1 General<br />

SECTION: 4<br />

NATURAL STONE WORKS<br />

Contractor must submit two sets of each type of stone, full size units as selected by the Supervising<br />

Engineer to the project site, in sufficient number to indicate the full range of color, texture and each type of<br />

the full range of color, texture and each type of finish. One of each of the duplicate samples approved by<br />

the Engineer, the other being returned to the stone supplier ,for his guidance. Colors and types of stone –<br />

dressings are as mentioned under part 2- Products, paragraph B, "Stone Schedule".<br />

The following physical data on all proposed stone shall be submitted y the supplier :-<br />

1. Analysis of mineral composition .<br />

2. Analysis of chemical composition .<br />

3. Thermal sufficient of expansion .<br />

4. Absorption<br />

5. Specific Gravity .<br />

6. Modulus of Rupture<br />

7. Abrasion Resistance .<br />

Anchors : Two of each type to be incorporated in the work .<br />

Submit samples of other materials specified herein upon request by the Engineer .<br />

2 MOCK UP<br />

1. Furnish and install a typical stone wall, application required for the project at area designated by the<br />

Engineer. The panel shall be constructed for Engineer's approval showing 2.0m long x 1.5m high for wall<br />

installation . Wall installation shall include a corner condition indicating a jamb, sill, lintel and coping<br />

stones, etc., as shall be instructed by the Supervising Engineer.<br />

2. All work shall include setting and jointing of all stone including final cleaning as specified here in for<br />

the actual work and as required for approval Construct as many mock-ups until approval by the Engineer<br />

has obtained .<br />

3. The approved mock-up shall constitute the quality of work to be expected throughout the entire project,<br />

and shall remain in place for visual inspection until no longer needed as directed by the Engineer. The<br />

removal and disposition of the moc-ups shall be done by the Contractor at his expense without additional<br />

cost to the owner .<br />

GUARANTEE / WARRANTY<br />

Attention is directed to the provisions of the CONDITIONS OF THE CONTRACT regarding guarantees /<br />

warranties for the Work .<br />

All warranties / guarantees to be issued by the Supplier, Manufacturers and sub-contractors shall be<br />

counter-signed by Main Contractor and both of them will be liable for repair / replace the items / works,<br />

etc., during the warrantee / guarantee period.<br />

STANDARDS<br />

A. Applicable provisions of the following standard publications shall apply throughout the work :<br />

1. Building stone Institute : "Recommended Practices for the use of Natural Stones in Building<br />

Constructions" .<br />