S) Sebokeng Zone 3<br />

R&S 358 Street K<br />

R&S 359 Street L<br />

R&S 360 Street M<br />

R&S 361 Street N<br />

Atlehang (P) Sebokeng Zone 7<br />

R&S 362 Bafokeng St<br />

R&S 363 Maroteng St<br />

PRIORITY TOWNSHIP PROGRAMME(Gautrans & <strong>Emfuleni</strong> & Other Grant Funders) :<br />

R&S 364 Thulare- & Bajatladi Str in Sebokeng Unit 7<br />

R&S 365 Kgaketla St Sebokeng Zone 11<br />

R&S 366 Sharpville Road 1 (Erf 3097 -3123)<br />

R&S 367 Sharpville Road 2 (Erf 2731 -2757)<br />

R&S 368 Hlalefang St Sidewalks & Stormwater<br />

R&S 369 Bakoena Str in Boipatong<br />

R&S 370 Batswana St in Boipatong<br />

R&S 371 Bapedi Rd in Boipatong<br />

R&S 372 Malebogo Rd in Boipatong<br />

R&S 373 Rathebe Str in Sebokeng Unit 13<br />

R&S 374 Matanzima Str in Sebokeng Unit 12<br />

R&S 375 Trichardt Str in Sebokeng Zone 7<br />

R&S 376 Mmampoi Str in Sebokeng Unit 11<br />

145


R&S 377 Mabozu Str in Sebokeng Unit 12<br />

R&S 378 Rafube Str in Sharpeville<br />

R&S 379 Cemetery Rd in Sharpeville<br />

R&S 380 Missisippi Str in Sebokeng Ext 15<br />

R&S 381 Erf 5102-54552 in Sebokeng Unit 3<br />

R&S 382 Erf 16-15 in Sebokeng Unit 6 Ext 4<br />

R&S 383 Trainstation Rd in Sebokeng Unit 6 Ext 4<br />

R&S 384 Erf 57011-57312 in Sebokeng Unit 3<br />

R&S 385 B Welchman to Boundary in Sebokeng Unit 12 Ext 1<br />

R&S 386 Thembu Str in Boipatong<br />

R&S 387 Erf 9048-734 in Sharpeville<br />

R&S 388 Erf 54301 – 55312 in Sebokeng Unit 3<br />

R&S 389 Erf 135-275 in Sebokeng Unit 6 & 7<br />

R&S 390 Balohi Str in Sebokeng Unit 7<br />

R&S 391 Maqoma Str in Sebokeng Unit<br />

R&S 392 Erf 1132-860 in Sebokeng Unit 6<br />

R&S 393 Erf 244 – 285 in Sebokeng Unit 6<br />

R&S 394 Erf 438-98 in Sebokeng Unit 6 Ext 5<br />

R&S 395 Erf 54702 – 60039 in Sebokeng Unit 3<br />

R&S 396 Erf 59238 – 60039 in Sebokeng Unit 3<br />

R&S 397 Mpangeva Str in Sebokeng Unit 12<br />

R&S 398 M Str in Boipatong<br />

R&S 399 Bapedi Str in Boipatong<br />

R&S 400 Lekopo / Lewetse Str in Sebokeng Unit 13<br />

R&S 401 Sefatsa Str in Sharpeville<br />

R&S 402 Mbata Ave in Sharpeville<br />

R&S 403 Nkomo Rd in Sharpeville<br />

R&S 404 Lesiea Str in Sharpeville<br />

R&S 405 Vilikazi Str in Sharpeville<br />

R&S 406 Erf 10-383 in Sebokeng Unit 6 Ext 5<br />

R&S 407 Bantu Biko Str in Sebokeng Unit 12 Ext 1<br />

R&S 408 Magogo Str in Sebokeng Unit 12<br />

R&S 409 Boleu / Moroke Link in Sebokeng Unit 11<br />

R&S 410 Wetsi / Masena / Lefafatsane Link in Sebokeng Unit 13<br />

R&S 411 Xuma Str in Bophelong<br />

R&S 412 Mamelodi Str in Boipatong<br />

R&S 413 Ben Pitsi Str in Sharpeville<br />

R&S 414 Libero Str in Sharpeville<br />

R&S 415 Sekese Str in Sharpeville<br />

R&S 416 Lazidze Str in Sebokeng Unit 7<br />

R&S 417 Mbeki Str in Sebokeng Unit 12 Ext 1<br />

R&S 418 Matanzima Str in Sebokeng Unit 12<br />

R&S 419 Motebang / Marematlou / Khoedi Str Link in Sebokeng Unit 11<br />

R&S 420 Ntja Mangope Link in Sebokeng Unit 13<br />

R&S 421 Erf 20329 – 21239 in Sebokeng Unit 14<br />

R&S 422 Erf 21112 – 65698 in Sebokeng Unit 14<br />

R&S 423 Erf 22002 – 20390 in Sebokeng Unit 14<br />

R&S 424 Mohayi Str in Bophelong<br />

R&S 425 Khaketla Str in Sebokeng Unit 11<br />

R&S 426 Sanuku Str in Sharpeville<br />

R&S 427 Leboko Dr in Sharpeville<br />

R&S 428 Mahlonoko Str in Sharpeville<br />

R&S 429 Erf 4520 – 4035 in Sharpeville<br />

R&S 430 Erf 5550 – 9125 in Sharpeville<br />

R&S 431 Erf 6475 – 6491 in Sharpeville<br />

R&S 432 Erf 53308 – 60484 in Sebokeng Unit 3<br />

146


R&S 433 Cetshwayo / Bikitsha Str in Sebokeng Unit 12<br />

R&S 434 Pitseng School Road (Erf 12 – 50) in Sebokeng Unit 10 Ext 2<br />

R&S 435 Bokwe Str in Bophelong<br />

R&S 436 Thenba Str in Bophelong<br />

R&S 437 Vilikazi Str in Bophelong<br />

R&S 438 Jabavu (Rest) in Bophelong<br />

R&S 439 Plaatje (Rest) in Bophelong<br />

R&S 440 Seme Str in Bophelong<br />

R&S 441 Sekhukhuni Str in Boipatong<br />

R&S 442 Dr Nkomo (Rest) in Boipatong<br />

R&S 443 Leshoboro Str in Boipatong<br />

R&S 444 Bafokeng Rd in Bophelong<br />

R&S 445 Hlalepo Rd in Sebokeng Unit 7<br />

EVATON URBAN RENEWAL PROGRAM<br />

R&S-48<br />

Milner Road (2 090 m) Road, S/W and Paving<br />

R&S-446<br />

Evaton Road (1 300 m) road, S/W, bridge & Paving<br />

R&S-447 Old Golden Highway (3 950 m) Dual garriage, S/W & Paving<br />

R&S-448 West Road (4 500 m) road, S/W, bridge & Paving<br />

R&S-449 Union Rd Pedestrian Paving (2 400 m)<br />

R&S-450 Sterling Rd Pedestrian Paving (1 575 m)<br />

R&S-451 Boundary Rd Pedestrian Paving (2 560 m)<br />

R&S-452 Hamilton Rd Pedestrian Paving (2 100 m)<br />

R&S-453 Taxi Rank (Cnr Selbourne & First)<br />

R&S-454 Taxi Rank (Cnr Adams & Sterling)<br />

Western Precinct (Old Golden Highway) Bus- & Taxi Rank, Town Square,<br />

R&S-455<br />

Roads, Parking & Mixed Housing<br />

Eastern Precinct (Resedentia Station) Taxi Rank, Town Square & Mixed<br />

R&S-456<br />

Housing<br />

R&S-457 Heritage Precinct Roads, parking & Paving<br />

R&S-458 Small Farms Precinct Roads & S/W<br />

Resurfacing Eastern Rd (3 520 m) 30 mm asphalt, widening, kerbing,<br />

R&S-459<br />

sidewalks & S/W<br />

R&S-460 Moleko Rd (600 m) Road, S/W and Paving<br />

R&S-461 Bodea Rd (600 m) Road, S/W and Paving<br />

R&S-462 Chamberlain Rd (600 m) Road, S/W and Paving<br />

R&S-463 Durban Road (2 030 m) road, S/W, bridge & Paving<br />

R&S-464 1St Avenue (1 700 m) road, S/W & Paving<br />

R&S-465 Wright Road (1 300 m) road, S/W, bridge & Paving<br />

R&S-466 King Road (2 100 m) road, S/W, bridge & Paving<br />

R&S-467 5 th Road road, S/W & Paving<br />

R&S-468 Housing (Brown Fields) Roads & S/W<br />

WATER AND SANITATION<br />

R 639,647,013.00 R 1,473,182,426.00<br />

W&S-01 Basic sanitation supply to Informals -<br />

W&S-02 Basic sanitation and replace VIP with full borne sanitation system R 20,000,000.00 R 20,000,000.00 MIG<br />

W&S-04<br />

W&S-06<br />

Carbon credit projects(Rehabilitation of electricity generation system from<br />

gas at Sebokeng and eliminate sewege pump stations) in Vereening.<br />

Water Demand Management. Includes water system repair and water /<br />

R 3,000,000.00 Unfunded<br />

sanitation awareness programs in <strong>Emfuleni</strong> R 10,000,000.00 R 10,000,000.00 DWAF and Council<br />

147


W&S-10 Master Plan and Asset Management maintenance<br />

Long term sanitation project. Includes new WCW's for <strong>Emfuleni</strong> and<br />

R 500,000.00 R 500,000.00 OPEX<br />

W&S-11<br />

Midvaal and elimination of sewer pump stations<br />

W&S-15 Rietkuil - sewer R 4,000,000.00<br />

Developers<br />

W&S-16 Bulk W&S services for new developments R 20,000,000.00 R 20,000,000.00 Developers<br />

W&S-22 Vaaloewer-sewer system R 2,500,000.00<br />

MIG<br />

W&S-24 Upgrade metsi telephone system<br />

W&S-25 Entrance road to Northern Depot to be upgraded<br />

ELECTRICITY<br />

R 57,000,000.00 R 53,500,000.00<br />

EY-02 Main supply to waterdal 11kv line R 2,500,000.00<br />

ELM<br />

EY-04 Upgrade of 11kV network in Three Rivers R 1,000,000.00 R 3,000,000.00 ELM<br />

EY-05 Replacement of Rietspruit cable R 200,000.00<br />

UNFUNDED<br />

EY-06 Upgrading of Electricity Network in Roods Gardens R 200,000.00 R 200,000.00 ELM<br />

EY-07 Upgrading of Rural 11kV network in Vereeniging R 200,000.00 R 120,000.00 ELM<br />

EY-09 Replacement of LV Board Heaviside substation (Vanderbijlpark) R 200,000.00 R 200,000.00 ELM<br />

EY-10 Replacement of 11kV open link Switches in various areas<br />

Replacement of outdated fuse-ways new board (Vanderbijlpark &<br />

R 100,000.00 R 200,000.00 UNFUNDED<br />

EY-11<br />

Vereeniging) R 100,000.00<br />

UNFUNDED<br />

EY-12 Replacement of 88kV Air breaks and Isolators in Vecor substation<br />

EY-13 Replacement of Munic switchgear (40KA) ELM<br />

EY-16 Replace Air Breaks in Usco Substation R 800,000.00<br />

UNFUNDED<br />

EY-17 Install 80 MVA Transformers in Davsteel Substation (Replace 80MVAtrf) R 15,000,000.00 ELM<br />

EY-18 Install Protection in Refractories Substation<br />

EY-19 Installation of Switchgear Panels in (Three Rivers Main) for Ripple Control<br />

EY-20 Installation of Eskom check metering system in all 275/88KV Substations<br />

EY-22 Upgrade 11kv breakers in Sonlandpark Substation R 2,000,000.00<br />

ELM<br />

EY-23 Swing 11kV from Bedworthpark Substation to Vesco substation R 800,000.00<br />

UNFUNDED<br />

EY-24 Change 5 MVA by 20MVA Transformer in Duncanville Substation R2,500,000 R 400,000.00 ELM<br />

EY-25 Change 5 MVA Transformer in Roshnee Substation R 5,000,000.00<br />

ELM<br />

EY-26 Installation of SCADA System<br />

Installation of Auto Reclosers: Total (Dadaville 5, Sonlandpark,<br />

R 1,000,000.00 R 1,000,000.00 ELM<br />

EY-28<br />

Arconpark(Klinker), 2x Koppisol, 2x Roshnee, Springfield)<br />

Install cable 300mm² (1.6km) between (Frikkie Meyer – Vaal Mall)<br />

R 350,000.00<br />

ELM<br />

EY-30<br />

substations UNFUNDED<br />

EY-31 Replacement of Stolen network Riverbend Garden<br />

Replace cables Powerville to Vereeniging Town & move ripple from Rand<br />

UNFUNDED<br />

EY-33<br />

water to Vereeniging<br />

Registration of Servitudes Northern Area (Quaggasfontein (Boiketlong),<br />

R 250,000.00<br />

ELM<br />

EY-34<br />

Sonlandpark, Waterdal) R 250,000.00 R 750,000.00 UNFUNDED<br />

EY-35 William Nicol 88/11kV substation (Mantevrede) R300,000 R4,000,000 ELM<br />

EY-37 Install cable 240mm² (1.7km) between (Van Eck East – Unibyl) substation R 2,000,000.00<br />

ELM<br />

EY-39 Second supply cable 70mm² to SE10 R1,000000 MIG<br />

EY-40 Rietkuil Agricultural Public lighting (10 High Masts) UNFUNDED<br />

EY-42 New Village Public Lighting (4 High Masts)<br />

Sonderwater (Sebokeng Extension 25 & 26) (1200 Stands) (ESKOM)<br />

UNFUNDED<br />

EY-43<br />

Subsidy of (R3100.00) UNFUNDED<br />

EY-44 Sonderwater Public Lighting (8 High Masts) UNFUNDED<br />

EY-46 Tshepong (Vlakfontein) (bulk supply) R 20,000,000.00 DME<br />

EY-47 Tshepiso North Extension 3 (1500 Stands) Subsidy of (R3100.00) UNFUNDED<br />

EY-48 Tshepiso North Extension 3 Public Lighting (10 High Masts) UNFUNDED<br />

148


EY-49 Tshepiso North Extension 3 (Bulk supply) DME<br />

EY-50 Quaggasfontein / Boiketlong (4900 Stands) Subsidy of (R3100.00) R 10,000,000.00<br />

DME<br />

EY-51 Quaggasfontein / Boiketlong Public Lighting (33 High Masts) UNFUNDED<br />

EY-52 Quaggasfontein / Boiketlong 20MVA (Bulk connection) UNFUNDED<br />

EY-53 Extension of lighting on road P73-1 (Golden Highway - Bophelong) R 450,000.00 R 450,000.00 ELM<br />

EY-54 Extension of lighting (Houtkop Road - Sebokeng) R 300,000.00 R 300,000.00 ELM<br />

EY-55 Installation of Street lighting in Ascot Road R 200,000.0 R 200,000.00 ELM<br />

EY-56 Upgrading of Street Lighting in Ironsyde & Debonairpark UNFUNDED<br />

EY-58 Development of Public Lighting Master Plan R 250,000.0 R 250,000.00 ELM<br />

EY-59 Installation of Street lighting in Sebokeng Zone 14 UNFUNDED<br />

EY-60 Installation of Street lighting in Sebokeng Zone 10 UNFUNDED<br />

EY-61 Installation of Street lighting in Sebokeng Zone 3 UNFUNDED<br />

EY-62 Installation of Street lighting in Sebokeng Zone 12 UNFUNDED<br />

EY-63 Installation of Street-lighting in Sebokeng Zone 7 R 420,000.00<br />

ELM<br />

EY-65 Evaton Small Farm High Masts MIG & ELM<br />

EY-67 Sebokeng Extension 6 & 7 High masts (15 H/mast) UNFUNDED<br />

EY-68 Rust-ter-Vaal High masts (5 H/mast UNFUNDED<br />

EY-69 Tshepong High masts (6 H/mast UNFUNDED<br />

EY-70 Maintenance of electricity infrastructure R 800,000.00<br />

ELM<br />

EY-71 Maintenance of public lighting infrastructure ELM<br />

EY-73 NERSA approved projects UNFUNDED<br />

EY-74 Public Lighting Debonairpark UNFUNDED<br />

EY-75 Electricity SW5 UNFUNDED<br />

EY-76 NER 1.2% (11KV Three Rivers) UNFUNDED<br />

EY-77 11kV Three Rivers UNFUNDED<br />

EY-84 Replacement of verdun 88kv swicthgear (40kA) UNFUNDED<br />

EY-85 VESCO 10MVA TRANSFORMER UNFUNDED<br />

EY-86 Unibijl Substation 3rd Transformer(Consulting Fees) R 3,000,000.00 ELM<br />

EY-98 Replace redundant Streelight Cables in Vanderbijlpark R 500,000.00<br />

ELM<br />

EY-99 Replace streetlight cables in Vereeniging R 500,000.00<br />

ELM<br />

EY-100 Upgrade Rural lines in Vanderbjlpak R 700,000.00 ELM<br />

EY-101<br />

WASTE MANAGEMENT<br />

Bedworthpark extension 4,5,6 &8 R 4,000,000.00 ELM<br />

WM-01 Awareness and clean up campaigns in key areas (Restore Dignity) R 5,285,253.00 R 5,549,515.00 UNFUNDED<br />

WM-02 Establish Industry Waste Exchange office<br />

WM-08 Develop master plan for Waste and Environment R 75,000 UNFUNDED<br />

WM-10 Develop New Mini Dump Transfer Station for Vanderbijlpark region<br />

Closure permits and rehabilitate Kwaggastroom,Zone 16 borrow pits &<br />

R 8,500,000.00 R 5,500,000.00<br />

WM-11<br />

landfilli and Sharpville closed dump R 600,000.00 R 600,000.00 MIG<br />

WM-13 Combat illegal dumping (through campaigns) R 750,000 R 750,000 UNFUNDED<br />

WM-14 Procure tyre shredder<br />

Replace 100 x skip (6 cub. Metre containers) in mini dump / transfer<br />

R 5,000,000 UNFUNDED<br />

WM-15<br />

stations) for Vereeniging region R 300,000 R 300,000 UNFUNDED<br />

WM16,17 &20 Refurbish Waste Management offices<br />

Purchase critical items needed for enhancement of environment and<br />

R 3,500,000 UNFUNDED<br />

WM-18<br />

health related issues (Bontle ke Botho) R 987,000 CAPITAL ITEM (GRANT)<br />

WM-21 Outsource possible new services R 3,600,000.00 R 3,600,000.00 UNFUNDED<br />

WM-22 Waste Management in Boipatong R 1,500,000 UNFUNDED<br />

WM-23 Waste management in Sebokeng R 1,500,000 UNFUNDED<br />

WM-24 Waste Management in Bophelong R 1,500,000 UNFUNDED<br />

WM-25 Waste Management in Sharpeville R 1,500,000 UNFUNDED<br />

WM-27 Street sweeping and Refuse collection R 65,000,000 UNFUNDED<br />

WM-28 Operation of landfill sites R 10,500,000 R 12,000,000.00 UNFUNDED<br />

WM-31 Operation Restore Dignity –Evaton<br />

149


WM-32 Roll out to Sebokeng, Bophelong, Boipatong, Tshepiso and Sharpeville R 26,132,908.00<br />

UNFUNDED<br />

WM-33 Roll out to Vanderbijlpark and Vereeniging R 17,290,513.00 UNFUNDED<br />

WM-34 Develop Intergrated Waste Strategy RG<br />

WM-35 Establish CBD renewal project R 350,000.00<br />

RG<br />

WM-36 Develop Waldrift phase 4 RG-R1 000 000<br />

WM-37 Reclaiming of Carbon Credits R 6,000,000.00 R 6,000,000.00 central energy funds<br />

WM-38 Establish collection stations R 1,800,000.00 MIG<br />

WM-39 Erect composting plant R 5,000,000 UNFUNDED<br />

WM-40 Erect Builders rubble crusher plant R 8,500,000.00 ELM UNFUNDED<br />

WM-41 Construction of Phase 4 - Waldrift R 4,000,000 UNFUNDED<br />

WM-43 Roll out 240 litre bins to outer areas R 9,700,000.00 MIG<br />

WM-43 Bins(all wards) R 200,000.00 ELM<br />

150


CHAPTER 15<br />

15.1 INTEGRATION PHASE<br />

During this phase of the IDP process, the proposed projects are screened to ensure that<br />

they are in line with the priority issues, development objectives, strategic guidelines and<br />

resources. On the basis of projects proposals, sector programmes and plans are<br />

prepared to ensure that the projects can be implemented in a coordinated and integrated<br />

way.<br />

Considerable effort has been taken to engage other government departments. At an<br />

operational level, key actors have been brought on board whenever possible with<br />

respect to pilot projects to ensure integrated approaches and linkages to local and<br />

provincial development plans.<br />

One of the key essences in doing the IDP is to promote co-ordination between local,<br />

provincial and national governments. The different spheres of government are<br />

encouraged to work in a coordinated manner to tackle the development needs in a local<br />

area. For instance if the Department of Health plans to build a clinic in an area, this<br />

phase has to outline the integration of service delivery as far as clinic operation is<br />

concerned. For example, the <strong>Municipality</strong> should facilitate roads, electricity, water and<br />

sanitation for the effective functioning of the clinic.<br />

All the development plans must now be integrated. The <strong>Municipality</strong> should also have<br />

overall strategies for issues like dealing with AIDS, poverty alleviation and disaster<br />

management.<br />

The Integration phase has to incorporate different sector plans and programmes. The<br />

outputs of this phase should include:<br />

• Municipal Five Year Plan<br />

• Water Service Development Plan<br />

• HIV and AIDS Plan<br />

• Five Year Capital Investment Plan<br />

• Integrated Spatial Development Plan<br />

• Integrated Waste Management Plan<br />

• Disaster Management Plan<br />

• Institutional Plan<br />

• Performance Management Plan<br />

• <strong>Local</strong> Economic Development Plan<br />

• Five Year Infrastructure Plan<br />

• Service Delivery Budget Implementation Plan<br />

The ELM is still having some challenges with regard to the development of various<br />

plans. However ELM does not have the following plans yet:<br />

• Municipal Five Year Plan<br />

• Five Year Capital Investment Plan<br />

151


• Integrated Spatial Development Plan<br />

• Disaster Management Plan (Sedibeng District <strong>Municipality</strong>)<br />

• Institutional Plan<br />

• <strong>Local</strong> Economic Development Plan<br />

<strong>Emfuleni</strong> <strong>Local</strong> <strong>Municipality</strong> have the following plans/strategies in place:<br />

• Anti Fraud & Corruption Strategy<br />

• Integrated Waste Management Plan<br />

• Water Service Development Plan<br />

• Service Delivery & Budget Implementation Plan<br />

• Crime Prevention Strategy<br />

152

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!