25.09.2014 Views

Glandless Pumps - THERMO-ECO-ENGINEERING úvod

Glandless Pumps - THERMO-ECO-ENGINEERING úvod

Glandless Pumps - THERMO-ECO-ENGINEERING úvod

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Heating, Air-conditioning, Cooling<br />

Standard pumps (twin-head pumps)<br />

Equipment/function Wilo-Star-RSD, TOP-SD, SE-TW, DOP<br />

Wilo-Star-RSD<br />

(ClassicStar)<br />

Wilo-TOP-SD Wilo-SE-TW Wilo-DOP<br />

(max. 2850 1/min) (max. 2850 1/min) (max. 2880 1/min) (max. 1400 1/min)<br />

Equipment/Scope of delivery<br />

Wrench attachment point on pump body – – – –<br />

Double switchover valve in pump housing • • • •<br />

Cable entry possible on both sides • •<br />

(only for 1~ and 3~<br />

pumps with<br />

P 2 180W)<br />

– –<br />

Quick connection with spring clips • – – –<br />

Integrated air extraction fitting for automatic rapid<br />

ventilator Rp 3 / 8<br />

– – – –<br />

Plug-in slot for optional expansion with Wilo-<br />

IF-Moduls<br />

– – – –<br />

Blocking current-proof motor • – – –<br />

Including seals for threaded connection (loose) • •<br />

(only for<br />

TOP-SD30/5)<br />

•<br />

(only for<br />

SE 125-N-TW)<br />

Including installation and operating instructions • • • •<br />

Including thermal insulation – – – –<br />

–<br />

Including washers for flange bolts<br />

(for DN 32 - DN 65 nominal connection diameters)<br />

– • • –<br />

Incl. 1.8 m power cable with grounding plug – – – –<br />

Integrated non-return valve – – – –<br />

Integrated ball shutoff valve – – – –<br />

Including time switch – – – –<br />

• = available, – = not available<br />

200 Subject to change without prior notice 09/2006 WILO AG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!