21.05.2014 Views

(HPP) Performance Measure Manual

(HPP) Performance Measure Manual

(HPP) Performance Measure Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>HPP</strong> 15.1<br />

How is this measure<br />

operationalized?<br />

NOTE: The “start time” for this measure refers to<br />

the date and time that the health and medical<br />

lead at the local, regional, or State level receives a<br />

request for volunteers. The “stop time” for this<br />

measure refers to the time that the last requested<br />

volunteer arrives at a staging area or on scene,<br />

but no later than the requested timeframe.<br />

Awardees are encouraged to report on one (1)<br />

long running and one (1) acute incident during the<br />

budget period, if possible. The awardee may also<br />

report on two (2) long running or two (2) acute<br />

incidents as an option. If neither of these is<br />

possible, reporting on two (2) exercises or<br />

planned events is permissible.<br />

Volunteer Management<br />

Pre-Incident<br />

Healthcare<br />

Preparedness<br />

Response<br />

Hospital Preparedness Program (<strong>HPP</strong>) <strong>Performance</strong> <strong>Measure</strong> <strong>Manual</strong>,<br />

Guidance for Using the New <strong>HPP</strong> <strong>Performance</strong> <strong>Measure</strong>s Page | 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!