21.07.2014 Views

SX25 Series Process Controller - Spirax Sarco

SX25 Series Process Controller - Spirax Sarco

SX25 Series Process Controller - Spirax Sarco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.5 Parameter description<br />

First Group<br />

The controller parameters have been<br />

organised in groups, according to their<br />

functionality.<br />

A2SP<br />

A3SP<br />

AL2 alarm<br />

threshold<br />

AL3 alarm<br />

threshold<br />

The alarms use OP1, OP2 and OP3<br />

outputs in different ways, according to<br />

the configured types of alarms, as<br />

illustrated.<br />

With double action control output,<br />

(VMD or heating and cooling).<br />

There is only one control output left.<br />

Alarm AL2 and AL3 will share the<br />

same output. (see table on page 14).<br />

Proportional<br />

Pb band<br />

This parameter specifies the<br />

proportional band coefficient that<br />

multiplies the error (SP - PV)<br />

t¡<br />

Integral<br />

time<br />

The integral time value specifies the<br />

time required by the integral term to<br />

generate an output equivalent to<br />

the proportional term. When Off the<br />

integral term is not included in the<br />

control algorithm.<br />

td<br />

Derivative<br />

time<br />

The time required by the<br />

proportional term P to repeat the<br />

output provided by the derivative<br />

term D. When Off the derivative<br />

term is not included in the control<br />

algorithm.<br />

tc<br />

Control output<br />

cycle time<br />

Cycle time<br />

tc C<br />

cool<br />

This is the cycle time of the logic<br />

control output.<br />

30<br />

IM-P323-25 CH Issue 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!