Master Plan October 2011 - Pacific Lutheran University
Master Plan October 2011 - Pacific Lutheran University
Master Plan October 2011 - Pacific Lutheran University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DEVELOPMENT PROGRAM<br />
DEVELOPMENT PLANS<br />
PLANNED Projects (0-10 years, <strong>2011</strong>-2020)* New Square Footage Renovation Primary Use Modified<br />
Interior Spaces<br />
101 Eastvold Restoration, Phase I (complete) 0 yes yes<br />
102 Eastvold Restoration, Phase II 5,000 (possible addition) yes no<br />
103 East Campus renovation and new construction 50,000 potential? yes<br />
104 Rieke Science Center Renovation 3,000 yes no<br />
105 Olson Auditorium 18,000 (addition) yes no<br />
106 Fitness and Sports Center, Phase I 51,000 no na nc<br />
107 Residence hall or student apartments, 200 beds<br />
(location to be determined)**<br />
90,000 no na nc<br />
108 Health Center 10,000 no na nc<br />
109 Greenhouse (geothermal) 2,400 no na nc<br />
110 Residence Hall renovations 0 yes no<br />
111 Mortvedt Library / Ramstad renovations 0 yes no<br />
112 Instructional improvements in classrooms and<br />
laboratories<br />
0 yes no<br />
113 Technology infrastructure improvements 0 yes no<br />
114 Campus Welcome Center 8,000 no na nc<br />
115 Intergenerational Housing 100,000 no na nc<br />
116 Swimming Pool 0 yes no<br />
Subtotal Interior Spaces 336,000<br />
November <strong>2011</strong><br />
Imminent Construction Projects<br />
Ongoing<br />
Technology infrastructure improvements and renovation of various classrooms and laboratories will take place each year. As funding<br />
allows, renovation of various buildings will continue.<br />
<strong>2011</strong> Complete Phase I renovation of Eastvold Hall (101)<br />
2012 Complete one synthetic turf athletic field and construct one natural turf field at the location of the second synthetic turf field (120)<br />
2013 Complete Phase II restoration of Eastvold Hall. The new name will be the Karen Hille Phillips Center for the Performing Arts (102)<br />
2013 Complete mixed use development partially located on East campus (103)<br />
2013 Continue renovation of Rieke Science Center (104)<br />
2013 Main Campus Entrance (122)<br />
32 <strong>Pacific</strong> <strong>Lutheran</strong> <strong>University</strong> MIMP