26.09.2014 Views

Performance Report Card for Mid Term Review of VTIP - Directorate ...

Performance Report Card for Mid Term Review of VTIP - Directorate ...

Performance Report Card for Mid Term Review of VTIP - Directorate ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PREFACE<br />

About the <strong>Mid</strong>-<strong>Term</strong> <strong>Report</strong><br />

This report is based on analysis <strong>of</strong> detailed data provided by individual ITIs using a standard reporting<br />

tool. Data has been provided by the ITIs at six month intervals, in April and October <strong>of</strong> every year since<br />

project effectiveness in December 2007. For the year 2006-07, project ITIs <strong>for</strong> that year provided data<br />

retrospectively. Where necessary, in<strong>for</strong>mation provided by the ITIs is supplemented from in<strong>for</strong>mation<br />

available with the State Project Implementation Units and the National Project Implementation Unit.<br />

The base-line data on pass rates and labor market outcomes was collected through a comprehensive<br />

survey <strong>of</strong> all government ITIs and through a rigorous and nationally representative Tracer Study in 2005-<br />

06. The follow-up Tracer Study is currently underway and its findings will become available soon. Data<br />

on average salary <strong>of</strong> employed trainees provided in the state report cards in the <strong>Mid</strong>-<strong>Term</strong> <strong>Report</strong> should<br />

be considered as indicative and provisional till the findings from the Tracer Study become available.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!