Master Plan October 2011 - Pacific Lutheran University
Master Plan October 2011 - Pacific Lutheran University
Master Plan October 2011 - Pacific Lutheran University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
C L<br />
DEVELOPMENT PROGRAM<br />
PUBLIC R.O.W.<br />
R.O.W.<br />
BIORETENTION AREAS<br />
RIGHT-OF-WAY<br />
CURB INLET TO ALLOW<br />
WATER INTO BIORETENTION<br />
AREAS, CURB BEYOND<br />
GRATE AT SIDEWALK<br />
CHANNEL<br />
A<br />
BIORETENTION SOIL MIX<br />
PARKING<br />
C L<br />
CURB<br />
SECTION A<br />
PARKING<br />
B<br />
CURB INLETS AND GAP WITH<br />
GRATE ACROSS SIDEWALK<br />
CURB INLETS TO ALLOW<br />
SURFACE FLOW TO ENTER<br />
BIORETENTION AREAS<br />
ROUTE RUNOFF FROM<br />
ROAD TO BIORETENTION<br />
AREAS<br />
RIGHT-OF-WAY<br />
CURB INLET TO<br />
ALLOW WATER INTO<br />
BIORETENTION AREAS,<br />
CURB BEYOND<br />
GRATE AT SIDEWALK<br />
R.O.W.<br />
CURB<br />
BIORETENTION AREAS<br />
ROUTE RUNOFF<br />
FROM ROAD TO<br />
BIORETENTION AREAS<br />
SECTION B<br />
BIORETENTION<br />
SOIL MIX<br />
ROADWAY<br />
November <strong>2011</strong><br />
BIORETENTION PLANTING BULBS - PLAN<br />
<strong>Pacific</strong> <strong>Lutheran</strong> <strong>University</strong> MIMP<br />
43