03.09.2014 Views

Crisman Annual Report 2009 - Harold Vance Department of ...

Crisman Annual Report 2009 - Harold Vance Department of ...

Crisman Annual Report 2009 - Harold Vance Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(a) Standard EnKF for permeability estimation<br />

True Perm.<br />

(b) Prob. Map estimation with EnKF<br />

initial<br />

3 months<br />

6 months<br />

18 months<br />

36 months<br />

initial<br />

3 months<br />

6 months<br />

18 months<br />

36 months<br />

ens. mean<br />

ens. mean<br />

sample 5<br />

prob. map<br />

sample 5<br />

sample 4<br />

sample 4<br />

sample 3<br />

sample 3<br />

sample 2<br />

sample 2<br />

sample 1<br />

sample 1<br />

Fig. 1. Facies estimation from production data using the standard EnKF implementation (a), and application <strong>of</strong> EnKF<br />

to update the probability map <strong>of</strong> facies distribution (b). In (a), the First to Fifth rows show the evolution <strong>of</strong> sample<br />

permeability fields in time (after update steps) with the mean <strong>of</strong> 300 samples shown in the Sixth row. In (b), the<br />

update to the probability map is shown in the First row while the resulting permeability facies from the SNESIM algorithm<br />

are shown in the Second to Sixth rows. The last row contains the mean <strong>of</strong> the 300 sample permeabilities.<br />

80<br />

<strong>Crisman</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!