- Page 1: ATLAS 57544 : Construction of Menta
- Page 5 and 6: 2. The contractor is to submit samp
- Page 7 and 8: The contractor shall submit to the
- Page 9 and 10: (1) is obtained at a lesser depth t
- Page 11 and 12: SECTION: 3 1 General CONCRETE WORK
- Page 13 and 14: All reinforcement shall be free fro
- Page 15 and 16: Coarse aggregate : the grading of c
- Page 17 and 18: The terms contained in Table 4 are
- Page 19 and 20: The Contractor when tendering havin
- Page 21 and 22: last more than 30 seconds. The vibr
- Page 23 and 24: the minimum strength specified for
- Page 25 and 26: 2. American Welding Society (AWS):
- Page 27 and 28: 1. The finish , of exposed to view
- Page 29 and 30: The type, location and number of la
- Page 31 and 32: Joints noted to receive sealant sha
- Page 33 and 34: 1 Manufacture SECTION: 5 BLOCKWORK
- Page 35 and 36: The plasticiser shall be used stric
- Page 37 and 38: −Asphalt sheets should be supplie
- Page 39 and 40: SECTION: 7 1 General PLASTER WORK T
- Page 41 and 42: Bonding agents where required shall
- Page 43 and 44: 9 Steel Mesh Lathing, Stops And Bea
- Page 45 and 46: Cement And Sand Tile Dimensions Siz
- Page 47 and 48: Glazed ceramic floor tiling shall b
- Page 49 and 50: Tiles shall be cleaned off as soon
- Page 51 and 52: The Contractor shall not be permitt
- Page 53 and 54:
11 Architraves , Door Stops etc. Ar
- Page 55 and 56:
Ironmongery is to be hard satin ano
- Page 57 and 58:
Glazing sections shall be in specia
- Page 59 and 60:
SECTION : 12 PAINTING AND DECORATIN
- Page 61 and 62:
Fair faced concrete and/or cement a
- Page 63 and 64:
Externally a cement type paint may
- Page 65 and 66:
4 Wired Glass Wired glass shall be
- Page 67 and 68:
16 Cleaning etc The Contractor shal
- Page 69 and 70:
All hangers and supports shall be o
- Page 71 and 72:
2 COLD WATER SERVICES 2.01 GENERAL
- Page 73 and 74:
plastic pipes, manufactured to ASTM
- Page 75 and 76:
3 HOT WATER SERVICES 3.01 GENERAL R
- Page 77 and 78:
All pipeworks rimming in buildings
- Page 79 and 80:
B. Steel Boiler The steel boiler sh
- Page 81 and 82:
Mechanically; sealed condensing and
- Page 83 and 84:
e indicted in the installation inst
- Page 85 and 86:
6 SANITARY FIXTURES 6.01 GENERAL RE
- Page 87 and 88:
7 VENTILATION 7.01 TOILET EXTRACT F
- Page 89 and 90:
8 STANDARDS 8.01 INTRODUCTION This
- Page 91 and 92:
The Contractor shall demonstrate, i
- Page 93 and 94:
The composite panels shall then be
- Page 95 and 96:
To facilitate routine maintenance,
- Page 97 and 98:
shall in all cases be of good quali
- Page 99 and 100:
1) Purpose-made mild steel band (mi
- Page 101 and 102:
c) Guides provided. Each such dista
- Page 103 and 104:
Thermometers shall be fitted on eac
- Page 105 and 106:
Each such equipment shall be mounte
- Page 107 and 108:
material. The metal sleeve outside
- Page 109 and 110:
All tests are to be carried out bef
- Page 111 and 112:
APPENDIX NO. II VALVES Service Type
- Page 113:
APPENDIX NO. III The following tabl
- Page 116 and 117:
2. The Electrical & Communication S
- Page 118 and 119:
The contractor will be responsible
- Page 120 and 121:
1. General Electrical Switchboards
- Page 122 and 123:
i. The plans must include the manuf
- Page 124 and 125:
h. Contactors will be as made by "T
- Page 126 and 127:
2. The contractor prior to commence
- Page 128 and 129:
g. All metallic cable conduits must
- Page 130 and 131:
3. Preparatory Works for the Instal
- Page 132 and 133:
1) All fluorescent tubes shall have
- Page 134 and 135:
1. General Measurement & Payment Me
- Page 136 and 137:
4) Connections of pipes to building
- Page 138 and 139:
special for UPS sockets, installed
- Page 140:
conductor length- as required. The