of walls 25<br />

Bars in top of ground slabs 20<br />

Bars near faces in contact with soil 40<br />

The placing of all reinforcement will be checked by the Engineer and in no case is concrete to be<br />

poured around any steel that has not been passed by him. The Contractor is to ensure that no steel<br />

is displaced from its position during the placement of concrete and until the concrete is set.<br />

The insertion of bars into or removal of bars from concrete already placed will not be permitted.<br />

Reinforcement temporarily left projecting from the concrete at the joints shall not be bent without<br />

the prior approval of the Engineer.<br />

Secondary reinforced concrete members for which no reinforcement details are given in the<br />

drawings or the Particular <strong>Specifications</strong> shall have a minimum ratio of reinforcement area to<br />

concrete area of 0.33 % .<br />

4 Concreting<br />

Cement<br />

The cement used shall be Portland Cement conforming in all respects to ASTM Standard<br />

Specification C150 , type 1 , or to BS 12 , unless otherwise required , bags shall contain<br />

50kg net + 1% .<br />

If cements other than the above are required they shall be covered fully by the Particular<br />

Specification.<br />

The Contractor shall at all times furnish the Manufacturer's statement of the above Standard<br />

<strong>Specifications</strong> together with the date of manufacture, certified by an independent agency in the<br />

country of origin approved by the Engineer .<br />

The cement shall be delivered to the site by the Contractor in the original sealed and branded bags<br />

or containers of the manufacturer in batches not exceeding 100 tons and shall be stored in a proper<br />

manner off the ground to prevent deterioration . Each batch shall be stacked separately and used in<br />

the order of delivery. No cement shall be used which has been manufactured more than twelve<br />

months prior to its proposed use on site .<br />

All cements whether stored in bulk, bags, or containers in warehouses or on site shall be sampled<br />

for testing according to ASTM C183 (Methods of Sampling Hydraulic Cements). Test samples<br />

over and above those specified shall be taken at any time if so requested by the Engineer. Testing<br />

of cement shall be in accordance with the methods required by ASTM C150 and C175 or BS 12 or<br />

any other accepted by the Engineer .<br />

Aggregates<br />

This specification covers fine and coarse aggregates other than lightweight aggregates for use in<br />

the production of concrete.<br />

When lightweight aggregates are required they shall be defined in the Particular Specification.<br />

The aggregates shall be crushed gravel or stone and shall comply with BS 882 for graded or<br />

single size aggregate and shall be obtained from any quarry in the mountains approved by the<br />

Engineer . For convenience part of Clause 5 of BS 882 (grading) including Tables 1 , 2 and 3 are<br />

reproduced herein .<br />